Key Takeaways
- PAT triples on revenue doubling, margin expansion, and cheaper debt: PAT hit ₹55 crores as revenue grew 107% to ₹832 crores, RE Power Sales EBITDA margin reached 84%, and the weighted average interest rate fell ~100 bps to 8.4%.
- FY28 EBITDA guided at minimum ₹3,000 crores: Management issued a formal minimum reported EBITDA target for FY28, representing roughly 2.3x growth over FY26, driven by a locked 2.5 GW+ under-construction pipeline and a supply-constrained demand environment.
- Execution capacity has scaled 4x but is now the binding constraint: Trailing 12-month capacity addition hit 1,740 MW, up from 450 MW two years ago, and management says the business is supply-constrained, not demand-constrained, with organizational gaps being actively addressed.
- Curtailment at Bikaner CTU is a known, contained drag: The project faces ~70% curtailment expected all year, but CTU is only ~13% of start-of-year run-rate EBITDA, limiting the full-year impact to roughly ₹170 crores.
- What to watch next quarter: Whether the 1.5 GW FY27 capacity addition target stays on track after a 500 MW Q1, the pace of BESS deal conversion from the three signed MOUs, and any update on the first domestic corporate bond issuance.
The FY28 EBITDA Commitment
Management translated its locked pipeline and execution trajectory into a formal minimum reported EBITDA target of ₹3,000 crores for FY28, a figure it described as roughly 2.3x the FY26 base. The guidance was issued in response to investor feedback asking for a multi-year visibility anchor beyond the current year's capacity build.
- Underpinned by contracted, under-construction volume: The contracted capacity under construction remains stable at 2.5 GW or more, enough to cover the next 18 months of growth, and the FY27 capacity addition target is a minimum 1.5 GW of new opex capacity.
- Run-rate heuristic offered as a bridge: Management declined to publish run-rate EBITDA quarterly, arguing assets take time to stabilize, but offered a historical rule of thumb: run-rate EBITDA at the close of a fiscal year will typically be 1x to 1.1x the reported EBITDA for the following year.
- Steady-state leverage disclosed: The net debt corresponding to ₹3,000 crores of EBITDA is expected to be roughly ₹16,000 crores, giving investors a capital-structure anchor alongside the earnings target.
Kuldeep Jain: "We are comfortable issuing a guidance to the street, that we will have a minimum reported EBITDA in FY28 of about INR3,000 crore. This is a substantial, which is nearly 2.3 times growth in 2 years between FY26 and FY28, so we are comfortable issuing that as a guidance, and that came from a feedback from a lot of you all, which is that we don't want to just look at how we're building and how we're doing the current year, but we'd like some estimate for next year as well."
Execution Capacity: The Binding Constraint
Management characterized the business as supply-constrained, not demand-constrained, pointing to a trailing 12-month capacity addition run rate that has scaled from 450 MW to 1,740 MW. The organization can now add roughly 1.75 GW per year, but leadership was explicit that a 3x step-up from here is not executable without risking penalties and customer trust, referring to contracted capacity additions over the next 2 years.
- Organizational gaps are acknowledged and under board-level review: Last Friday's board meeting with the NRC subcommittee discussed five to six areas of organizational gaps and what is being done to address them, a candid admission that rapid scaling has stretched teams.
- Project cost discipline provides a margin buffer: Over the last 3 to 3.5 years including the most recent quarter, all projects have been installed below budgeted cost, which protects returns even as execution pace accelerates.
- ALMM 2 deferral is being harvested for near-term capex savings: Projects planned through December 31st are being examined and pulled forward where possible to capture roughly ₹60 lakhs/MW in cheaper module costs, with some acceleration of client decision-making already visible at brownfield STU sites in Maharashtra and Karnataka.
Kuldeep Jain: "In any business which is growing so fast, it would be wrong to say that we have no gap or no teams which do not need improvement, you know, it is just not -- I would say that someone is lying if they said that..."
