Deccan Gold Mines Ltd Guidance Report - SOIC x StockScans Report

as of Nov 2026

  1. Plan for 3 operating mines - 2 gold and 1 lithium - in 2025 Missed - The 25th September 2024 announcement set out plans for 3 operating mines - 2 gold and 1 lithium - in 2025. Jonnagiri's plant was operational by July-August 2025, Altyn Tor's first doré came only in August 2026, and Mozambique lithium drilling had not started; no lithium mine operated in 2025.
  2. Target of 1 tonne of gold production by 2026 Missed - The 20th March 2023 announcement targeted 1 tonne of gold production by 2026, comprising \~49% of Jonnagiri, Tanzania (if construction completed by 2024) and Altyn Tor, excluding Ganajur, Hutti and the litigated mine. Jonnagiri produced 224 kg in H1 FY27, Altyn Tor's first doré came in August 2026, and 3 of 5 Tanzania tenements were relinquished; no 1 tonne was achieved by 2026.
  3. Rights issue Net Proceeds - up to Rs 203 cr for full repayment of ICDs Delivered - The 13th February 2026 announcement earmarked up to Rs 203.00 crores of rights issue Net Proceeds for full repayment of Inter Corporate Deposits from Godawari Power and Ispat, Ardent Steel and Hira Ferro Alloys. The rights issue raised Rs.314.70 cr and funds repaid all outstanding Hira Group dues with accrued interest, with debt cleared by end of March 2026.
  4. FY24 Annual Report "Looking Forward" for 2025 - Jonnagiri and Altyn Tor into production, Mozambique trading routes, Bhalukona exploration, Finland trial pit plans Partial - The FY24 annual report's "Looking Forward" for 2025 promised Jonnagiri and Altyn Tor into production, Mozambique lithium/tantalum trading routes, Bhalukona exploration and finalised Finland trial pit plans. Jonnagiri's plant was operational by July-August 2025 and Bhalukona drilling completed, but Altyn Tor's first doré came in August 2026, Mozambique drilling had not started, and no Finland trial pit plans were finalized.
  5. Jonnagiri Gold Project and Altyn Tor "will begin production later this year" (2025) Partial - The FY25 annual report stated Jonnagiri Gold Project and Altyn Tor "will begin production later this year" (2025). Jonnagiri's plant was operational by July-August 2025 with small quantities of gold from August as trial production, but Altyn Tor produced no gold in 2025, with first doré on 5 August 2026.
  6. Full erection of leaching tanks at Altyn Tor - mid- to late-October 2025 Missed - The 25th August 2025 announcement expected full erection of the leaching tanks at Altyn Tor by mid- to late-October 2025. The Q4 FY26 call instead guided the full-scale leaching circuit and tailings dam ready by end of July 2026, and the Q2 FY27 PPT still lists commissioning the leach circuit and tailings facility as next phase.
  7. Commercial production from gravity circuit at Altyn Tor - mid- to late-October 2025 Missed - The FY25 annual report and the 25th August 2025 announcement aimed for commercial production from the Altyn Tor gravity circuit in mid- to late-October 2025. The gravity circuit was instead commissioned in Q4 FY26, roughly 3-4 months after the target, with no October 2025 commercial production disclosed.
  8. Mozambique drilling to begin "in a few months" Missed - The 5th February 2025 announcement said Mozambique drilling would begin "in a few months", quickly converting known pegmatites into Mineral Resources. Drilling was slated for January at the Q2 FY26 call, had not started by the Q4 FY26 call, and as of the Q2 FY27 call 1,500-2,000 meters were only planned for this season, delayed by BSE approval.
  9. FY25 Annual Report "Looking Forward" for 2026 - Altyn Tor into production, Finland trial mining, Bhalukona drilling, Mozambique copper exploration Partial - The FY25 annual report's "Looking Forward" for 2026 promised Altyn Tor into production, Finland trial mining, Bhalukona Ni-Cr-PGE drilling, Mozambique copper exploration and continued Tanzania work. Altyn Tor entered production in September 2026 and Bhalukona drilling completed 2,500 m in 15 holes, but Mozambique work stayed at surface with 4-5 pegmatite zones and no drilling, no Finland trial mining is disclosed, and 3 of 5 Tanzania tenements were relinquished.
