Emmvee Photovoltaic Power Ltd Q4 FY2026 Concall Summary

Source transcript PDF: https://assets.stockscans.in/docs/9a6h3anqiqd89zseu7l27qf4.pdf

Key Takeaways


Performance & Scale-Up

Suhas Manjunatha: "FY26 was a milestone year; FY27 will be the year of execution."

Technology & Capacity


Demand & Market Positioning

Suhas Manjunatha: "Exports are treated as an upside for us rather than the core part of our business in the current scenarios."
Suhas Manjunatha: "To be very candid, I mean, other than China, yes, all other regions is something that India can compete with and we can, like at Emmvee we are very much geared up with the cost competitiveness."

Margins & Pricing


Balance Sheet & Funding

Manjunatha D.V.: "Policy support alone cannot be the foundation of a sustainable company. Our goal is to compete through execution, technology, reliability, cost discipline and governance."

Guidance & Commitments

CommitmentSpecificsTimeline
Devanahalli module lineCommissioning of module lineEnd of calendar year 2026
Devanahalli cell lineCommissioning of cell lineEnd of FY27
Total installed capacity16.3 GW modules, 8.9 GW cellsBy end of FY27
Cell transition to G12RTransition from M10 to G12R cells with minimal disruptionBy end of current quarter (Q1 FY27)
Cell utilizationMaintain 80–85% utilizationOngoing
DCR mixAll capacity sold will be DCRBy beginning of next year (FY28)
IREDA loan drawdown75–80% drawnBy 31st March (FY27)
Ingot-wafer Phase 15 GW expansionFY29
Ingot-wafer Phase 24 GW expansionOne year after Phase 1
New order marginsEBITDA spread in similar profile to FY26FY27

Key Metrics

MetricQ4 FY26
Revenue from operations₹5,049 cr (FY26), +116% YoY
EBITDA₹1,734 cr (FY26), +140% YoY
EBITDA margin34% (FY26), vs 31% in FY25
PAT₹1,082 cr (FY26), +193% YoY
PAT margin21% (FY26), vs 16% in FY25
Q4 revenue₹1,700 cr, vs ~₹1,000 cr in Q1 FY26
Order book9.4 GW, vs 4.9 GW in FY25
Q4 order inflow1.27 GW
Installed module capacity10.3 GW as of Mar 31, 2026
Installed cell capacity2.94 GW as of Mar 31, 2026
Module production2,999 MW (FY26), vs 1,482 MW in FY25
Cell production1,520 MW (FY26), vs 534 MW in FY25
Cell capacity utilization79% in Q4 FY26; 69.9% for FY26
Module capacity utilization43% (FY26), with Units 5 and 6 commissioned during the year
Net debt to equitynegative 0.06x as of Mar 31, 2026
ROCE38% (FY26)
ROE51% (FY26)
DCR module pricing₹21 to ₹22 per watt
Non-DCR module pricing₹14 to ₹15 per watt
DCR mix30% to 35% of module production
Average order size, top 10 customers221 MW (FY26), vs 121 MW in FY25
IPO proceeds₹2,900 cr raised in Nov 2025, including ₹2,144 cr fresh issue
IPO proceeds used for debt prepayment~₹1,621 cr
IREDA loan sanctioned for Devanahalli₹3,306 cr, at 7.95% interest rate
Land acquisition cost for expansion~₹311 cr
Change in inventories of finished goods₹636 cr (FY26), vs ₹115–116 cr in FY25
Total cost of material consumed₹3,411 cr (FY26)
Cell order for execution over 3–4 years4.5 GW
Advance from single large customer in FY25₹320 cr, adjusted in FY26
Planned ingot-wafer capex per GW₹600 cr to ₹700 cr
Planned total module capacity by end of FY2716.3 GW
Planned total cell capacity by end of FY278.9 GW