Key Takeaways
- Externally battered quarter, candid tone: Management called Q2 “extremely tough” as war-driven fiber costs, collapsing PVC prices and a European demand freeze hit both HIL India and Parador simultaneously.
- Parador is the acute pain point: European flooring demand fell >30%, forcing short-time work in Germany; the CEO chose to absorb PBT losses rather than destroy the structure, betting on a post-winter demand spree.
- India margins squeezed by raw materials, not demand: Roofing fiber costs up 15–20% YoY and PVC down >25% in Q2 crushed profitability; NSRs did not rise to compensate, and competitive intensity stayed high.
- The USD 1 billion ambition is intact but distant: Management reaffirmed the FY26 target, but the near-term path runs through a Parador turnaround, construction chemicals ramp-up, and pipes scaling to ₹1,000 crore, all while external headwinds persist.
- What to watch next quarter: Whether Parador reaches EBITDA breakeven, whether PVC prices finally bottom, and whether the promised Q4 India demand resilience materializes.
Parador: The European Crisis & the Bet on Recovery
- Demand collapse: Footfall for renovation materials including flooring saw 30% degrowth in DIY and multiples across Europe; the entire flooring industry is hurting, with many competitors and suppliers announcing plant shutdowns.
- Country-level divergence: Spain, Switzerland, Sweden, Norway and Denmark are battling through better; Parador is doing far better than competitors overall.
- Engineered wood as lifeline: The Austrian plant runs at full capacity with an order backlog to end of February, sustained by project orders from Nordic countries and Spain; the German Coesfeld factory is at 60% utilization because DIY orders have come down immensely.
- Cost actions without destruction: Management obtained government permission for Kurzarbeit (short-time work) in some departments, where employees work fewer days and receive 60% salary from the company with part of the remainder from the government.
- Raw material benefit delayed: Raw material costs in SAP remain high because they were locked in earlier; a 20–25% discount over peak prices has been obtained, but the benefit will flow to profits only after a quarter as the company deliberately reduces inventory rather than buying more material.
- Inventory deliberately drawn down: Inventory was built to ~€47 million mid-last quarter to secure supply when wood was scarce (40% of world wood from Ukraine/Russia); now raw material availability is no longer a problem, so a concerted effort is underway to bring inventory to a €40 million peg, with no dead inventory in the system.
- Electricity hedge: 100% of CY2022 electricity cost was locked in February before the war at a low base, keeping power and fuel at 2.5% of sales; 60% of Coesfeld and 40% of Guessing next-year requirements are also pre-frozen, with the remainder held back pending possible government rebates in Germany and Austria.
Dhirup Roy Choudhary: "I had 2 choices with me. One is lament under the present crisis and therefore, start reducing costs in a big, big way and be defensive, and thereby, maybe in a way, destroy the structure of Parador, which would have been quite a futuristic disruption. And the second was to accept that we will lose some money in PBT, but at EBITDA, keep it awake for better times to come, which I believe will take a quarter or 2 at the most."
Roofing: Margin Compression from Fiber & Freight
- Fiber cost shock: Fiber scarcity from Russia and Kazakhstan due to the war forced all buyers to Brazil; Brazilian costs went up and suppliers raised prices immensely, with fiber costs up 15–20% YoY, and new suppliers also change the fiber mix, increasing cost of production.
- Sea freight stuck high: Sea freight from Brazil to India has not come down, adding to the cost stack alongside higher cement and electricity costs across all factories.
- NSRs did not compensate: HIL sustained price supremacy and kept selling prices higher than last year, but NSRs have not risen enough to offset the cost surge; management is making determined efforts to take some price rise to mitigate the cost differential.
- Competitive intensity caps pricing power: The industry has 35% excess capacity, with two competitors adding new asbestos roofing lines; if competition makes a determined effort only to sell volumes, market prices cannot go up beyond a level, and HIL’s huge NSR differential with the rest is difficult to sustain beyond a point.
- Demand outlook benign: Rains were very good this year, so no demand problem is expected next year; single-digit growth is expected in roofing over the next 3–4 years.
- Fiber price relief expected: Fiber prices are expected to soften once Russia and Kazakhstan start supplying in a good way, in the next 2–3 quarters; Brazilians are also likely to increase capacity as they are full with orders.
- Asbestos risk managed: Management sees no problem in the immediate future in India because no competitive material exists, and the rural sector relies on cost-effective, high-strength, high-longevity products; if asbestos is banned, the non-asbestos Charminar Fortune product can be made from every manufacturing facility that makes asbestos roofing, enabling 100% replacement.
