Key Takeaways
- Earnings surge on cost control, not volume: EBITDA jumped 60% YoY to ₹696 crores (₹1,013/ton) despite low-single-digit industry demand, driven by better realizations and a sharp logistics cost decline.
- GST rate cut passed through, channel impact uncertain: The 28% to 18% reduction was fully passed to consumers, but lower GST also increased system liquidity, which management says is affecting the channel's ability to finance more cement.
- Volume growth muted, H2 recovery promised: Industry demand grew at low-single digits in H1, hit by erratic rains and a September GST-change slowdown; management expects a much healthier H2 on pent-up demand and good monsoons but declined to give a number.
- Expansion milestones met, JP outcome the swing factor: Umrangso clinker line trial run began, Belgaum and Kadapa expansions are on track, but the 75-million-ton FY28 target hinges on a JP transaction outcome expected this quarter.
- What to watch next quarter: Whether H2 volumes actually exceed 15.5 lakh tons as management endeavors, the JP transaction decision, and how much of the Pet Coke cost pressure can be absorbed without margin erosion.
Profitability Drivers
- Logistics cost the standout lever: Freight cost per ton declined 3.8% YoY to ₹1,060 despite higher lead distances, aided by the ongoing cost-reduction journey and a small portion from railway busy season surcharge relief (two months this year vs one month last year).
- Power and fuel costs flat despite new tax: Only a marginal 1% YoY increase even after a mineral tax imposed by Tamil Nadu; renewable energy share reached 48% on a consumption basis, with further efficiencies expected as RE capacity scales toward the 576 MW FY26 target.
- Raw material costs contained: Just 1% YoY increase, absorbing the Tamil Nadu mineral tax impact.
- Incentive accrual revised down: FY26 incentive guidance cut from ₹300 crores to ~₹240 crores because the lower GST rate defers accrual recognition; collection catch-up expected in Q3.
- Coal cess removal tailwind: The compensation cess removal delivers ~₹20 crores benefit in H2 FY26, rising to ₹50-55 crores on a full-year basis next year.
- Cost of borrowing falling: Reduced to 6.9% as most long-term loans are linked to external benchmarks (T-bill rates) that corrected with repo rate cuts.
- Cost reduction target maintained: The 150-to-200-basis-point cost reduction over two years remains on track.
Demand & Volume
- H1 demand subdued by weather and policy: Indian cement demand grew at low-single digits in Q1 and Q2; erratic heavy rains and flash floods were the primary drag, while September saw an additional slowdown from the GST rate change triggering channel inventory destocking and postponement of non-critical purchases.
- Prices held despite monsoon: Cement prices largely held up in Q2 even with heavier rainfall, though the seasonal profitability decline from Q1 to Q2 is normal: lower volumes, some plant shutdowns, and costs coming into the picture.
- H2 recovery bet: Management expects a pickup in momentum from improved customer sentiment, pent-up demand, and consecutive good monsoons; it is endeavoring to exhibit H2 volumes in excess of 15.5 lakh tons depending on market conditions.
- Long-term demand framework intact: In an infra-led cycle, cement growth typically runs at 1.2x GDP growth, supporting a 7-8% CAGR for the decade.
- Housing tailwinds from policy: The GST reduction is expected to boost consumption and support housing demand over the medium to long term; the RBI's potential allowance of ECBs for real estate could further support cement demand from housing.
- Trade mix declined sequentially: Trade percentage at 62% was lower than the previous quarter, which is one reason realizations appear lower; management declined to give a trade mix target.
Puneet Dalmia: "In some markets, we will go for share. In some markets, we will go for margin."
Expansion & Capacity
- Umrangso clinker line progressing: Trial run commenced in September; commercial production expected Q3 FY26; additional split grinding capacity of 0.2-0.25 crore tons planned in future for Northeast and potentially East India.
- Belgaum and Kadapa on track: Both expansions progressing as per plan, set to deliver 1.2 crore tons per annum cement capacity for West and South in the next couple of years.
- Jaisalmer expansion contingent on JP: Work on land acquisition, permissions, and environmental clearance is ongoing; time available until March 2026 to break ground; management is optimistic about the JP transaction outcome by then.
- 75-million-ton FY28 target still alive: Management continues with this target but is waiting for the JP outcome expected this quarter; more color promised by March 2026; 0.2-0.25 crore tons of low-lead-time expansion possible from Northeast clinker.
- FY26 CAPEX revised lower: Now ~₹3,000 crores, down from earlier estimates due to favorable credit terms with equipment suppliers and some postponements of non-budget CAPEX to next year.
- Net debt guardrail: With all expansions, net debt to EBITDA will not cross 2:1.
Balance Sheet & Capital Allocation
- Net debt increase explained: Largely attributable to a reduction in the value of IEX shares held as part of the treasury portfolio.
- IEX stake more than half sold: The rest will be liquidated as and when money is needed; an overhang exists from a SEBI insider trading investigation, and management is waiting to see how it plays out.
- Receivables normal: No spike in receivable days; levels remain as earlier.
- Interim dividend declared: ₹4 per share.