Demand Environment: Two Engines, Both Firing
CleanMax's demand story rests on two distinct growth engines, both of which management expects to sustain high growth rates. The conventional C&I segment grew roughly 2.2x in volumes at a ~46% CAGR, while the Data & AI segment grew roughly 10x between March 2024 and March 2026 and maintained a 42% share of contracted capacity.
- Conventional C&I penetration is still single-digit: Only about 7% of industrial power in India is procured through bilateral green sources, leaving a large runway, and the customer value proposition of 25%+ energy cost savings plus a lower carbon footprint remains intact.
- Data & AI is a gigawatt-scale renewables multiplier: Every 1 GW of data center IT load translates to roughly 6 GW of renewable energy capacity plus storage, equating to roughly ₹40,000 crores of investment, and management expects the market to expand at an "incredibly furious pace" as 5 to 10 GW of data center capacity comes online over the next five years.
- Hyperscaler market share expected to dilute on exploding volumes: CleanMax estimates its current share of hyperscaler business in India at roughly 35%, but management expects that percentage to come down as volumes explode, while absolute gigawatts from the segment remain very large.
- Customer quality and repeat business provide a sticky base: The share of AA/AAA/multinational clients remained above 80%, and roughly 80% of new contracted capacity in the last quarter came from repeat business from the existing base of 600 customers.
Kuldeep Jain: "Our view on Data and AI is that the market is going to expand at such an incredibly furious pace that there is space for many more players to come in and for everyone to win..."
Curtailment: A Contained, Transparent Drag
The Bikaner CTU project has faced roughly 70% curtailment since commissioning at the end of the last fiscal year or start of this one, and management recommended assuming heavy curtailment continues for the rest of FY27. The impact is material but bounded because CTU capacities represent only about 13% of start-of-year run-rate EBITDA.
- Full-year impact quantified at roughly ₹170 crores: If 70% curtailment persists for the full year, the impact on a ₹1,870 crores run-rate base at 13% CTU share works out to roughly ₹170 crores, and EBITDA would have been roughly 8 to 9% higher without it.
- No clear timeline from the transmission operator: Management stated it does not know when the transmission line will be fully built and curtailment will completely go away, noting that the number keeps changing, and recommended prudence in modeling.
- Koppal CTU project adds diversification: Two bays have been allocated with commissioning timelines of October 2026 and March 2027, and management has received assurance that even if the second bay slips slightly, the first bay has spare capacity and there is fungibility across the two BESS, so the 543 MW target should still be met.
Kuldeep Jain: "We don't know, honestly, and this number keeps changing, and therefore, we think we should all be prudent and assume that there is heavy curtailment for the rest of the financial year."
Margins: Operating Leverage at Work
Both segments delivered margin expansion driven by operating leverage as the capacity base scales. RE Power Sales EBITDA margin reached 84%, up from 76% a year ago and 75% two years ago, while RE Services EBITDA margin improved from 8.7% to 11.2%.
- SG&A leverage is the primary driver in Power Sales: The margin expansion from 82% to 84% year-on-year came purely because SG&A as a share of total income continues to decrease as the capacity base increases, and management expects further expansion.
- Tariff stability supports unit economics: The operational portfolio tariff stands at roughly ₹3.93 per unit, while the under-execution contracted tariff has risen to roughly ₹4 per unit, and management sees tariffs stabilizing to rising, with new volumes carrying similar profitability to existing volumes.
- Financing costs are falling: The weighted average cost of debt fell roughly 100 bps from 9.4% to 8.4%, driven by a credit rating upgrade to AA minus and strong asset-liability coverage with 23-year PPAs against 18 to 19-year loans.
- Unallocated EBITDA of ₹31 crores arises because certain expenses cannot be easily allocated between the two business segments on a megawatt basis, as determined in consultation with auditors.
BESS: Early Innings, Strategic Optionality
Management identified BESS as a huge potential growth opportunity and a natural evolution of the business, though it does not yet form a substantial part of the current-year capex program. The first BESS investment was greenlit this quarter, an STU project in Rajasthan, and MOUs have been signed with three clients in the past month alone.