  10. Jonnagiri pilot plant capacity enhanced from 20 TPD to 40 TPD Delivered - The 23rd July 2023 announcement planned enhancing the Jonnagiri pilot plant from 20 TPD to 40 TPD, potentially producing 1 kg of gold per month until the full-scale plant was commissioned. By the Q2 FY26 call trial runs were complete and the full-scale plant was running at its approved capacity of about 1,000 tons per day, making the pilot plant no longer relevant.
  11. Altyn Tor - on track to commence production later this year (2025) Missed - The 30th September 2025 announcement said Altyn Tor was "on track to commence production later this year", with doré bar production expected by October 2025. Construction was delayed by snow until the first week of March 2026 and the gravity circuit was commissioned in Q4 FY26; the first doré was produced on 5 August 2026, with no 2025 production disclosed.
  12. Altyn Tor - concentrate production to begin June 2026, Merrill-Crowe commissioned June 2026 Partial - The Q4 FY26 PPT and the 10th May 2026 announcement guided concentrate production from June 2026 and Merrill-Crowe circuit commissioning in June, enabling doré bar production from gravity concentrate. The first gold doré was instead produced on 5 August 2026 via gravity concentrate through the Intensive Leach System, with Merrill-Crowe recovery and smelting demonstrated, about one month late.
  13. Altyn Tor - 30,000 tonnes of material containing 30-35 kilos of gold by end of December 2026 Pending - At the Q2 FY27 call, management guided 30,000 tonnes of semi-processed/processed material containing about 30-35 kilos of gold as part of commissioning, with results to be shown by end of December. Processing of this material has begun, with the plant in full commissioning; the Q2 FY27 PPT reports a first 1.2 kg doré consignment dispatched for refining and settlement validation.
  14. Jonnagiri EBITDA margin stabilization to 65-70% Delivered - At the Q1 FY27 call, management guided Jonnagiri EBITDA margin stabilization to about 65-70% within another quarter or two, later trimming the 70% to 65-67% with gold at \~3,500. From \~30% EBITDA margin in Q1 FY27, the Q2 FY27 PPT shows an Associate EBITDA margin of \~70% for H1 FY27, with the project running at 50% PAT / 70% EBITDA.
  15. Kyrgyzstan PAT margin improving from \~30% in FY2027 to 40-45% going forward Pending - At the Q4 FY26 call, management guided Kyrgyzstan PAT margin improving from \~30% in FY2027 to 40-45% at peak stage, later revised at the Q2 FY27 call to 30-35%, maximum 40%, with exact numbers to wait one more quarter. No Kyrgyzstan PAT margin is disclosed yet; Altyn Tor was inaugurated in September 2026 and the first doré dispatched in November 2026.
  16. Geomysore expansion self-funded, no further dilution of Deccan's 26% Delivered - At the Q4 FY26 call, management guided that the Geomysore expansion would be self-funded from internal accruals with no immediate further dilution of Deccan's 26%. Deccan holds 26% of Geomysore, the Q2 FY27 call confirmed no further equity infusion planned in Jonnagiri, with profits and debt to fund it, and no dilution is disclosed.
  17. FPO/capital raise around Dhanteras 2026 Missed - At the Q4 FY26 call, management said an FPO/capital raise could be timed around Dhanteras this year, with merchant bankers engaged and paperwork mostly standardized. A larger QIP was still planned at the Q1 FY27 call, but the only raise disclosed is about Rs 137 crores via board meeting in August and AGM in September; no FPO or larger raise around Dhanteras 2026 is disclosed.
  18. Kyrgyzstan investment to flow back as debt repayment with 15% interest On track - At the Q4 FY26 call, management guided that Kyrgyzstan's investment would flow back to Deccan as debt repayment with 15% interest once production starts, deferring dividends for one to one-and-a-half years. Deccan lent about Rs 276 crores to Kyrgyzstan at 15% interest, and the Avelum Partners LLP loan's repayment deadline was formally extended to March 31, 2029, repayable upon commencement of commercial production.
