Key Takeaways
- EBITDA per ton halved on clinker shortage: EBITDA per ton fell to ₹715 from ~₹1,000 as planned shutdowns at Maihar and Mukutban forced expensive external clinker purchases, a one-off drag management says is now resolved.
- Mix shift protected realizations: Blended cement share jumped from 82% to 89% sequentially and trade share from 72% to 78%, cushioning the impact of lukewarm Central region prices.
- Clinker self-sufficiency restored: Management committed to zero clinker purchases in Q2, Q3 or Q4, with Mukutban volumes set to return to the ramp-up plan.
- Volume growth guidance held at 6–7% annually, capex at ₹1,000–1,100 crores, and net debt expected below ₹3,000 crores: the long-term building blocks remain intact.
- What to watch next quarter: Whether the lost Mukutban volumes actually recover, the pace of blended cement and trade share normalization, and any pricing direction as monsoons play out.
The Clinker Shock: What Broke and Why It Is Over
- Two simultaneous planned shutdowns at Mukutban (heavy rains) and Maihar (certain problems) created a clinker deficit that forced the company to buy clinker from competitors at no discount, a heavy charge versus own production at Maihar, its lowest-cost plant.
- The reversal was sharp: in prior quarters the company was a net seller or swapper of clinker in some markets; this quarter it became a buyer, creating a significant delta in EBITDA per ton.
- Volume loss at Mukutban compounded the damage because the region had achieved its ramp-up and the market was performing well, so shutdown meant lost potential sales in a strong area.
- Management declares the shortage resolved: no clinker purchase expected in Q2, Q3 or Q4, and the company is back to self-sufficiency.
Sandip Ghose: "I don't see our clinker shortage situation continuing, okay? So, we are not buying any clinker just now, and I don't expect to buy any clinker going forward either in Q2 or Q3, Q4."
Realization and Mix: Defending Price in a Soft Market
- Central region prices were lukewarm, roughly a 2% hit, while the company's small East presence (Durgapur) limited its ability to capture East price increases; weighted average realization was pulled down by the lower-priced Mukutban region.
- Blended cement proportion improved from 82% to 89% sequentially, a shift management attributes to brand strength and distribution muscle, not discounting.
- Trade sale proportion rose from 72% to 78% sequentially, with non-trade sales reduced dramatically and OPC share cut in favor of blended and premium products.
- Premium portfolio buttressed in Central region: three brands (Perfect Plus, Ultimate, Samrat Advance) each occupy their own segment, and Perfect Plus is now acknowledged as operating at par with or above some A-category competitors.
- Mukutban premium mix improved from ~40% to 50% of sales in its region.
- Net realization was maintained through the premium commanded despite price pressure in Central India.
Sandip Ghose: "And that change of 82% to 89%, I hope all of you will recognize, appreciate. It's a reflection of our brand strength, our marketing, sales and distribution strength. This is something I'd like to emphasize because anybody wanting to turn the switch on and off are not able to do it so easily without sacrificing their brand premiums or increasing discounts or whatever."
Volume and Capacity: Running Hot, Adding Carefully
- Capacity utilization runs "much higher than" 90%, with further debottlenecking in the pipeline to increase it further.
- Volume growth guidance of 6–7% annually was maintained, with Central India expected to add volumes and market share through debottlenecking and other initiatives.
- Mukutban clinker is now moving profitably as far as Durgapur in the East, demonstrating geographic flexibility in the logistics network.
- Chanderia utilization in the core market has risen significantly, linked to how those markets performed versus neighboring regions.
- No clinker capacity addition before FY27, though the Kundanganj new line will be commissioned during the year.
- Value share, not volume share, is the strategy: with limited volume, the company focuses on maximizing returns from existing assets and operating in the "cream" of the Central India market, where infra-led growth and premiumization by individual house builders and retail are the trend.
Sandip Ghose: "We focus on our strategy, and that has been, as you know, focusing on our value share. Now, at this juncture we are not worried about volume share as much because, obviously, since we have a limited volume, so we would like to improve our value share wherever possible. And there is no hiding this fact. There's nothing to be, as I said, defensive or apologetic."
Costs: Fixed Overheads and the Clinker Purchase Penalty
- Employee cost rose QoQ as a function of fixed costs absorbing lower volumes, with no unusual driver beyond standard increments.
- Depreciation declined 10% YoY due to shutdown (fewer running days), certain limestone depreciation coming down, and some assets reaching 5% residual value where depreciation stops.
- Clinker purchased externally carried a "fairly heavy charge" compared to own production at Maihar, the company's lowest-cost producer, but management declined to quantify the exact delta or the absolute EBITDA impact of the abnormal quarter.
- Fuel cost at Mukutban was disclosed at 146 (per an analyst's question), with lead distance at 342.
Capital Allocation and the Jute Segment
- Full-year capex guidance held at ₹1,000–1,100 crores, with no change from the prior quarter; management did not provide a breakup of the remaining ~₹900 crores by bucket.
- Net debt expected to close below ₹3,000 crores.
- WHRS expansion: planning an additional ~10 megawatts of waste heat recovery capacity, taking the total to ~50 megawatts once complete; spending amount and payback period were not disclosed.
- Jute segment is reducing dependence on government orders, improving non-government domestic orders and exports, and modernizing with modern looms.
- Long-term growth plans unchanged: building blocks including mining rights acquisitions are falling in place for commitments by 2027 and 2030.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Clinker self-sufficiency | Zero clinker purchases | Q2, Q3, Q4 FY26 |
| Mukutban volume recovery | Return to ramp-up plan | From Q2 FY26 |
| Annual volume growth | 6% to 7% | FY26 |
| Full-year capex | ₹1,000–1,100 crores | FY26 |
| Net debt | Below ₹3,000 crores | FY26 close |
| Kundanganj new line | Commissioning | During FY26 |
| Next clinker capacity | No addition before FY27 | FY27 |
| WHRS total capacity | ~50 megawatts (additional ~10 MW planned) | Once complete |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Revenue | Not stated |
| EBITDA per ton | ₹715, down from ₹1,000-odd in Q4 FY25 |
| Operating margin | Not stated |
| Net profit | Not stated |
| Volume mix by region | Central 50%, East 21%, North 16%, West 13% |
| Blended cement proportion | 89%, up from 82% QoQ |
| Trade sale proportion | 78%, up from 72% QoQ |
| Mukutban volume | 6.6 lakh tons |
| Premium share in Mukutban | 50% of sales, up from ~40% |
| Fuel cost (KKL) | 146 |
| Average lead distance | 342 km |
| Incentives accrued | ₹23 cr, vs ₹41 cr in Q4 FY25 |
| Capex incurred | ₹100 cr |
| Full-year capex guidance | ~₹1,000–1,100 cr, unchanged |
| Net debt | ~₹2,300 cr, expected to close FY26 below ₹3,000 cr |
| Annual volume growth guidance | 6–7%, maintained |
| WHRS capacity | ~40 MW current, planning additional ~10 MW to reach ~50 MW |
| Clinker purchased externally | ~1 lakh ton in Q1, due to extended shutdowns at Mukutban and Maihar |
| Central region price change | ~-2% |