Dhirup Roy Choudhary: "I do not see a problem in the immediate future in India because there is no other competitive material to asbestos roofing in the whole world. And the rural sector relies immensely on cost-effective, high strength, high-longevity products."
Polymer Solutions: PVC Price Collapse
- PVC price freefall: PVC prices dropped more than 25% in Q2 and 38% in H1, driven by global overcapacity: US operations restarted after being closed last year, Europe has huge excess capacity, and China is dumping products.
- Demand frozen by expectations: Primary stockings are not happening because every customer expects a further drop in pipe selling prices; an INR 7 drop has already occurred this quarter, and CPVC prices are realistically expected to drop another INR 7–10 before bottoming.
- Inventory losses hit bottom line: The price decline substantially reduced brand restocking across the industry and severely impacted the bottom line owing to inventory losses, with forex adding to the woes.
- Breakeven conditional on PVC stability: If PVC prices do not drop further, pipes should breakeven at EBITDA terms in the current quarter; if PVC prices drop, inventory losses add to the woes.
- Bottoming thesis: Management sincerely hopes PVC prices have almost bottomed out, with further reduction of at most INR 10, after which things are expected to move up; some Indian companies selling PVC are already not making positive margins.
Dhirup Roy Choudhary: "I don’t think this is more from the suppliers’ intention, this is more an overcapacity globally, which is ruining the PVC prices."
Building Solutions & Construction Chemicals: The Growth Engines
- Building Solutions transformation: The segment has grown from under ₹150 crore to ₹400 crore, with double-digit profitability this year; EBITDA margins improved from 4–6% historically to 13%, credited to the team, and management is positive margins can continue and only improve from here.
- Solution-sale model working: Strategic efforts to convert from product sale to solution sale are reaping results; a sales and technical solutions team onboarded many new customers from Tier 2 and Tier 3 cities, leading to higher realization and favorable payment terms, with fully utilized capacity.
- Growth ambition: The segment will grow to at least ₹800 crore in 3–4 years, with management determined not to add too many assets; growth will come through the outsourcing route and add-on intelligent capex, with opportunistic block capacity additions being evaluated.
- Construction chemicals launch: Onboarded 32 team members, 100 channel partners, launched 25 products and 170 SKUs in the market within the first 6 months; revenue reached ~₹7 crore in H1, with the model entirely traded so no capex.
- Ramp-up trajectory: Management aims to ramp to ₹2–3 crore per month, with the ambition to take the business to ₹300+ crore in the next 2–3 years; any segment below ₹300 crore is considered non-viable from an HIL perspective, and the company will consider buying a company or two to extend SKUs when needed.
Dhirup Roy Choudhary: "Construction chemical, any segment which is below INR 300 crore is non-viable from an HIL perspective. And I would like to take this segment, which is our next dream segment to INR 300 crore as soon as possible."
India Portfolio: Pipes, Putty & the Scaling Plan
- Pipes target: Committed to take pipes to ₹1,000 crore in the next 3 years, with profitability expected to be quite good at that level as seen for established players at ₹1,000+ crore; three manufacturing locations cover North, West and South India, with enough capacity within existing facilities and no need for outsourcing.
- Putty target: Scaled down to ₹400–450 crore in the next 3 years, softened from an earlier ₹600 crore estimate, as the business faces severe competitive pressures and raw material cost increases.
- Combined pipes and putty: ~₹1,400 crore in the next 3 years.
- Brand activation deferred: More ATL spending on pipes will come as the business takes lead; more brand activation is expected in a couple of months as PVC prices stabilize.