  19. Mozambique lithium project start production next year (2026) Missed - At the Q2 FY26 call, management said a small-scale Mozambique lithium operation was "very likely next year" (2026), with Finland the bigger project in two to three years. The target was revised to a 200 tpd plant by end of 2027, or at least Q1 2028, then to commercial operations "at least in 2028"; no production is disclosed, with drilling delayed by the BSE approval.
  20. Jonnagiri - no further stake increase beyond 26% Delivered - At the Q2 FY26 call, management said further increase in the Jonnagiri stake "seems to be very doubtful" and could not be guaranteed beyond that point, reiterating no further equity infusion at the Q2 FY27 call. The company holds 10,53,730 Geomysore shares representing 26% of paid-up equity, after acquiring 14,127 shares at Rs. 1,600 per share, with no further increase disclosed.
  21. Altyn Tor resource increase to more than 8 tons "very soon" Partial - At the Q2 FY26 call, management said the Altyn Tor resource base would rise from 5.6 tons to "more than 8 tons very soon". The Q2 FY27 PPT shows a 15% increase in in-situ resources but a total of 5,671 kg Au (5.6t) at 0.5 g/t cut-off, still below the 8-ton target, with no larger increase disclosed.
  22. Jonnagiri refinery - refined gold (bullion) production Delivered - At the Q2 FY26 call, management said a refinery would be built at Jonnagiri so refined gold (bullion) is produced rather than doré bar, with timing left to Geomysore. Jonnagiri now sells 999 refined gold bars to jewellers at the IBJA price, with doré refined in an on-site refinery costing \~Rs.4-5 Crores - 59 kg of bullion sold in Q1 FY27 and 50.4 kg in Q2 FY27.
  23. Ganajur - production of \~1 ton gold in 2-3 years if mining lease granted Pending - At the Q1 FY27 call, management guided that if the Ganajur mining lease is granted, about a ton of gold production is possible in two to three years, later detailing \~6 months of clearances plus at least 18 months of construction - if granted by March 2027, the plant could run by March 2030. The matter is pending before the Supreme Court, last heard 17 November 2026 and posted to 1 December 2026, with no lease granted.
  24. 2030 vision - mid-tier gold producer, 2 tons gold production, critical minerals production On track - At the Q2 FY26 call, management set a 2030 vision of Jonnagiri at a ton, Altyn Tor above 800 kilos, Finnish underground mining and Mozambique lithium-tantalum and copper-gold production, with Deccan's share of gold at around 2 tons; the Q4 FY26 PPT added mid-tier status, Bhalukona Ni-Cu-PGE mine and \~1tpa at each gold mine by 2030. Jonnagiri (July 2026) and Altyn Tor (September 2026) are in production, Bhalukona drilling is complete with a mining lease application targeted 2027/28, but Mozambique drilling has not started, Finland drilling is delayed and no critical minerals production is recorded.
  25. Bhalukona - production by 2029 On track - At the Q4 FY26 call, management indicated Bhalukona could produce "somewhere around '29" after \~18 months of plant construction post-April 2027 design, with a \~Rs.400 Crores processing plant, timelines flagged as needing refinement; the Q2 FY27 call confirmed 2029 as a likely scenario, 2-3 years away. About 2,500 m of diamond drilling in 15 holes is complete, suggesting over 4 Mt of potentially economic ore, with the mining lease application targeted for 2027/28 and no plant construction yet.
  26. Altyn Tor underground mine - 700-800 kg production after 4-5 years On track - At the Q4 FY26 call, management guided that once high-grade ore (>3 g/t) is accessed underground in 4-5 years, Altyn Tor production could rise to 700-800kg, with underground capital of around Rs.150 Crores, maximum Rs.200 Crores, funded from internal accruals, and ramp-up to 300 kilos next year and 600+ kilos thereafter. The Q2 FY27 call projects 700-750 kilos at 2.5-3 g/t underground grade, with 2027 drilling planned to test deeper deposit parts and no underground development yet.
  27. Jonnagiri expansion to 2,500 tpd - up to 2 tons per annum by FY29/30 On track - At the Q1 FY27 call, management guided Jonnagiri expansion to 2,500 tons per day processing, taking the project to up to 2 tons of gold per annum "somewhere around 29 or 30", with approvals being acquired; the Q2 FY27 PPT targets approvals towards 1000 kg p.a. and a long-term ambition of >2 tonne p.a. by 2029. Production could reach almost a tonne per annum with new approvals, but no 2,500 tpd approval is disclosed; the Q1 FY27 PPT showed a +700 kg p.a. approval plan.
