- MAP2 MAT plant supplying Suzuki e-Vitara - MAP2 was upgraded to a MAT facility and mass production of large-diameter (18/19-inch) wheels for Suzuki's first EV, the e-Vitara, commenced in April 2025. Suzuki is expected to maintain stable production in 2026, which would unlock the 20,000-piece-per-month capacity addition that was underutilised in 2025 due to Suzuki's own production-line issues.
- 4W order volume targeted at 125% of 2025 level - Management expects 4W order volume in 2026 to exceed 125% of the 2025 level by fully utilising the production capacity expanded in 2025. On a 4W revenue base that grew 7.3% in FY26, a 25% volume step-up would materially lift plant utilisation and operating leverage.
- Machining capacity debottlenecking - Casting operations are currently halted once the planned volume aligned with machining capacity is reached, making machining the binding constraint on output. A backup machining sub-line and automated deburring systems planned for 2026 would let the company fully use its expanded casting capacity across MAC5 and MAP plants.
- Large-diameter and value-added mix shift - The rising share of 18-inch-and-above 4W wheels and the start of mass production of black clear-coated products (a first for EWIL) are adding higher value per wheel. Management explicitly ties the improvement in manufacturing profit to larger-diameter models and better 3B performance metrics.
- PFF capacity expansion fully completed - The "Preparations For Our Future" project finished in 2025, establishing a 4W production capacity of 140,000 units per month across five plants and a painting-line capacity of 170,000 wheels per month. With the heavy capex cycle now behind it, the company can focus on filling that capacity and generating cash flow before evaluating the next expansion phase.
- Borrowing headroom raised to ₹500 crore - A special resolution increases the borrowing limit under Section 180(1)(c) to an aggregate of ₹500 crore. Against existing debt of ₹210 crore, the expanded limit provides ample headroom to fund the machining-capacity investments and any future expansion without equity dilution.