Key Takeaways
- Q4 recovery after a weak year: Revenue rebounded 14% QoQ in Q4, but FY25 was the first year in 5-6 where margins dipped and have not yet recovered.
- Mix shift toward lower-margin project sales: Project sales composition has shifted 8-10% over 3 years, a structural drag on blended realization that management flagged as the major mix-change driver.
- E-beam launch opens a premium revenue stream: Two new product lines commissioned in January, targeting INR 500-600 crores in annual revenue at full steam, though margin discovery is still underway.
- OFC cycle is turning, but slowly: Fiber prices hit unsustainably low levels last year; BharatNet orders are now released and a global fiber market shift is visible, though management's gut says utilization recovery comes "later than earlier."
- What to watch next quarter: Whether the June 1 price increase sticks, the pace of OFC order conversion from BharatNet, and any margin trajectory signal as e-beam pricing firms up over the next 3-4 months.
Demand & Volume Recovery
- Wires lagged cables for 2+ years: The company is wire-dominant, and wire demand has grown slower than cables, a trend management attributes partly to construction cycle timing.
- H2 wire revival expected: Management tied the outlook to ongoing construction activity, saying a second-half demand revival in the current fiscal "wouldn't be far-fetched."
- Q1 was difficult across the board: Post-election market enthusiasm was absent, and while peers got off the mark quicker, Finolex caught up only in Q4.
- Wire price volatility was extreme: Prices were revised 12 times in FY25 (6 up, 6 down), with a net cost impact of roughly 12.5-13%, purely reacting to commodity moves.
Viswanathan: "I think with the kind of construction activity that is going on, it wouldn't be far-fetched to say that the current fiscal from the second half, you should see a revival in demand."
Optical Fiber: Cycle Bottom & Recovery Path
- Fiber pricing hit unsustainably low levels: Last fiscal, fiber prices reached levels management called unrealistic to produce, partly driven by excess Chinese capacity and inventory, despite India's additional duty.
- A global shift is underway: Over the last 2-3 months, management noted a change in how the fiber market is developing globally, though no specifics were offered.
- BharatNet orders finally released: Bid mechanics concluded in November, but actual orders to winners only went out in March-April 2025. Winners have 3 years to build and 10 years to service, so procurement is just beginning.
- Utilization recovery: later than sooner: Management's gut feel is that OFC utilization recovery will take longer; July was called "a little optimistic."
- Beyond BharatNet: Several states (Gujarat, Maharashtra, Tamil Nadu, Andhra) are running their own fiber programs; Gujarat has already tendered, others are preparing DPRs, creating a 2-3 year demand tail.
- Data centers and 5G add structural demand: Fiber-to-home applications and data center consumption are driving different cable types as 5G rollout progresses.
Viswanathan: "I have even heard of $2.5 a kilometer kind of numbers at which price it's really unrealistic to produce."
Viswanathan: "My gut feel says that it would be more later than earlier. I think July is probably -- from where I stand, it's probably a little optimistic but later for sure."
E-Beam: New Premium Product Line
- Commissioned January 2025: Two product sets launched: a premium halogen-free, flame-resistant building wire with 25-year minimum life, and solar cables targeting the solar power industry.
- Solar cable BIS certification secured: Received recently, clearing the path for commercial sales into the government-push solar market, where monthly volumes of 20,000-25,000 km "can only increase."
- Revenue target: INR 500-600 crores annually: Management expects this run-rate from the two initial products at full steam, with newer products adding further.
- Pricing still in discovery: Launch prices are attractive, but final pricing policy will be determined over the next 3-4 months as demand picks up; management declined to discuss margin profile, calling it "a little early."
- EHV market opportunity: The EHV market can grow to $2 billion over the next 4-5 years, and the company is "reasonably placed" to get orders, though EHV revenue sits in the JV, not on Finolex's own books.
Backward Integration: Preform Facility
- Mechanically complete, trials imminent: The preform facility is installed; production trials were slated to start "sometime this month," with 2-3 months needed for stabilization before product reaches the market or internal consumption.
