Key Takeaways
- H1 turnover up 15% YoY, full-year target reaffirmed: Turnover reached ₹1,587 crore in H1 FY23, and management is "very sure" of hitting its standalone PAT target of ₹340 crore for the full year, with H2 expected to be stronger.
- Change orders are the swing factor: No change orders materialized in H1 FY23, versus ₹60 crore in the prior comparable period. Pending claims are under client finalization, and their realization would flow largely to profit since costs are already booked.
- Order inflow target of ~₹4,000 crore for FY23: YTD orders crossed ₹800 crore, and the pipeline includes a Guyana export win and multiple domestic refinery assignments. Management expects the order book to be strong at year-end.
- JV loss from RFCL should reverse: The Ramagundam fertilizer plant took a planned shutdown in September, causing a ₹10 crore share of loss. Production has restarted above 80% capacity, and management expects no further losses.
- What to watch next quarter: Whether change orders actually convert in H2, the pace of order inflow against the ₹4,000 crore target, and the trajectory of consultancy revenue now that the Guyana win is in hand.
Revenue & Profitability
- Consultancy revenue softness: Lower consultancy revenue in Q2 and H1 FY23 versus prior periods because no change orders were received in H1 FY23, compared with ₹60 crore in the comparable prior period, of which ₹50 crore flowed to net profit. Normal quarterly change order inflow is ₹20–30 crore.
- Turnkey revenue surge drove the top line: Construction material cost rose to ₹164 crore in Q2 FY23 from ₹47 crore in Q2 FY22, directly proportional to the increase in EPC/turnkey segment turnover. Subcontracting and material costs vary with the execution cycle of each project.
- Other income boost: Other income increased primarily due to dividend income from the investment in Numaligarh Refinery Limited and its subsidiary CIL, plus interest on ~₹1,100 crore of deposits, foreign exchange variation, and rental income from extra space.
- JV loss from RFCL: Q2 FY23 share of loss of ₹10 crore because the Ramagundam fertilizer plant was under a planned preventive maintenance shutdown for the entire month of September, resulting in no production. Production restarted in Q3 and is currently operating at over 80% capacity, expected to reach 100% soon.
- Doubtful debt provisioning contained: Provisions are made as per IndAS based on the period of outstanding debts and reviewed every quarter; the current quarter provision is around ₹2–3 crore, which is less than the last quarter.
- EBITDA margin improvement expected in H2: Management expects to improve EBITDA margins in H2 FY23 compared to H1, taking into consideration better execution and pending change orders.
Management: "I can assure you that this time there will not be a loss in the RFCL project."
Order Book & Pipeline
- Consultancy order book declined sequentially: Consultancy order book fell from ₹4,029 crore at 31 March 2022 to ₹3,779 crore because part of the order book was executed in H1, partially offset by new orders received.
- YTD order inflow crossed ₹800 crore: As of the call date, orders received crossed ₹800 crore, comprising ~₹250 crore in EPC and the balance in consultancy.
- Guyana win opens a new geography: Awarded a major export consultancy assignment in Guyana, a new territory for EIL; margins are expected to be good, in line with or better than domestic consultancy.
- FY23 order inflow target of ~₹4,000 crore: Targeting ~₹1,500–1,600 crore from consultancy and the balance from LSTK/OB/EPC; management stated it can always improve the situation as and when new jobs come.
- FY24 and FY25 order book ambition: Anticipating around ₹4,500 to ₹5,000 crore of order inflow in FY24, and targeting around ₹5,000 crore addition in the order book each year on a yearly basis thereafter.
- Refining and petrochemical pipeline: Multiple projects lined up from IOCL, BORL, BPCL, ONGC, and private clients setting up petrochemical complexes; EIL is engaged on DFRs for these. Some projects in the range of ₹4,600, ₹3,000, and ₹5,000 crore are expected toward the end of FY23 or in FY24.
- Barmer change orders: Expecting change orders in the next financial year or FY24–25; good value is envisaged but cannot be disclosed; settlement will take time as it is a very big refinery.
- Ratnagiri refinery: Still in process; teams are working on the EIS but the location has been changing; management stated "nobody can say better, by when it will be done."
Management: "This year also we are optimistic about that magic figure and we are trying hard to achieve that figure. And we are sure we will achieve that figure because we are working with the our clients for the chaged orders and we are working with our clients for the new orders also."
Segment Dynamics: PMC vs. LSTK
- PMC revenue growth lags order book growth: PMC revenues have not picked up proportionally to the order book increase, from ~₹1,500 crore in FY14 to ~₹5,000 crore now, while revenue moved from ~₹1,200 crore to ~₹1,400–1,450 crore. This is because these are long-gestation projects with a schedule of three to four years, with only 5–10% execution in the first year and maximum execution in the second and third years.
