Key Takeaways
- 33% EBITDA growth on operating leverage: EBITDA rose 33% YoY, driven by a 26% increase in power sales revenue and an EBITDA margin expansion from 81% to 83% as scale benefits kicked in.
- Contracted capacity tripled in two years: Contracted RE power sales capacity reached 5.7 GW, up 3x from 1.75 GW in March 2024, with 1.3 GW commissioned in the first 11 months of the fiscal year.
- Data & AI now 42% of the book: The data and AI segment grew nearly 10x from March 2024 to March 2026 and now represents 42% of contracted capacity, with new clients including Iron Mountain and Princeton Digital Group.
- Regulatory risk quantified at just 1.5% of EBITDA: Management ran a worst-case analysis on proposed regulatory changes and estimates the maximum EBITDA risk on 3 GW of contracted capacity is about 1.5% of EBITDA.
- What to watch next quarter: Whether the 1.5 GW capacity addition guidance for FY27 stays on track, the pace of data center client additions, and any movement on the Bikaner 2 transmission bottleneck expected to resolve in the October-December 2026 quarter.
Capacity Growth & Execution
- Contracted capacity tripled: Contracted RE power sales capacity grew from 1.75 GW in March 2024 to 5.7 GW, with operational capacity reaching 3 GW, a 76% YoY increase.
- Commissioning pace strong: 1.3 GW was commissioned in the first 11 months of the fiscal year, split 85% solar and 15% wind, demonstrating organizational capability ahead of the 1.5 GW FY27 target.
- Project execution track record: Projects have been built at 96.5% of Board-approved capex over the first nine months, a consistency management attributes to conservative underwriting and capable execution.
- Grid reliability: System-wide grid uptime remains above 99%, and wind power PLF performance over the last 12 months was better than any previously recorded period.
- Pipeline not lumpy: Contracted capacity grows steadily each quarter with an average deal size of 13 MW, and management declined to provide sales pipeline numbers, citing difficulty in reporting them credibly.
Kuldeep Jain: "we have built projects at 96.5% of the Board approved capex expense... it's not a flash in the pan, that number is very consistent across many years, indicating both conservative project cost underwriting as well as capable execution."
Data & AI Segment
- Nearly 10x growth in two years: The data and AI segment grew from a small base in March 2024 to 42% of contracted capacity by March 2026, making it the single largest segment.
- Two business models: About one-third of the segment supplies power directly to data centers in India, while roughly two-thirds uses EAPA structures where big tech pays the difference between assured revenue and market revenue from IEX sales.
- New client wins: Iron Mountain, L&T Data, and Princeton Digital Group were added as new clients, alongside increased volumes from existing clients like STT data centers.
- India's structural advantage: Management cited low renewable costs, a coal-heavy grid producing higher carbon intensity of offsets than China or Europe, and a welcoming contracting environment for big tech as reasons the C&I offset business flows to India.
Kuldeep Jain: "One of them is that, you know, people look at the cost per ton of carbon abated. Right, so India has two, three, four things going for it. One is of course low cost of renewables. Second is a coal-heavy grid so the carbon intensity of the offset is much more than you would enjoy say in China or Europe. And third is that the contracting structure, contracting discipline and welcomeness of big tech in India is a lot more than they find in China."
Client Profile & Contract Quality
- High-quality counterparties: 83% of contracted MWs are with AA, AAA, or multinational clients, and another 14% with A-rated clients, putting 97% of the book at A-rated or above.
- Repeat business dominates: About three-fourths of new volume growth each year comes from the existing base of over 570 clients, with new conventional C&I additions including GACL and CEAT.
- Long-dated PPAs: The weighted average PPA tenor is approximately 23 years, and the tariff for the 2.7 GW under execution is INR 3.84, providing long-term revenue visibility.
- Geographic diversification improving: The top two states, Karnataka and Gujarat, declined from 68% to 54% of capacity, with growth now coming from Maharashtra, Tamil Nadu, Haryana, Andhra Pradesh, and Rajasthan.
Kuldeep Jain: "CleanMax has more than 570 clients and every year about three fourths of our new volume growth comes from the same clients."
Margins & Operating Leverage
- EBITDA margin expansion: RE Power Sales EBITDA margin improved from 81% to 83%, driven by scale-driven operating leverage while gross margin remained stable at 92-93%.
- Structural margin story: EBITDA margin has risen from 75% in FY23 to 83% by December 2025 because SG&A costs do not grow at the same pace as EBITDA, and management expects further expansion to 85-86% over the next two to three years, albeit at a slower pace.
- RE Services margin jump: The services segment, which contributes 5-7% of EBITDA and requires no significant capital investment, saw its EBITDA margin improve from 15% to 22% on 40% revenue growth.
- Cost of borrowing declining: Weighted average interest rates fell from 9.2% to 8.7%, and further from 9.5% historically, driven by an improved credit profile, diversified funding sources, and the ability to refinance as assets stabilize.
