Key Takeaways
- Soft quarter, mix-driven margin slip: Electrical cable margins dipped to 12% from ~14% as low-margin auto and agri cables grew faster than construction wire, while communication cable revenue fell sharply on delayed government and private orders.
- Volume growth normalizing to mid-teens: After a 30% catch-up spike in Q1, volume growth decelerated to 8% in Q3; management sees mid-teens as the sustainable long-term rate.
- Capex pipeline advancing, no revenue guidance: E-beam equipment is arriving, the preform plant nears completion, and auto cable expansion is ordered, but management declined to quantify the incremental revenue these projects will generate.
- BharatNet tender is the near-term catalyst: A draft tender exists and management expects it "anytime now"; if timelines hold, revenue could begin flowing from Q2 next financial year.
- What to watch next quarter: Whether the BharatNet tender actually drops and at what scale, whether electrical cable margins recover toward 13.5–14%, and whether construction-wire softness proves to be a one-quarter dip or the start of a trend.
Electrical Cables: Margin Mix Shift, Not Structural Damage
- Margin slipped on product mix: The drop from ~14% to 12% was driven by a higher proportion of auto cables (B2B, inherently lower margin), stronger agricultural application sales, and more project-level construction wire sold at higher volume discounts to builders. Management called it mix-driven, not structural.
- Construction wire softened slightly: The housing and real-estate segment dipped in the quarter but remained "more than positive"; management cautioned against reading one quarter as a sign, noting real estate activity continues fairly well.
- Auto and agri grew faster: Both segments expanded considerably and outpaced other verticals, which pulled the blended margin down even as absolute volumes rose.
- Retail vs project pricing gap: Retail buyers pay near-MRP with small discounts; project buyers purchasing thousands of boxes receive materially higher discounts, compressing margins on that portion of the mix.
- Recovery expected soon: Management stated margins "should get back to normal levels of 13.5%–14% sooner than later."
Viswanathan: "There have been occasions when well, then price has played a part. But like I said, this is not something that is going to be sustainable in the long run. So how much do you drop price, you have to recover your cost at some point in time and gaining top line for the sake of gaining top line is not going to add enough."
Communication Cables: A Quarter of Absent Buyers
- Revenue hit by two simultaneous gaps: BharatNet tender was delayed, removing the government order book, while private telecom players did very little procurement as they concluded a spectrum auction round only last week and contracts remain unclosed.
- Volume dropped ~20%: The only government business was one small tender of 10,000–15,000 km; Reliance bought only small-fiber-count cables for 5G rollouts; Bharti's yearly contract, originally due in October, remains unfinalized after four rounds of reverse auctions. Deployment is mostly O&M maintenance with few large-scale rollouts.
- Turnaround contingent on tenders: Management expects a recovery in coming quarters, but the timing depends on BharatNet and private contract closures.
- Fiber demand thesis intact: India can consume upwards of 5 crore km of fiber annually (China consumes ~40 crore km), and demand should increase once BharatNet tenders are floated and 5G use cases roll out.
Viswanathan: "And we do believe that our country has a potential to consume upwards of 5 crore kilometers of fiber every year. China today consumes approximately 40 crore kilometers of the year."
Volume Growth: Normalizing to a Sustainable Runway
- Deceleration was expected: Volume growth moved from 30% in Q1 to 10% in Q2 to 8% in Q3; the Q1 spike was catch-up from earlier loads, and management had flagged that 20s and 30s were not sustainable.
- Mid-teens is the long-term baseline: Management explicitly guided that mid-teens volume growth is sustainable, provided no drastic changes in economic or political scenarios.
- Industry-level view for FY25: Management expects the wire industry to grow ~15% and plans for similar numbers.
- Capacity can absorb another 15%: Existing wire and cable capacity can service an additional 15% volume increase without major issues, with only minor balancing needs.
Viswanathan: "I think a 2-digit number should be sustainable, but not in their 20s and 30s. I think the mid-teens is what would be sustainable in the long run."
Capex Projects: Progress Without Numbers
- E-beam facility nearing commissioning: The building and bunkers are ready; the first equipment set left Korea and is expected around 16–17th of the month, with commissioning starting end of February or early March and production in Q1 next financial year. A second equipment delivery is expected May 2024, with installation and commissioning roughly two months thereafter.
- E-beam compounding plant: Being set up and should be ready by end of this year; until then, compound will be sourced from third parties.