  28. Jonnagiri resource increase to 40+ tonnes Au On track - At the Q2 FY26 call, management said Jonnagiri resources would go from 12 tons to \~20 tons and to 42 tons in another couple of years, with the Q4 FY26 call guiding at least half a million ounces added "very, very soon" and 10 drill rigs targeting \~32 tons "in the next year or so"; the Q1 FY27 and Q2 FY27 PPTs target +40 t Au. No updated resource figure is disclosed; drilling is ongoing, to be announced once independently signed, with 40 tonnes confirmed as the final target.
  29. Larger fund raise of \~Rs.800-1000 cr (\~$100 million) after key milestones Pending - At the Q4 FY26 call, management guided a larger fund raise of \~Rs.800 Crores to Rs.1000 Crores (\~$100 million) after Kyrgyz commissioning, Bhalukona drill results and Spain tungsten drill results, likely equity (FPO) plus debt, reiterated as a QIP at the Q1 FY27 call. All three triggers have occurred - Kyrgyz commissioning in September 2026, Bhalukona and Spain tungsten drill results disclosed - but no larger fund raise is disclosed.
  30. Near-term fund raise of minimum Rs.60 cr (up to Rs.100 cr) to complete Kyrgyz project Delivered - At the Q4 FY26 call, management guided a near-term raise of minimum Rs.60 Crores (up to Rs.100 Crores) to complete the Kyrgyz project, in final stages of closing, with an EGM scheduled for May 21, 2026. The raise was approved as Rs.137 Crores via CCDs, shares and warrants, BSE approval came after delay with funds in collection, completion expected within \~15 days, and the size was revised to ₹135.67 crore after one allottee's exclusion.
  31. Spain Logrosan tungsten - definitive agreements and mining lease application by October/November 2026 Partial - At the Q4 FY26 call, management committed to completing definitive agreements for the Logrosan tungsten project and launching the mining lease application by end of October or November 2026, alongside earning 51% by spending €1.76 million. About 5,400 m of drilling is complete with every hole intersecting potentially economic tungsten or tungsten-tin mineralisation, suggesting >2.3 Mt hosting >2,000 t WO3 and 500 t SnO2, but no definitive agreements or mining lease application are disclosed; drilling of a few more holes precedes the application.
  32. Bhalukona - mining lease application by next October (2026) Partial - At the Q4 FY26 call, management committed to launching the Bhalukona mining lease application "in the next one year or so", specifying the statutory deadline as next October, with the project ready to apply by next April. The target was revised to a mine waste application by H1 2027 and mining lease application in 2027/2028; \~2,500 m of drilling in 15 holes is complete suggesting over 4 Mt of ore at \~0.24% Ni-equivalent, with no application yet disclosed.
  33. Mozambique lithium-tantalum - 100 TPD processing plant by end of 2026 Partial - At the Q2 FY26 call, management revised the originally-2025 Mozambique lithium-tantalum 100 TPD plant to "by next year" (end of 2026), with drilling from January. The target was revised to a 200 tpd plant by end of 2027, or at least Q1 2028, then commercial operations "at least in 2028"; 1,500-2,000 m of drilling is planned this season, delayed by the BSE approval, with no plant construction disclosed.
  34. Finland Kalevala - prove \~4t resource within one year to enable feasibility Missed - At the Q2 FY26 call, management said further drilling would identify \~4 tons of gold at Kalevala/Kuikka for feasibility, to be proven "next one year", with \~276 kilos per annum production from 2029. The deadline lapsed around Sep 2026: drilling could not commence due to the BSE fundraise approval delay, the 1000-1500 m programme is only now to commence shortly, and Kuikka inventory remains \~1t with no resource increase disclosed.
  35. Finland Kalevala - increase stake to 51% during 2026/27 On track - At the Q4 FY26 call, management guided the three Kalevala projects collectively delivering about six to seven tons of ore via a central processing plant, with the Q4 FY26 PPT targeting a majority 51% holding during 2026/7 for about US$1-2M and the Q1 FY27 call targeting \~$1 million "in this coming quarter itself". Planned 1,000-1,500 m drilling could not commence due to the BSE fundraise approval delay, with the programme to commence shortly and no 51% stake disclosed.