- Three distinct C&I opportunity segments: BESS pairs daytime solar with storage to improve energy offset in solar-only states, captures daytime-to-evening peak price differentials in markets like Maharashtra, and serves customer tenders for BESS-as-a-Service.
- BESS enlarges the addressable market: Adding storage to solar increases the offset of power CleanMax can offer a customer, which expands the pool of addressable load. Internal estimates suggest a tariff of ₹3 or more, closer to ₹3.5 or more, per unit for the storage service alone, excluding the cost of generation.
- Not material to FY27 or FY28 guidance: BESS does not form a substantial part of the capex program this year, so the FY28 ₹3,000 crores EBITDA target does not depend on it.
Kuldeep Jain: "It is very valuable because if you do solar plus add BESS, it helps increase the offset of power that you can offer a customer, so it essentially enlarges the addressable market for CleanMax."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 capacity addition | Minimum 1.5 GW of new opex capacity; 400 MW already added in Q1 | FY27 full year |
| FY28 minimum reported EBITDA | ₹3,000 crores, roughly 2.3x FY26 | FY28 full year |
| Minimum opex capacity | 4.6 GW (3,100 MW start-of-FY27 base + ~1,500 MW new) | By 1 April 2027 |
| Koppal CTU commissioning | Two bays: 543 MW total | Bay 1: October 2026; Bay 2: March 2027 |
| Bikaner curtailment | Assume ~70% curtailment continues | Throughout FY27 |
| ALMM 2 deferral benefit capture | Pull forward projects to commission by December 31st to capture ~₹60 lakhs/MW cheaper modules | By 31 December 2025 |
| First domestic corporate bond | Tap DCM for inaugural bond issuance, enabled by AA minus rating | "Hopefully soon" (no date) |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue from operations | ₹832 cr, +107% YoY |
| RE power sales segment revenue | ₹528 cr, +47% YoY (₹358 cr in Q1 FY26) |
| RE services segment revenue | ₹300 cr, ~6x YoY (₹41 cr in Q1 FY26) |
| EBITDA (reported) | ₹462 cr, +68% YoY (₹274 cr in Q1 FY26) |
| EBITDA (adjusted reported) | ₹494 cr, +74% YoY |
| PAT | ₹55 cr, positive, driven by revenue doubling, margin expansion, and lower interest costs |
| RE power sales EBITDA margin | 84%, up from 76% in Q1 FY26 |
| RE services EBITDA margin | 11.2%, up from 8.7% in Q1 FY26 |
| FY28 minimum EBITDA guidance | ₹3,000 cr, ~2.4x FY26 EBITDA of ~₹1,290 cr |
| New capacity added in Q1 | ~500 MW (400 MW RE power sales, ~100 MW RE services) |
| FY27 minimum new opex capacity addition guidance | 1.5 GW, on track with 400 MW added in Q1 |
| Total contracted capacity | ~6 GW as of 30 June 2026 |
| Operational RE power sales capacity | 3.5 GW as of 30 June 2026 |
| Contracted under execution (RE power sales) | 2.5 GW, tariff of ~₹4 per unit |
| Trailing 12 months capacity addition | 1,740 MW as of June 2026, up from 450 MW a year ago |
| Weighted average interest rate | 8.4% as of June 2026, down ~100 bps from 9.4% in April 2025 |
| Net debt | ₹11,809 cr as of 30 June 2026, up from ₹9,684 cr as of 31 March 2026 |
| CTU curtailment at Bikaner project | ~70%, expected to continue through FY27; CTU is ~13% of start-of-year run-rate EBITDA |
| Data and AI share of contracted capacity | 42%, grown ~10x between March 2024 and March 2026 |
| Share of new volumes from repeat business | ~80% in Q1 FY27 |
| Share of AA/AAA/multinational clients | Above 80% |
| Average PPA tenure | 23 years |
| Unique C&I customers | Nearly 600 |
| Credit rating | AA minus, upgraded from A+ |