Borosil Renewables Ltd Q1 FY2023 Concall Summary

Source transcript PDF: https://assets.stockscans.in/docs/kpm9oidwxjefhc19ecf5fqpf.pdf

Key Takeaways


Margin Compression: The Cost-Price Squeeze

P. K. Kheruka: "We believe that the EBITDA margin during Q1 FY22 at 50.1% was abnormally high, a more sustainable level of EBITDA margin would be lower as mentioned in my earnings call."

Demand Environment: Robust but Supply-Constrained

P. K. Kheruka: "Most nations are trying to raise domestic production of solar cells and modules, and also trying to reduce dependence on Southeast Asia, which places India in an advantageous position for exports as well, particularly due to the fact that there are no serious capacities in other markets to produce solar glass."

Capacity Expansion: SG3 Nears, SG4 Reshaped

Management: "So, if you have no end in sight for solar modules, then there is no end to the demand for glass as well. But, as far as we are concerned, we are not talking beyond SG4 for the time being."

Interfloat Acquisition: On Pause After Furnace Leak

Management: "But the first question, whether we're looking at it as a stop button or a pause button, I would definitely say it's a pause button. It's not at all a stop button."

Policy Tailwinds & Competitive Landscape


Cost-Saving Initiatives & Energy Strategy

Management Team: "It will be imprudent on our part to enter into any long-term or medium-term contract for gas supply at the current prices."

Guidance & Commitments

CommitmentSpecificsTimeline
SG3 commissioning550 TPD furnace operationalOctober 2022
SG4 commissioning1,100 TPD furnace up and runningEnd of 2024
Captive green power plant10 MW solar plus wind plant commissionedDecember 2022
Anti-dumping duty continuationNew notification for two-year extension expectedAround 17th August 2022 expiry
Soda ash contract renewalNew contracts at prevailing (higher) pricesFrom January 2023
Cost-saving measuresBenefits from raw material measures and renewable power flowing inAlready started from July-September quarter; gradual reflection
Interfloat transaction decisionAssessment of furnace leak impact and renegotiation pathNo timeline given; "pause button, not stop button"

Key Metrics

MetricQ1 FY23
Net revenue from operations₹170 cr, +25% YoY
Revenue QoQ change-5% QoQ
Sales volume growth (quantitative)+23% YoY
Sales volume QoQ change-9% QoQ
Export sales₹39.5 cr, 23.3% of turnover
Average selling price (solar tempered glass)₹140.8 per mm, roughly flat YoY, +4.5% QoQ
EBITDA₹51.3 cr
EBITDA margin30.2%, down 2,000 bps YoY from 50.1% in Q1 FY22
PBT₹40.3 cr
PAT₹30.1 cr, -24% YoY from ₹39.6 cr in Q1 FY22
Domestic market share (solar glass)~25%, down from ~35% previously as demand grew while supply stayed constant
India import dependency (solar glass)~75% of requirement imported
SG3 brownfield expansion capacity550 tonnes per day, commissioning delayed 3 months, now expected October 2022
SG3 revised capex₹688 cr
SG4 expansion capacity1,100 tonnes per day, target commissioning by end of 2024
SG4 estimated capex₹1,400 cr
Equity raise approved for SG4up to ₹1,100 cr via new share issuance
Average furnace utilisation (FY22)449 tonnes per day on 450 tonnes per day capacity, ~100%
Soda ash contractLocked till Dec 2022 at Jan–Feb 2022 prices; spot prices ~30% higher
Average natural gas cost~₹35 per SCM; spot prices 2–2.5x higher
Term loan on books~₹250 cr overall
Captive renewable power plant10 MW (solar + wind), BRL holds 31.2% stake, commissioning expected Dec 2022
Contract electricity demand25 MW, consumption ~15 MW
Anti-dumping duty on Chinese solar glass10–11% at the low end, up to 60% for some manufacturers; expiry 17 Aug 2022, renewal expected
Countervailing duty on Malaysian solar glass9.71%
Domestic module manufacturing run-rate11–12 GW per annum, up from 6–7 GW in prior year
Module industry typical utilisation50–60%
New domestic solar glass capacity (other players)~1,000 tonnes per day (~6 GW) expected CY2023–early 2024
Borosil planned total capacity (SG3 + SG4)2,100 tonnes per day, equivalent to ~12.5 GW of module manufacturing
Interfloat/GMB acquisition statusOn hold pending assessment of furnace glass leakage; deal not lost