- Capex efficiency advantage: The capex-to-EBITDA ratio of 5.8x is superior to the industry average of over 7x because CleanMax sells directly to end customers at higher tariffs of INR 3.6-3.8 rather than participating in reverse auctions where price is the sole determinant.
Unit Economics & Returns
- Return metrics stable or improving: Despite falling capital costs for solar and wind and slightly lower tariffs, ROI, ROE, equity IRR, and the capex-to-EBITDA ratio have stayed the same or marginally improved over recent years.
- Equity payback shortening: Equity payback for assets built in FY22 through FY25 was around 2.5 years, compared to a lifetime average of 3.4 years, reflecting improved returns on more recent projects.
- EAPA contracts commercially similar to standard PPAs: Management emphasized that EAPA agreements are long-term 25-year contracts with high-quality counterparties and a fixed, known tariff over the life of the agreement.
Kuldeep Jain: "Our equity payback for all assets built in financial year FY'22-FY'23, FY'23-FY'24, and FY'24-FY'25 was around two and a half years and in comparison equity payback for assets built in the lifetime of CleanMax was around 3.4 years."
Regulatory Risk & Balance Sheet
- Regulatory risk quantified: Management analyzed proposed changes including cross-subsidy surcharge removal and banking norm changes, estimating the maximum EBITDA risk on 3 GW of contracted capacity at about 1.5% of EBITDA even if all events occur simultaneously.
- No near-term equity raise planned: Management stated there is no intention of a QIB placement and believes the company is well funded for continued high growth over the next three years, though equity requirements will be assessed annually.
- Osaka Gas partnership operationalized: The 51%-owned joint venture, CORE, received INR 176 crores in equity investment from Osaka Gas for its 49% stake, and the partnership provides access to JBIC development finance and global capital.
- Management declined debt guidance: When asked for debt forecasts for FY27 and FY28, management declined to provide them, and also declined to give an annual EBITDA run-rate estimate for the 2.7 GW under execution.
Kuldeep Jain: "We've run all of those analysis Mihir and estimated that even if all of those events were to occur, then the maximum EBITDA risk to CleanMax on the 3 GW of contracted capacity is about 1.5% of our EBITDA, right."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Capacity addition | Build and commission upwards of 1.5 GW of RE power sales capacity | FY27 |
| CTU-connected component | ~0.5 GW is a CTU-connected wind project in Karnataka | Commissioning estimated December 2026 |
| Non-CTU component | ~1 GW is STU-connected or onsite solar across Gujarat, Karnataka, Maharashtra, Tamil Nadu, and other states | FY27 |
| Land acquisition | 100% of land for capacity building to be in place | Latest by September 2026 |
| Osaka Gas JV target | Build about 400 MW or more in the CORE joint venture | Over three years |
| EBITDA margin trajectory | RE Power Sales EBITDA margin to reach 85-86% | In 2 to 3 years from Q3 FY26 |
| Equity funding | No intention of a QIB; well funded for continued high growth | Over the next three years |
| Generation data disclosure | Provide quarterly generation data in million units | On a continued basis every quarter |
| Trailing 12-month metric | Present trailing 12 months capacity commissioned number | Every quarter |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue from operations | ₹1,355.4 cr, +29% YoY (9M FY26) |
| EBITDA | ₹944.8 cr, +33% YoY (9M FY26) |
| EBITDA (Q3 vs Q3 prior year) | ₹307 cr, +40% YoY from ₹220 cr |
| Reported PAT | ₹40.2 cr (9M FY26), from ₹2.2 cr in 9M FY25 |
| RE Power Sales EBITDA margin | 83%, up from 81% YoY (9M FY26) |
| RE Services EBITDA margin | 22%, up from 15% YoY (9M FY26) |
| Weighted average cost of borrowing | 8.7% as of Dec'25, down from 9.2% at start of fiscal and 9.5% in Mar'24 |
| Debt to adjusted EBITDA | 4.8x |
| DSCR for stabilized assets | 1.4x |
| Contracted RE power sales capacity | 5.7 GW, 3x growth from 1.75 GW as of 31 Mar'24 |
| Operational RE power sales capacity | 3 GW, +76% YoY |
| Capacity commissioned in trailing 12 months | ~1.3 GW as of 1 Mar'26, up from ~500 MW at start of fiscal |
| Capacity addition guidance for FY27 | ~1.5 GW of RE power sales capacity |
| Data and AI share of contracted capacity | 42% of 5.7 GW, ~10x growth from 31 Mar'24 |
| Weighted average PPA tenor | ~23 years |
| Tariff for 2.7 GW contracted under execution | ₹3.84 |
| Grid uptime | Above 99% |
| Projects built within Board-approved capex | 96.5% of approved capex (9M FY26) |
| Run-rate EBITDA added in first 11 months of fiscal | ~₹650 cr, 57% growth from starting run-rate of ₹1,140 cr |
| Net debt breakup (as of 31 Dec'25) | ₹4,688 cr operational >1yr, ₹1,781 cr commissioned during FY, ₹1,739 cr under-construction, ₹1,490 cr corporate loan |