  36. Altyn Tor - revised resource estimate by end of June 2026, revised mine design/LOM by August 2026 Partial - At the Q4 FY26 call, management committed to submitting the revised Altyn Tor resource estimate to the state reserve company by end of June 2026 and a revised mine design/life-of-mine plan by August 2026, later revised to October 2026 for both. The resource update was submitted to the State Reserve Committee and shows a 15% in-situ increase, totalling 5,671 kg Au at 0.5 g/t cut-off, but the revised mine design and LOM plan remain listed as next phase in November 2026.
  37. Altyn Tor - FY2027 production \~160 kg, FY2028 300-350 kg On track - At the Q4 FY26 call, management guided Kyrgyzstan production of \~160kg in FY2027 (conservative, starting August) and 300-350kg in FY2028, with FY2027 revenue \~Rs.300 Crores and PAT \~Rs.100 Crores, \~Rs.60 Crores attributable to Deccan, maintained at 150-160 kilos in June 2026 and revised to about 180 kilos this financial year in September 2026. Altyn Tor was inaugurated on 12 September 2026 with a first 1.2 kg doré consignment dispatched in November 2026, and no FY27 production figures are yet disclosed to assess against the 160 kg target.
  38. Jonnagiri - FY2027 revenue \~Rs.900 cr, EBITDA \~Rs.630 cr, PAT \~Rs.470 cr (Deccan share \~Rs.120 cr) On track - At the Q4 FY26 call, management guided Jonnagiri FY2027 revenue of \~Rs.900 Crores at 75% EBITDA, EBITDA of Rs.630 Crores and PAT of \~Rs.470 Crores, with \~Rs.120 Crores attributable to Deccan, later trimming the 70% EBITDA margin to 65-67% with gold at \~3,500. Q1 FY27 saw 59 kg sold with JV-level PAT of ₹25.63 cr and H1 saw 108.9 kg sold, standalone profit of ₹79.13 cr on \~₹160 cr revenue at 50% PAT, Deccan share ₹20.57 cr, with H1 EBITDA margin \~70% - below the annualized run-rate for ₹900 cr/₹470 cr but with guidance maintained.
  39. Jonnagiri - FY2027 production of 500-600 kg gold, FY2028 750-800 kg On track - At the Q2 FY26 call, management guided Jonnagiri FY2027 production around 500 kilos, rising to 750 kilos the following year and peaking around a ton; the Q4 FY26 call guided \~600kg in FY2027 and \~800kg in FY2028, maintained at 500-600 and 750-800 kilos in June 2026, with the Q2 FY27 call guiding close to 500 kilos this financial year. Q1 FY27 produced 112.7 kg doré and Q2 FY27 135 kg, for H1 cumulative production of approximately 224 kg, with first-half production plus inventory close to 250+ kilos.
  40. Altyn Tor (Kyrgyzstan) - full-scale commercial production by August 2026 Partial - At the Q2 FY26 call, management guided Kyrgyzstan trial production within "the next couple of weeks", and at the Q4 FY26 call committed to full-scale commercial production from August 2026 with inauguration on August 15 or 31. The first gold doré was produced on 5 August 2026 via the Intensive Leach System and Merrill-Crowe, the project was inaugurated on 12 September 2026 by the President of Kyrgyzstan, and the first 1.2 kg consignment was dispatched in November 2026, with the full-scale leaching circuit and tailings dam still listed as next phase.
  41. Debt-free by end of 2025 - repay all company debt via rights issue Delivered - At the Q2 FY26 call, management committed that rights issue proceeds would repay all company debt, making Deccan debt-free "by the end of this year, or whenever that is done", with \~Rs.315 cr raised and \~Rs.200 cr earmarked for repayment. The company raised Rs.315 cr in Q4 FY26 - 3,93,37,893 shares at Rs.80/share, listed December 31, 2025 - and repaid all debt of \~Rs.219 cr, largely to Hira Group and Godawari Power & Ispat, becoming debt-free by end of March 2026.