Key Takeaways
- Record order book, radar-led: The order book hit an all-time high of over ₹880 crores, driven by a ₹362 crore DRDO order for two space-surveillance radars, the largest ever designed and produced in India.
- H1 revenue grew 1.6x YoY, with profit up 1.5x, while gross margins held at the guided 65%. The quarter’s intake of ₹471 crores was well ahead of expectations, dominated by development contracts that management expects to convert into much larger production orders.
- Working capital stretched deliberately: Inventory days rose to 367 as the company bought ahead to insulate against semiconductor shortages, a choice management calls planned and expects to normalize to 280–300 days medium-term.
- The pipeline math is tantalizing but untimed: Management points to a single-vendor pipeline of at least ₹2,000 crores and a potential radar follow-on worth a few thousand crores, yet concedes it has no control over when, or if, those orders land.
- What to watch next quarter: Whether the ₹150 crores in advances from the large radar orders actually arrive in 1–2.5 months, progress on the indigenous missile and BrahMos seeker trials, and any conversion of the C-295 or satellite pipeline into firm contracts.
The Radar Order: Scale, Nature and What Comes Next
- Largest-ever win: The two space-surveillance radars represent the full system, not just electronics, and are the largest radar designed, produced and installed in India. The contract is classified as development but involves ~3,000 boxes per radar, making it as good as a production contract in scale.
- Delivery timeline: The two radar development contracts are slated for delivery in the next 18–21 months.
- The production tail: Once development is finished, management expects 10 to 15 times the size to be contracted, because many radars are needed to cover Indian space. The potential follow-on contract size could reach a few thousand crores, possibly ₹5,000 crores.
- Infrastructure to match: The company has added automatic lines, vibration tables, thermosetting chambers, and created hangar space with 10-ton gantries capable of handling 10–15 vehicles or trucks for outfitting EW equipment and truck-mounted radars. Capital work in progress recorded at ₹30 crores last quarter.
- MOD learning curve: First-time direct delivery to the Ministry of Defence involves a learning curve on acceptance processes. The first radar delivered in March has completed acceptance; the second is under installation; the third has factory acceptance done and is dispatched.
S. Rangarajan: “So once this is finished, we expected that 10 to 15 times, the size of radar will be contracted on us, because we've done the original development we know what we expect.”
Development-to-Production Engine
- The model: Development contracts contributed a higher share of revenue and orders this quarter. These are important because they translate into production contracts, providing future revenue visibility. Management estimates ~90% of development work done in the last two years should mature into production contracts, though timing is unknown.
- Single-vendor advantage: The company is increasingly receiving single-vendor development contracts from DRDO due to its end-to-end competency and time constraints where splitting among vendors is impractical. Being selective in taking large portions of contracts raises the probability of repeat orders.
- Margin dynamics: If production follows a development contract where price discovery is already complete, margins are expected to be similar. Tender-based MOD production contracts are competition-driven, so margins vary. Management states development contracts do not inherently carry lower margins: the company absorbs development costs itself when competing on tenders.
- Integrated systems shift: The business is maturing from DRDO subsystem work to full systems and radars for MOD tenders, targeting system-level development contracts of a few hundred crores to a few thousand crores. This shift may shrink margin percentages but grow revenue and absolute bottom line.
S. Rangarajan: “I think largely maybe 90% all of them to mature into production contracts. When it will do I do not know, but we have done our end of the job, it all works as per specifications.”
Working Capital: The Deliberate Stretch
- Inventory buildup: Inventory days rose to 367, driven by buying materials not only for current-year execution but also for next-year execution. Some components ordered last year had still not been received by September–October, so management is taking advanced decisions on expected contracts to avoid delivery delays caused by missing components.
- Receivables pressure: Receivables have increased partly because development contracts and first production orders involve acceptance tests and field trials that stretch timelines, with customers holding back some money until trials are complete. Once contracts convert to single-vendor production contracts, acceptance processes become clearer and collection is faster.
- Advances incoming: Bank guarantees for the ₹470-odd crores in orders received last quarter have been made and given to customers. Advances of a couple of ₹150 crores are expected in the next 1–2.5 months.
- Normalization path: Management expects working capital metrics to come down over the next two years as electronic parts shortages ease and development contracts convert to production contracts. The medium-to-long-term target is 280–300 days, with a short-to-medium-term target of 270–280 days.
S. Rangarajan: “So what happens is that puts us in a very great difficulty, because there are some components in stock. But one component is not there, so I can't design the equipment. So to avoid these things, now what happens, we're taking advanced decision on expected contracts also, because we need to keep the delivery mechanism on.”
Platform Programs and the Pipeline
- BrahMos: The company is a long-term partner and single vendor for launcher fire control systems and missile test systems. Growth is expected to track BrahMos growth. A smaller missile is being planned for induction on other platforms, and the company expects to be the automatic choice. The RF seeker captive trial on Su-30 is awaited anxiously; if successful, a missile trial with one launch follows. Two vendors are selected, but Data Patterns designs everything in-house while the competitor bought integrated subsystems.
- C-295: Enquiries for follow-on jammer have been issued by headquarters. The company’s interest is in building equipment for modified C-295 platforms, with designs already largely completed, reusing EW systems already designed. There is no play in the original-specification C-295 being built by Tata.
- Other programs: Negotiated orders worth ₹70-odd crores for LCA Mk 1A cockpit displays and ₹30-odd crores for a weapon loader are expected soon as budgets have been released. Himshakti and Arudhra radar repeat orders are awaited on BEL, with back-to-back business expected likely in FY2024.
