Key Takeaways
- Copper crushed the quarter: A sharp fall from $11,000 to $8,200 forced price cuts and inventory liquidation, driving margins down ~4pp YoY. Management believes the worst of the margin correction is behind.
- Volumes muted, not collapsing: Electrical cables volume grew just 2%, but the number is distorted by destocking and speculation; underlying housing and capex cycles remain steady.
- The capex pipeline is about to convert: The e-beam facility is certified and ready, auto cable lines commission by December, and BSNL tenders opened this week with partners placed L1.
- FMEG is scaling toward breakeven: On track for INR300 crores this year, a ~40% jump, with breakeven at INR250-260 crores now within reach.
- What to watch next quarter: Whether the 2% September price increase sticks as copper dips again, the pace of BSNL order conversion, and if electrical cable volumes show the promised recovery.
Copper Volatility & Margin Impact
- The mechanics of the hit: Finolex entered Q2 with high-cost inventory procured when copper was elevated; the first two months were spent liquidating that stock at falling prices, compressing margins. The company also took explicit price cuts during the quarter to move inventory as copper slid from $11,000 to $8,200-$8,300.
- Destocking amplified the drag: The sharp correction put brakes on trade buying through August as channels consumed prebought stock; management finds it difficult to separate speculation-led demand from consumption-led demand in such conditions.
- Mix shift added pressure: More project-based selling with longer lengths going directly to the building segment at finer pricing, versus higher-margin standard 90-meter retail boxes.
- The hedging approach: Finolex buys on month averages and does not take long calls; it settles the difference with suppliers at month end. This leaves it exposed to intra-month swings in a way peers may or may not be.
- Recovery path is conditional: Management believes the worst of margin corrections is behind, but if copper volatility continues, getting back to 12% margins will take longer than hoped.
Viswanathan: "If the volatility continues, then getting back to 12% might take a little longer. That's about it. It will eventually go there, but it might -- the journey might be a little longer."
Segment Performance
| Segment | Trend | Commentary |
|---|---|---|
| Electrical cables | ▼ Muted volume | Volume growth at 2%; management expects signs of recovery from now onward as destocking ends. |
| Communication cables | ▼ Margin pressure | Fiber volumes up ~50% QoQ but prices have fallen over 2 years; metal-based cables saw lower realizations on falling copper. Margins at 2-2.5% due to low government procurement keeping utilization down. |
| FMEG | ▲ Strong volume | Lighting, switches, switchgears and conduits doing very well; fans and water heaters need improvement. Lighting volumes up but price erosion is strong. On track for INR300 crores revenue, ~40% jump. |
| Other products | ▲ Scaling | Values climbing; breakeven at INR250-260 crores expected in hand this year. |
- Communication cable margin recovery: Management sees 7-8% as definitely doable, having achieved it for years in the past. Recovery needs government procurement volumes to return and capex on backward integration to kick in.
- Wire market share: Steady over the last 2-3 years, with maybe 1% variation.
Capex Pipeline & Project Updates
- E-beam facility: Both machines installed, commissioned and ready for commercial use. BIS testing completed, certification expected anytime now. Once certified, can launch as an ISI-marked product.
- Auto cable lines (Roorkee): Equipment has arrived and is under commissioning; expected to complete by end of December.
- Preform plant: Equipment arrived, commissioning expected to start in the next 2 weeks. Phase 1 commissioning expected by Q4, with initial production from there.
- Fiber draw capacity expansion: Orders placed for equipment to expand from 0.4 crore to 0.6 crore; equipment should arrive around May or June, commissioning to start thereafter.
- Cabling capacity: Building is ready but management is waiting for clarity on BSNL tenders before deciding whether to increase capacity from the current 0.8 crore km. Equipment lead time is 7-8 months.
BSNL & Government Tenders
- BSNL tender opened: Bids submitted in early August were opened this week; partners have placed L1 on certain bids. Management declined to name partners or quantify the order, calling it too early.
- Timeline: Ordering from BSNL to bid winners expected towards the latter part of this quarter; supplies will commence probably around February or March.
- Contract structure: 3 years post-ordering for supply, plus 7-year maintenance. A price variation clause is included for protection; for firm-price periods, Finolex freezes prices back-to-back with suppliers.