Puneet Dalmia: "There is an overhang because of this regulation. But it seems like there is probably some investigation happening by the government. So, we need to just figure out how this plays out."
Management & Strategy
- Variable compensation introduced: For senior and middle management from FY26 onwards, with three metrics: company performance, individual performance, and safety; variable pay ranges from ~15% to 25% of total pay.
- Chief Strategy Officer hired: Anirudh Tara from Boston Consulting Group, with 15 years of experience in building materials and leading growth and transformation; the role is shared between the CFO and the new CSO.
- No clinker sales: The company sells cement only.
- Fuel mix flexibility: Management uses the cheapest fuel mix depending on suitability of pricing between coal and Pet Coke.
- Premium product percentage flat: No change from last quarter to this quarter on a year-on-year basis.
Puneet Dalmia: "These metrics will basically align management compensation to shareholder outcomes."
Cost Headwinds & Risks
- Pet Coke the only flagged headwind: Management identified Pet Coke as a potential cost pressure for the next two quarters but declined to quantify the impact; it will try to minimize any cost spiking and ensure the P&L impact is minimum.
- Realization decline unexplained: An analyst noted Dalmia's realization dropped 4.3%, higher than industry price behavior; management declined to comment on quarter-to-quarter movements, citing regional and segment mix variables, and said it is directionally heading the right direction.
- Volume growth guidance withheld: Management declined to give any volume growth number, saying only that H2 will be better than H1; it also declined to give an industry volume growth number for this year despite H1 already being complete.
- GST liquidity effect on channel: Because GST rates have come down, there is more liquidity in the system, which management says is impacting the channel's ability to take more cement or finance more.
Puneet Dalmia: "I think we cannot forecast prices. And I think, as I said earlier also, we are in the business of making long-term investments and making sure that we create structural advantages on cost, deepen our cost leadership and build a pan-India footprint and build scale in our business."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| H2 volume | Endeavor to exhibit volumes in excess of 15.5 lakh tons, depending on market conditions | H2 FY26 |
| Umrangso clinker commercial production | Commercial production to begin | Q3 FY26 |
| RE capacity | Scale operational RE capacity to 576 MW | By end FY26 |
| FY26 CAPEX | ~₹3,000 crores | FY26 |
| FY26 incentive accrual | ~₹240 crores (revised from ₹300 crores) | FY26 |
| Cost reduction | 150-200 bps over two years | Over next two years |
| Jaisalmer expansion decision | Will be announced; depends on JP transaction timing | By March 2026 |
| 75-million-ton target clarity | More color on path to target, contingent on JP outcome | By March 2026 |
| Net debt guardrail | Net debt to EBITDA will not cross 2:1 with all expansions | Through expansion cycle |
| Coal cess benefit | ~₹20 crores in H2 FY26; ~₹50-55 crores full-year next year | H2 FY26 / FY27 |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹3,417 cr, +10.7% YoY |
| EBITDA | ₹696 cr, +55%+ YoY on absolute and per ton basis |
| EBITDA per ton | ₹1,013, second consecutive quarter of four-digit cement EBITDA per ton |
| EBITDA margin | 20.4%, vs 14.1% in Q2 FY25 |
| Realization increase | ~7.6% YoY |
| Volume growth | ~2.9% YoY |
| Raw material cost per ton | ₹799, +1% YoY |
| Power and fuel cost per ton | ₹1,017, +1% YoY |
| Logistic costs per ton | ₹1,060, -3.8% YoY |
| Blended fuel cost | ₹1.38 per Kcal |
| Blended Pet Coke and coal consumption cost | ~$100 per ton, QoQ |
| RE share | 48% on consumption basis |
| Trade share | 62%, lower than previous quarter |
| Premium product share | 22% |
| Lead distance | 287 km |
| DD% | 60% |
| CC ratio | 1.62x |
| Incentive accrual (Q2) | ₹64 cr accrued, ₹50 cr received |
| FY26 incentive accrual guidance | ~₹240 cr, revised from ~₹300 cr due to GST rate cut deferral |
| Coal compensation cess removal benefit | ~₹20 cr in H2 FY26 |
| Gross debt | ₹6,621 cr |
| Net debt | ₹1,602 cr |
| Net debt-to-EBITDA | 0.56x |
| Cost of borrowing | 6.9% |
| CAPEX (H1 FY26) | ₹1,189 cr |
| FY26 CAPEX estimate | ~₹3,000 cr, lower than earlier estimate due to favorable credit terms and postponements |
| FY27 CAPEX estimate | ~₹4,000 cr |
| Interim dividend | ₹4 per share |
| RE capacity commissioned in Q2 | 93 MW through group captive mode |
| Target operational RE capacity by end FY26 | 576 MW |
| Umrangso clinker line capacity | 0.36 cr tons per annum, trial run commenced September, commercial production expected Q3 FY26 |
| Belgaum and Kadapa expansion capacity | 1.2 cr tons per annum for West and South markets |
| Pet Coke prices (current) | ~116 |
| Cost reduction target | 150–200 per ton over next two years, on track |
| FY27 incentive accrual expectation | ~₹200 cr |
| Coal cess benefit (full year FY27) | ~₹50–55 cr |