- Prototypes in trial: NUH radar prototype delivered last year; SDR for fighter aircraft first sets delivered with additional ground system orders under testing; COMINT systems delivered and in acceptance trials; RWR flying in LCA trials successfully with more trials and versions on order.
- Satellite business: Capability built over 7–8 years to build entire satellites including ground stations with no imports. Nano satellites launched and working for 3–4 years, but latent demand has not yet translated into actual contracts. Management is waiting to see how the Government of India will contract outside ISRO.
S. Rangarajan: “But yes, BrahMos, we are long-term partners to BrahMos. So we expect the BrahMos growth. We also grow with that growth.”
Margins: The Mix-Driven Trajectory
- H1 gross margin: Maintained at 65%, in line with full-year guidance. Component prices have gone up, not cooled, due to COVID-related short supply and intermediary traders. Gross margin is not uniform across projects and depends on budget and contract specifics.
- EBITDA margin outlook: Currently around 40%. Management expects this may come down to 35%–37% depending on contract mix, scaling, and bought-out content. If integrated systems become a larger share, margins will probably shrink but revenue and bottom line will rise.
- Competitive cost advantage: The company believes it can compete with larger players because ground-up design and in-house building blocks give a cost advantage. Design IP margin is retained even when competing on integrated system tenders.
- Development vs production margin: The higher developmental revenue in H1 coincided with ~60% H1 growth. Gross margin shrank more than EBITDA margin, but management states development contracts do not inherently carry lower margins.
Venkata Subramanian: “EBITDA margins should be around 40% now, maybe I'll come to 35%, 37% depending on the contract mix of contracts which we do and how we want to scale.”
Exports and Competitive Positioning
- UK export milestone: Major export turnover from the UK for airborne avionics designed for them, displacing ~100 systems over five years. Additional development orders received from an existing client for an airborne system.
- India-first outlook: The Indian defense opportunity is expected to outpace exports by leaps and bounds. Exports are currently mostly build-to-print or offset-driven, though some development exports are happening. The company has quoted for a radar order to a NATO country in Europe.
- Facility expansion: A new manufacturing facility is partly operational, with the first Precision Approach Radar installed and accepted by the Navy. The new facility is dedicated to production, while the existing facility will be converted to development infrastructure and R&D testing. Full production relocation is expected over the next six months.
- Hiring: 120–140 engineers recruited to scale delivery and execute development contracts ahead of time. Hiring is continuous and need-based, with a spike in July–August driven by college graduation cycles. Capacity building is ongoing at all levels.
Management: “The size of business, what we are expecting in the Indian market is going to outpace the export by leaps and bounds.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Gross margin | Maintain around 65% for the full year | FY23 full year |
| Topline growth | 25–30% | Medium-term target |
| ROE and ROCE | More than 20% | Medium-term target |
| Working capital days | Normalize to 280–300 days | Medium-to-long-term |
| Working capital days | Come down to 270–280 days | Short-to-medium-term (next two years) |
| Advances from large orders | ~₹150 crores expected | Next 1–2.5 months |
| Radar development delivery | Two space-surveillance radars delivered | Next 18–21 months |
| LCA Mk 1A cockpit display order | ₹70-odd crores expected | This month (from call date) |
| Weapon loader order | ₹30-odd crores expected | Soon, budgets released |
| Himshakti/Arudhra repeat orders | Back-to-back from BEL | Likely FY2024 |
| Production facility relocation | Full move to new facility | Next six months |
| EBITDA margin trajectory | 40% now, may come to 35%–37% | Depends on contract mix and scaling |
| Order pipeline | Participate in over ₹2,000–3,000 crores worth of contracts | Next 3–4 years |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue | ₹88 cr, 1.5x YoY |
| H1 Revenue | ₹156 cr, 1.6x YoY |
| Gross margin | 65%, maintained in Q2 and H1; full-year guidance around 65% |
| EBITDA margin | 33% in Q1, in line with guidance |
| PAT | ₹21 cr, 64% YoY growth |
| H1 PAT | ₹35 cr, 52% YoY growth |
| H1 EPS | ₹6.80 |
| Order book | over ₹880 cr, highest ever, as of call date |
| Q2 order intake | ₹471 cr, much ahead of expectations |
| H1 order intake, two radar orders from DRDO | ₹362 cr, development orders |
| H1 order intake, EW development and production orders | ₹30 cr |
| H1 order intake, Avionics Naval systems export and production orders from DPSU | ₹22 cr |
| H1 order intake, EW and Communication orders from DRDO | ₹40 cr |
| Negotiated orders awaiting LOI | ₹128 cr, including ~₹73–74 cr for LCA Mk 1A cockpit display and ~₹30 cr for automatic weapon loading system |
| Cash in book | ₹68 cr at end of H1 |
| Working capital days | 367 days; medium-to-long-term target 280–300 days |
| Advances as of 30 September | ₹39 cr, reflected under other non-current and current liabilities |
| Advances expected in next 1–2.5 months | ₹150 cr (a couple of ₹150 cr kind of advances) |
| Single-vendor order pipeline | minimum ₹2,000 cr |
| Revenue growth target | 25% to 30% topline growth |
| ROE and ROCE target | more than 20% |
| Infrastructure investments to double capacity | ₹100-odd cr |
| Capital work in progress | ₹30 cr last quarter |
| Total employees | ~1,000, including 520-odd engineers |
| Engineers recruited | more than 120–140 |