- Additional state tenders: 7 to 8 more states' DPRs are under evaluation, likely to come out with tenders in the next 3 to 6 months, including Gujarat, Maharashtra, Karnataka and Andhra Pradesh.
- BharatNet-type projects: Main installation to be completed in 3 years; sales contracts will include price variation for protection.
FMEG: Scaling Toward Breakeven
- Revenue trajectory: On track to be very close to INR300 crores this year, an almost 40% jump from last year. Breakeven remains pegged at INR250-260 crores, a level management expects to have in hand this year.
- Category-level performance: Volumes doing very well in lighting, switches, switchgears and conduits. Fans and water heaters need improvement. Lighting faces strong price erosion even as volumes improve.
Viswanathan: "I think, like I mentioned at the beginning of the conference, we are on track to be very close to the INR300 crores mark this year, which would be almost a 40% jump from last year."
Revenue & Margin Outlook
- Revenue guidance is copper-dependent: Last year was just over INR5,000 crores. If copper remains steady, revenue can be towards INR6,000 crores. If copper keeps zigzagging, it is difficult to predict. H1 stood at INR2,600 crores, with Q3 and Q4 typically contributing 60%+ of the year.
- Margin normalization expected: Q2 margins were low but should track back to normalcy in coming quarters. The September price increase of 2% helps, but copper has been dipping again in the last week, so the company will wait and watch.
- Communication cable margin target: 7-8% is definitely doable; backward integration capex will also help increase margins once volumes return.
- Fiber price recovery: As global fiber consumption picks up, prices should return to normal levels probably over the next 6 to 8 months.
Viswanathan: "If copper remains steady, then that number can be towards the INR6,000 crores number. But if it keeps zigzagging, then it's a little difficult to predict."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Electrical cable volume recovery | Should start showing signs of recovery | From Q3 onward |
| E-beam commercial launch | BIS certification expected, production available | Certification anytime now; production by end Q4 |
| Auto cable lines commissioning | Equipment under testing | By end of December |
| Preform plant Phase 1 | Commissioning to start in next 2 weeks | Initial production by Q4 |
| Fiber draw capacity expansion | Equipment arrival, then commissioning | Equipment by May/June; commissioning thereafter |
| FMEG revenue | Very close to INR300 crores (~40% jump) | This fiscal year |
| FMEG breakeven | At INR250-260 crores | This fiscal year |
| BSNL supplies commencement | Post-ordering supply start | Probably February or March |
| Communication cable margin recovery | Back to 7-8% | No date; conditional on government procurement and volumes |
| Overall margin recovery to 12% | Will eventually go there | Journey may be longer if copper volatility continues |
| FY26 capex | Possible INR100-200 crores | FY26 |
Key Metrics
| Metric | Q2 FY25 |
|---|---|
| Revenue | ₹1,312 cr, +10% YoY and +7% QoQ |
| Operating margin | Down ~4 ppt YoY and ~1.5 ppt QoQ; impacted by copper volatility and price cuts |
| Electrical wires volume growth | ~2% YoY |
| Communication cables fiber volume growth | ~50% QoQ |
| FMEG revenue (H1 FY25) | ₹128 cr, vs ₹100 cr in H1 FY24 |
| FMEG full-year revenue target | ~₹300 cr, ~40% YoY jump; breakeven at ₹250–260 cr |
| Price corrections in wires | ~11% total across 3 cuts during Q2; one ~2% increase on last day of September |
| Inventory value | ₹604 cr at Sep-end, vs ₹570 cr at Mar-end |
| Inventory days | 52 days, back to March levels |
| Wires market share | ~18% (slightly under 20%), on annualized basis |
| Standard wire capacity utilization | Slightly over 65% |
| Auto cable capacity utilization | ~80% |
| Overall wire asset utilization | 65–70% |
| Communication cables segment EBIT margin | 2–2.5% in recent years; historical average ~7–8% |
| Total capex program | ~₹500 cr; ₹160 cr spent last fiscal, bulk of balance in current fiscal |
| FY26 capex estimate | ₹100–200 cr possible (per an analyst's math) |
| DSO | 14–15 days |