- Preform plant Phase 1: Building construction to finish in the next 1–1.5 months; preform production expected earliest end of Q2 next financial, latest beginning of Q3.
- Fiber draw expansion: Expected ready by FY25–26.
- Auto cable expansion at Roorkee: Order placed, equipment expected July/August this year.
- Goa compounding plant: Permissions paperwork underway, expected to close before end of this fiscal; construction and equipment ordering to follow.
- Cabling equipment orders on hold: Building is ready, but orders will be placed only after the BharatNet tender is rolled out and volume is secured.
- Management declined to quantify: When asked for additional top line expected from these projects and a timeline, management referred to previous calls and provided no numbers.
FMEG: Volume Improving, Price Eroding
- Volumes rising across categories: Light volumes, switches, and switchgear volumes are all improving.
- Price erosion offsetting volume gains: Fairly large price erosion occurred in all three FMEG segments, muting the revenue impact of higher volumes.
- Competition is intensifying: Wire manufacturers are entering appliances while appliance manufacturers are entering wires, creating a two-way competitive squeeze.
Optical Fiber Business: Waiting on the Cycle
- Backward-integration margin target: When the fully integrated plant operates at 70–75% capacity from preform to finished fiber, margins should reach double digits.
- Pricing is cyclically depressed: Current low prices stem from China's economic slowdown and reduced investment; management does not expect this to persist for years.
- Import dynamics: Optical fiber cables are not imported from China, but fiber is; management provided effective landing prices but did not quantify the price gap versus domestic production.
Viswanathan: "Today's price situation is more to do with... the economic cycle slowing down a little bit in China and investments coming down a little bit in China. But I don't think that is something that we will expect to continue for years together in the future."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Electrical cable margin recovery | Return to 13.5%–14% | "Sooner than later" |
| Volume growth | Mid-teens sustainable | Long run, barring drastic economic/political changes |
| E-beam production start | First equipment commissioning begins late Feb/early Mar | Production in Q1 next financial year |
| Preform production start | Phase 1 output begins | Earliest end-Q2 next financial, latest early Q3 |
| Auto cable expansion | Equipment arrives, needs satisfied | July/August this year |
| BharatNet revenue flow | Revenue could start flowing | Q2 next financial year, if timelines hold |
| Fiber draw capacity expansion | Ready | FY25–26 |
Key Metrics
| Metric | Q3 FY24 |
|---|---|
| Revenue | ₹1,222 cr, up 3% QoQ and 6% YoY |
| 9-month revenue | ₹3,613 cr, up 11% YoY |
| Electrical cable segment margin | 12%, down from ~14% average in prior 2–3 quarters; product mix impact |
| Blended cable and wire margin | ~12% |
| Communication cable revenue | Down 11% YoY |
| Communication cable volume | Down ~20% YoY |
| Volume growth (electrical cables) | 8% in Q3; mid-teens seen as sustainable long-term |
| Capacity utilization | ~65–66% |
| Revenue by region: South | ~45% of revenue |
| Revenue by region: West | ~30% of revenue |
| Revenue by region: North and East | ~25% of revenue combined |
| Inventory | ~1.5 months, improved from 1.8–1.9 months earlier |
| Receivables | 14 days, improved from 15–16 days earlier |
| Distributors | ~730 |
| Channel partners (active) | ~2,000 active out of ~4,500 total |
| Optical fiber pricing (standard) | ₹270–₹275 per km, down from ₹350 per km 1–1.5 years ago |
| Copper price drop in October | ~3–3.5% price reduction taken |
| BharatNet tender: cable requirement | ~650,000 km of cables of various sizes |
| BharatNet tender: estimated fiber consumption | ~2.5 crore km |
| Electrical cables sector mix: construction | ~60–65% of segment |
| Electrical cables sector mix: automobile | ~10–12% of segment |
| Electrical cables sector mix: agricultural | ~10–12% of segment |
| Annual cable business (power cable) | ~₹150–₹180 cr; industry size ₹23,000–₹25,000 cr |
| Advertisement and marketing spend | ~₹50 cr (full year estimate) |
| Preform plant Phase 1 capacity | ~100 tons of preforms per year, yielding ~0.45–0.5 cr km of fiber |
| Current fiber draw capacity | 0.4 cr km; expanding to 0.8 cr km over 2 years |