- Overall India demand: Management sees resilience of demand going up in Q4 for sure in India, which will be helpful to companies that have kept their fabric absolutely in order and ready to grow.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Parador EBITDA breakeven | Attempts are towards breakeven on EBITDA | Q3 FY23 (management says “too early to comment”) |
| Parador demand recovery | CEO’s bet: demand spree similar to post-COVID arrives after winter; preparing for bumper performance | From February, into next year |
| PVC price bottom | Further reduction of at most ₹10; CPVC another ₹7–10; then things move up | Next 1–2 months of negative impact, then recovery |
| Pipes EBITDA breakeven | Breakeven at EBITDA terms | Current quarter (Q3 FY23), conditional on no further PVC price drop |
| Construction chemicals ramp | Ramp to ₹2–3 crore per month; target ₹300+ crore | Monthly ramp from now; ₹300 crore in 2–3 years, positively within 3 years |
| Pipes revenue target | ₹1,000 crore | Next 3 years |
| Putty revenue target | ₹400–450 crore | Next 3 years |
| Building Solutions revenue target | At least ₹800 crore | 3–4 years |
| Parador doubling | Double Parador from where it is | Next 3–4 years |
| Consolidated revenue target | USD 1 billion (~₹7,000–7,500 crore) | FY26 (2025–26) |
| Fiber price softening | Expected once Russia and Kazakhstan start supplying in a good way | Next 2–3 quarters |
| Parador raw material benefit | 20–25% discount over peak prices flows to profits as inventory depletes | After one quarter |
| Parador inventory peg | Bring inventory down to €40 million | Until sales return at full speed |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Consolidated revenue | ₹764 cr, vs ₹766 cr in Q2 FY22 |
| Consolidated EBITDA | ₹20 cr, vs ₹68 cr in Q2 FY22 |
| H1 FY23 consolidated revenue | ₹1,849 cr, +6% YoY vs ₹1,749 cr in H1 FY22 |
| H1 FY23 consolidated EBITDA | ₹156 cr, vs ₹241 cr in H1 FY22, margin down 530 bps |
| H1 FY23 PAT | ₹80 cr, vs ₹126 cr in H1 FY22 |
| Net worth | ₹1,192 cr, +8% YoY |
| Consolidated debt | ₹300 cr, debt-to-equity ratio 0.25 |
| Roofing Solutions revenue | ₹197 cr, +5% YoY |
| Building Solutions revenue | ₹123 cr, +29% YoY |
| Polymer business revenue | ₹126 cr |
| Flooring Solutions (Parador) revenue | ₹315 cr |
| Indian business H1 FY23 growth | 14% |
| PVC price decline | >25% in Q2, 38% in H1 |
| Parador demand decline in Europe | >30% in major operating regions |
| Building Solutions EBITDA margin | 13%, up from 4–6% in earlier years |
| Parador power and fuel cost as % of sales | 2.5% |
| Construction chemicals H1 FY23 revenue | >₹7 cr |
| Roofing segment steady-state EBITDA margin | 20–22% |
| Parador gross margin | 35%, down from 40% like-to-like |
| Fiber cost increase YoY | 15–20% |
| Roofing H1 FY23 margin dip | 8% |
| Parador inventory | €41–42 million, target to peg at €40 million |
| Non-asbestos roofing product sales (H1 FY23) | >11,000 metric tons |
| Pipes revenue target | ₹1,000 cr in next 3 years |
| Putty revenue target | ₹400 cr in next 3 years |
| Construction chemicals revenue target | ₹300+ cr in next 2–3 years |
| Building Solutions revenue target | at least ₹800 cr in next 3–4 years |
| HIL overall revenue target | USD 1 billion by 2025–26 |
| Roofing market share in Q1 FY23 | 25% |
| Roofing segment size in India | 3.7–4.0 crore metric tons |
| Roofing segment excess capacity | at least 35% industry-wide, HIL at 20–25% |
| HIL roofing NSR premium over next competitor | 5–7% |
| Parador German factory capacity utilization | ~60% |
| Parador wood plant (Austria) utilization | fully utilized, order backlog to end of February |
| Parador CY2022 electricity cost | 100% locked at low base rates |
| Parador CY2023 electricity cost locked | 60% for Coesfeld, 40% for Guessing |
| India business tax rate | 25.17% |
| Parador tax rate | ~31.5% |
| Roofing retail connect | >20,000 points |
| Polymers distribution connect | 3,500–4,000 points |
| Pipes distribution growth | 270–300 new points per year |
| Faridabad pipe plant capacity utilization | ~85% |
| Thimmapur pipe plant capacity utilization | 100% |
| Golan pipe plant capacity utilization | ~50% |
| Construction chemicals team onboarded | 32 members |
| Construction chemicals channel partners | 100 |
| Construction chemicals products launched | 25 products, 170 SKUs |
| Construction chemicals monthly revenue aim | ₹2–3 cr per month |
| Parador raw material cost decline from peak | 20–25% in last 1–1.5 months |
| Odisha boards Capex | ~₹20 cr, already operational |
| Panels new plant Capex | ~₹28 cr, commercializing by February |
| German government subsidy to individuals | €200 one-time |
| German government support package declared | €200 billion, details unclear |