Key Takeaways
- Volume growth masked by tolling exit: Dalmia-plant volumes grew 6% for FY25 vs industry 4–5%, but Q4 reported a 3% YoY decline only because the prior-year base included JP tolling volumes that have since stopped.
- Margins recovered sharply on cost control: EBITDA/ton rose to Rs. 926 in Q4, up 21% YoY, as a 4–7% drop in raw material, power and logistics costs more than offset lower prices and volumes.
- South pricing remains the swing factor: Realizations were flat QoQ because price improvements in North and East were negated by a competitive, oversupplied South; management is cautiously optimistic for a modest lift off unsustainably low levels.
- Capacity build-out is accelerating, not pausing: The company hit its 4.95 cr ton milestone, announced 0.6 cr tons of new expansion in Belgaum and Pune for FY27, and will detail its plan through FY28 next quarter.
- What to watch next quarter: Whether the April South price increase sticks, the FY28 capacity roadmap and its balance-sheet impact, and any movement on the ED provisional attachment order.
Volume & Demand
- FY25 demand arc: Cement demand grew 7–8% in Q4 after a muted 3–3.5% in the first nine months, lifted by government spending and post-festive pent-up demand. Full-year GDP growth is believed around 6.5%.
- Dalmia outperformed on a clean basis: FY25 volumes from Dalmia plants grew 6% vs industry growth of 4–5%. The reported Q4 decline of 3% YoY is entirely explained by the absence of JP tolling volumes; excluding those, Q4 volumes grew 4% YoY.
- Quality over quantity in Q4: Unlike the same quarter last year, the volume increase was not achieved at the cost of profitability: trade mix improved to 67% (from 65%) and premium product mix rose to 24% (from 21%).
- FY26 demand outlook: Management expects cement demand to grow around 7–8% in FY26 but declined to give a firm volume growth number for the company, citing a volatile environment and a deliberate focus on balancing growth with profitability.
Puneet Dalmia: "I continue to believe that India is a multi-decade story, and short-term disruptions should not deviate the focus."
Pricing & Regional Dynamics
- Flat realizations, divergent regions: QoQ realizations were flat because price increases in the North and East were offset by drops in the South, where the market remains very competitive and saw some erosion.
- South: cautiously optimistic on a floor: Prices in the South had been at unsustainably low levels, and consolidation helped drive an April increase. Management is reasonably optimistic that prices will sustain at a slightly higher level than the last 12 months, but remains cautious given oversupply and fragmentation in Andhra Pradesh.
- Consolidation as a pricing backstop: The top four players' capacity share rose from ~47.5% in FY22 to nearly 57% in FY25, with 5.2 cr tons changing hands in FY25 alone. Management expects this to eventually aid better pricing, though the benefit is not yet visible in every region.
- Northeast: growth with a caveat: The region is growing faster than the Indian average, government infrastructure spending is high, and the market is consolidated, but new capacity additions may cause temporary turbulence.
Puneet Dalmia: "Prices were at an unsustainably low level and also consolidation happened during this time. So the combination of both these factors has caused a price increase in South in April. Whether it will sustain or not, I am reasonably optimistic right now that it may be the same low level which we have experienced in the last 12 months may not remain, but it will be at a slightly higher level now."
Costs & Margin Walk
- Raw material costs down 4% YoY: Cost per ton fell to Rs. 743, driven by lower fly ash and limestone raising costs. Going forward, the Tamil Nadu state tax on minerals will add pressure.
- Power and fuel costs down 7% YoY: Cost per ton fell to Rs. 945 as fuel consumption cost dropped from \$114/ton to ~\$95/ton and renewable energy share rose from 34% to 39%. Blended fuel cost declined to Rs. 1.30/kcal. Fuel prices have started inching up in recent months and spot prices remain very volatile amid global macroeconomic uncertainty.
- Logistics costs down 2% YoY: Cost per ton fell to Rs. 1,135 as direct dispatch rose from 56% to 61% and lead distance dropped from 289 km to 277 km, partly offset by higher clinker movement to the Northeast due to an unplanned shutdown.
- Cost reduction program: Management is targeting Rs. 150–200/ton of cost reduction over two years through more renewable energy, better heat and power consumption rates, and logistics optimization. Roughly half of that, Rs. 75–100/ton, is expected in FY26, measured against a Q1 FY25 base.
- Other expenses benefited from operating leverage: The 28% QoQ volume increase and absence of shutdowns (unlike Q2 and Q3) drove the per-ton drop.
Dharmender Tuteja: "See the world economic scenario is in front of everybody. Nobody is aware of how the economy impact will be there because the tariffs today are up today, tomorrow is down. So, with these changes nobody can predict what end scenario will be there."
Capacity Expansion
- Milestone achieved: The company commissioned its Phase I expansion target of 4.95 cr tons per annum with a 0.24 cr ton grinding unit at Lanka, Assam and a 0.05 cr ton grinding unit in Bihar during Q4.
- Northeast clinker unit near completion: The clinker unit at Umrangso is expected to commission in Q2 of FY26, which will make Dalmia the largest cement producer in the fast-growing Northeast region.
- Next leg announced: A 0.3 cr ton expansion at the existing Belgaum, Karnataka plant plus a new greenfield 0.3 cr ton grinding unit in Pune, Maharashtra, both expected by end of FY27. The Pune unit will be served by rail with a ~400 km lead distance.
- Capacity philosophy: Management will only create capacity where it has a cost-competitive position and better cost structure to serve the market, not where unsold capacity already exists. Belgaum has sufficient limestone to support the expansion and more.
