- Group EBITDA margin guide - Management expects operating EBITDA margin to grow 20-25% over the next two to three years, on top of EBITDA/ton already rising from \~₹9,100 in FY25 to \~₹13,500 in Q1 FY27. The guide is backed by a mix shift toward high-value products already at 60.4% of Q1 FY27 revenue and heading toward 70%.
- Unit 3 foundry for ICDP/HSS rolls - A third unit for ICDP rolls, HSS rolls and engineering castings is under construction with most machinery ordered and startup expected in Q1 FY28, funded from internal accruals. It targets rolls India largely imports - HSS rolls are not currently manufactured domestically - against demand growing at an 8-10% CAGR to \~132-160 KT by FY30.
- ICDP/HSS import substitution - India's metal roll imports rose from \~39,000 units in FY20 to \~3.49 lakh units in FY26, with high-grade rolls imported from Germany, Russia and Japan at up to 4x Indian market rates. The company's 1,800+ existing roll customers are the same buyers of these grades, so day-one trial orders are expected once Unit 3 starts.
- IPO-funded capacity at Facilities 1 and 2 - The ₹301 crore IPO (listed 19 August 2026, subscribed 108.44x) puts ₹56 crore into new equipment and civil work at both facilities, with ₹68.26 crore to be deployed in FY27. Facility 2 capacity rises by 15,000 MT and the machining adds cut outsourcing costs, on a platform already running at 90.5% melting utilisation.
- In-house forging line - A 2000T hydraulic open die press, forging hammers and heat-treatment furnaces, funded with ₹27.78 crore of IPO proceeds, will add 15,000 MT of forged products capacity and eliminate outsourced forging. It unlocks valve steel (priced >2.5x cold rolled steel) and tool & die steel (\~105% premium), grades the company is deliberately shifting ingot output into.
- Defence and aerospace orders - Orders are already coming from Bharat Dynamics and Nuclear Power Corporation of India, with small prototyping revenue started and proper revenue expected in FY28 after the long approval cycle. Future capex targets defence-specific grades not made in India, supported by the government's 98% local-purchase push.
- Forward integration into big castings - CNC machine orders are placed for precision machining of large castings, alongside testing, shot blasting, NDT and a NABL-accredited lab to shorten customer qualification. Thermal power customers have shown order visibility till 2035, and single-piece casting capability has already been raised from 20 MT to 25 MT per piece.
- Solar capacity addition - A new 1,500 kWp rooftop plant (₹3.90 crore) plus ground-mounted solar funded from internal accruals are part of the ₹80 crore FY27 capex plan, with ₹75 crore targeted over the next three quarters. Power and fuel is already down to 5.9% of revenue in Q1 FY27 from 6.6% in FY26, and added solar pushes this further.