- Margin accretion expected: Management framed this as backward integration that reduces import dependency, lowers inventory levels, and results in "attrition to the margins."
- Ramp-up path: First-year utilization "not going to be very high"; from the second year, management targets at least 60-70% ramp-up.
- Export optionality unlocked: Once own preform production is online, prior agreements with overseas suppliers not to compete in certain territories "are no longer relevant, and we could."
- Fiber capacity expansion: A new fiber capacity machine is expected around December 2025, with another 2-3 months for installation and commissioning.
Viswanathan: "Today, when you buy the product, you want to buy it for a certain period of time, say, your inventory levels are much higher, whereas you make it on your own, then your inventory levels can be managed with lower numbers as well. So those are all savings that you will get -- so we definitely expect this project to result in attrition to the margins."
Margins & Mix Pressure
- FY25 margin dip breaks a 5-6 year trend: Margins took a dip and have not yet returned to prior levels, though management says they are "going towards that" with gradual improvement expected.
- Project mix is the structural drag: The shift toward discounted project sales versus standard box sales has been 8-10% over three years, more pronounced this year, and is the major reason for mix change.
- Price increase of 3% effective June 1, 2025: A modest upward adjustment that will test demand elasticity as the construction season unfolds.
- Capex nearing completion: The remaining portion of the INR 500 crores plan will be spent in the current fiscal, with all projects expected to close by fiscal year-end.
Competitive Positioning
- Q4 growth in line with peers: The 14% QoQ growth was not very different from peers, though some peers have larger absolute volumes.
- Q2 and Q3 underperformance: The company lagged peers in those quarters; management attributed the gap to others getting off the mark quicker after the post-election lull.
- OFC market share at 11%: Management disclosed domestic market share but declined to estimate total country capacity, saying they would need to look up the numbers.
- Submersible and coaxial niches: Finolex has submersible cable lines (3 core flats), coaxial lines in Goa, and is a long-term supplier to Tata Play, Sun TV, Airtel, and most DTH operators.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| E-beam revenue run-rate | INR 500-600 crores annually from two initial products | At full steam (no date given) |
| Capex closure | Remaining INR 500 crores plan spent; all projects closed | By end of current fiscal |
| Preform production trials | Trials begin, then 2-3 months to stabilize | Trials "this month"; product thereafter |
| Fiber capacity machine | New machine delivered, then 2-3 months to install/commission | Around December 2025 |
| Preform utilization ramp-up | At least 60-70% utilization | From second year of operation |
| Wire demand revival | Second-half pickup tied to construction activity | H2 of current fiscal |
| Margin recovery | Gradual improvement back toward prior levels | No timeline given |
Key Metrics
| Metric | Q4 FY25 |
|---|---|
| Revenue growth | ~14% QoQ and 35% from Q3 FY25 |
| Wire price changes (FY25) | 12 revisions, 6 upward and 6 downward; net cost impact ~12.5% to 13% |
| Wire price change (effective June 1, 2025) | 3% upward |
| FY25 capex actual spend | ₹236 cr, part of a ₹500 cr plan; ₹160 cr spent in FY24, remainder in FY26 |
| Project sales mix shift | 8% to 10% delta toward project sales over 3 years |
| E-beam facility revenue potential | ₹500 cr to ₹600 cr per year at full steam |
| EHV market size | $400 mn to $500 mn currently, with potential to reach $1.5 bn to $2 bn |
| OFC market share | ~11% |
| Fiber price (global) | $2.5 per km at trough; moved up to $3.5 per km (per an analyst's math) |
| Preform facility status | Mechanically completed; production trials starting June 2025 |
| Fiber capacity expansion | Machine expected around December 2025, plus 2–3 months to commission |
| Preform utilization outlook | 60% to 70% ramp-up from second year; payback ~4.5 years at 70% utilization |
| E-beam solar cable market volume | 20,000 to 25,000 km per month currently |
| Harness cable segment revenue | ₹400 cr to ₹500 cr |