- FY28 roadmap coming next quarter: The company will fully detail its capacity creation plan through FY28, including the balance-sheet impact. Net debt/EBITDA will not cross 2x on the path to 7.5 cr tons.
Puneet Dalmia: "I think there is no sense in creating capacity where you already have unsold capacity. I think we are very clear about that. We will create capacity where we think we have a cost-competitive position and we have a better cost structure to serve the market and we have a more reliable service that we can provide to our customers."
Regulatory & Legal Matters
- ED provisional attachment order: In April 2025, the ED issued a Provisional Attachment Order for Rs. 793 crore stemming from a 2011 CBI case related to investments in Bharathi Cement. The company states the order does not impact running operations, the amount is minuscule relative to the balance sheet, and it expects the order to be quashed in due course. The CBI court process continues at a slow pace with no clear timeline.
- Tamil Nadu land mining tax: The tax became operative from the first week of April. The industry would prefer much lower rates, but management's base case is to assume it stays.
- JPA assets: The company has submitted an expression of interest and will take a prudent call after a thorough review.
Balance Sheet & Capital Allocation
- FY26 capex set at Rs. 3,500 crores: Spending is largely earmarked for the Belgaum and Pune expansions, the Umrangso clinker line, land for future projects, cost-efficiency investments and maintenance capex. A project-level breakup was declined.
- Depreciation and incentives: FY26 depreciation is expected around Rs. 1,300 crores, down from FY25 due to full amortization of goodwill (previously Rs. 51 crores/quarter). Total incentive accruals in FY26 are expected around Rs. 300 crores.
- Tax rate normalizing: The Q4 tax rate of 6% was a one-off due to prior-period write-backs; the effective tax rate is 24%. Cash tax will remain in the high single digits for FY26 due to brought-forward losses, then normalize.
- Dividend: The board proposed a final dividend of Rs. 5/share, taking the full-year dividend to Rs. 9/share.
- IEX investment: The company holds a short-term investment in IEX and is committed to monetizing it soon, though no exact timeframe was given.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Cost reduction | Rs. 75–100/ton reduction (vs Q1 FY25 base), part of a Rs. 150–200/ton two-year program | FY26 |
| Renewable energy capacity | Reach 595 MW operational (from 267 MW currently) | By end of FY26 |
| Umrangso clinker unit | Commission the Northeast clinker line | Q2 FY26 |
| Belgaum and Pune expansion | Commission 0.6 cr tons of new grinding capacity | By end of FY27 |
| FY28 capacity plan disclosure | Detail capacity creation roadmap and balance-sheet impact | Next quarter (Q1 FY26 call) |
| Net debt/EBITDA ceiling | Will not cross 2x on the path to 7.5 cr ton capacity | Through the expansion cycle |
| FY26 capex | Rs. 3,500 crores | FY26 |
| FY26 depreciation | ~Rs. 1,300 crores | FY26 |
| FY26 incentive accruals | ~Rs. 300 crores | FY26 |
| Cash tax rate | High single digit | FY26 |
Key Metrics
| Metric | Q4 FY25 |
|---|---|
| Revenue | ₹4,091 cr, -5% YoY and +28.6% QoQ |
| Full-year revenue | ₹13,980 cr, -4.8% YoY |
| EBITDA | ₹793 cr, +21% YoY |
| EBITDA per ton | ₹926 |
| EBITDA margin | 19.4%, +420 bps YoY |
| Full-year EBITDA | ₹2,407 cr, -9% YoY, ₹820 per ton |
| Full-year profit after tax | ₹699 cr, vs ₹853 cr in FY24 |
| Sales volume | 0.86 crore tons, -3% YoY; +4% YoY from Dalmia plants excluding JP tolling |
| Full-year sales volume | +2% YoY overall; +6% YoY from Dalmia plants |
| Premium product mix | 24%, up from 21% in Q4 FY24 |
| Trade mix | 67%, up from 65% last year |
| Raw material cost per ton | ₹743, -4% YoY |
| Power and fuel cost per ton | ₹945, -7% YoY; fuel consumption cost $95/ton vs $114/ton in Q4 FY24 |
| Blended fuel cost per kcal | ₹1.30 |
| Logistic cost per ton | ₹1,135, -2% YoY; lead distance 277 km vs 289 km in Q4 FY24 |
| Renewable energy share | 39%, up from 34% in Q4 FY24 |
| Total operational RE capacity | 267 MW; 595 MW expected by end of FY26 |
| Closing cement capacity | 4.95 crore tons |
| Net debt | ₹716 cr; net debt to EBITDA at 0.3x |
| Gross debt | ₹5,279 cr, +₹629 cr vs March'24 |
| FY26 CAPEX guidance | ₹3,500 cr, largely for Belgaum, Pune, Umrangso clinker line, and land |
| Incentive accrual (quarter) | ₹99 cr; collections ₹119 cr |
| Full-year incentive accrual | ₹336 cr; FY26 expected ~₹300 cr |
| Incentive outstanding | ₹743 cr |
| Depreciation (quarter) | ₹314 cr, -4% YoY and -14% QoQ |
| Full-year depreciation (FY26 guidance) | ~₹1,300 cr |
| Cost reduction target | ₹150–200/ton over next 2 years; ~half in FY26 |
| Dividend per share (full year) | ₹9, including ₹4 interim and ₹5 final proposed |
| ED Provisional Attachment Order | ₹793 cr, related to 2011 CBI case on Bharathi Cement investment; no impact on operations per management |