- LSTK margin compression is structural: Margins in LSTK have structurally come down from 10–12% to 2–3% because current jobs are offsite and utility projects on a cost-plus basis where the company does not take risk on plant and machinery cost increases, which are passed to the client. Margins are protected at 3–4%, with potential upside upon project completion if warranty/guarantee provisions are not utilized.
- PMC margin improvement tied to change orders: If certain change orders are finalized during H2, there will be improvement in margin and turnover compared to H1.
New & Sunrise Sectors
- Green hydrogen: Currently executing three or four assignments: a feasibility study with GAIL on injecting hydrogen into the existing gas network, a viability study for a zone with NSIDC (completed), and detailed engineering for a hydrogen transportation line for a private client like Adani. In FY23, the focus will be on initial studies and engineering services to learn technologies and engage with licensors; in the next financial year, EIL will try to see if work comes and assess how much risk it can absorb.
- Coal gasification: Awarded a pre-project activities assignment from Neyveli Lignite Corporation and a gasification assignment from Coal India. Surface coal gasification is expected to see an investment of around ₹35,000 crore over four to six years, with MoUs between Coal India and Indian Oil, GAIL, BHEL, and NLC and BHEL.
- Data centers and infrastructure: Working on various data center projects and anticipating more in the next financial year, including an international market development project in Haryana, a horticulture project, and an SBI data center project. Also awarded a study for the airport in Greater Noida last year and using it as leverage to target similar projects.
- Waste-to-ethanol: Engaging with steel companies and licensors; completed a few DFRs and hopeful of success in due course but not yet successful.
- Non-oil & gas share: Traditionally 15–20% of revenue comes from other sectors; EIL is working on sunrise sectors including hydrogen, coal gasification, waste-to-ethanol, data centers, institutional buildings, and airports.
Management: "This green hydrogen is at a very nascent stage of development in the country. So, the ecosystem has to be developed for the execution part and as we are very deeply into this particular green hydrogen right from the start, we are expecting that one of the opportunities that will be coming in this particular domain will be at the frontrunner to grab those opportunities."
Investments & Capital Allocation
- Numaligarh Refinery bonus shares: NRL's AGM declared a 1:1 bonus share issue, which will increase EIL's holding in the refinery.
- Investment opportunities under evaluation: Management is looking at a couple of opportunities, both government and other projects, but is not at a stage to disclose details.
- Shareholder returns track record: Management highlighted that EIL is already paying good dividends and has paid around 950% dividend to shareholders over the last 10 years.
Management: "First of all, I must say we are already paying good dividend to our shareholders. And in the last 10 years we have already paid around a 950% dividend to our shareholders."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Full-year turnover growth | ~15% growth in annual turnover | FY23 |
| Standalone PAT target | ₹340 crore | FY23 |
| RFCL profitability | No loss expected going forward; plant to operate at 100% capacity | From Q3 FY23 onward |
| FY23 order inflow | ~₹4,000 crore (~₹1,500–1,600 crore consultancy, balance LSTK/EPC) | FY23 |
| FY24 order inflow | ~₹4,500 to ₹5,000 crore | FY24 |
| FY24 and FY25 order book addition | ~₹5,000 crore addition each year | FY24 and FY25 |
| Topline ambition | Working towards ₹5,000 crore top line | Over the next one to two years |
| EBITDA margin | Improvement in H2 FY23 vs. H1, driven by better execution and change orders | H2 FY23 |
| Change order realization (Barmer) | Good value envisaged, settlement will take time | FY24–25 |
| Green hydrogen risk assessment | Assess how much risk EIL can absorb on green hydrogen projects | FY24 |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Turnover | ₹782 cr (consultancy ₹346 cr, turnkey ₹436 cr) |
| H1 FY23 turnover | ₹1,587 cr, +15% YoY |
| Other income | ₹65 cr, primarily dividend and interest income |
| Dividend from Numaligarh Refinery | ₹35 cr (₹32 cr NRL, ₹3 cr CIL) |
| Share of loss from JV (RFCL) | ₹10 cr loss, due to planned September shutdown |
| Full-year turnover growth target | 15% |
| Full-year PAT target | ₹340 cr standalone, optimistic to match last year's ₹343 cr |
| Cumulative order book | ₹8,431 cr |
| Consultancy order book | ₹3,779 cr, down from ₹4,029 cr at March 31, 2022 |
| FY23 new order inflow target | ₹4,000 cr (₹1,500–1,700 cr consultancy, balance LSTK/OB) |
| Orders received in FY23 (as of Nov 10) | >₹800 cr (₹250 cr EPC, balance consultancy) |
| FY24 order inflow anticipation | ₹4,500–5,500 cr |
| FY24–FY25 order book addition target | ₹5,000 cr per year |
| FY23 execution mix target | 45% consultancy, 55% turnkey |
| LSTK/EPC margin expectation | 3–4%, based on current order book |
| Change orders received in H1 FY23 | Nil, vs ₹60 cr in H1 FY22 |
| Provision for doubtful debts | ₹2–3 cr, not material |