Key Takeaways
- Supply-constrained quarter, now resolved: PTFE revenue fell 16% QoQ because TFE was diverted to start R125 and a third TFE line was delayed; that third line is now fully operational from July, removing the bottleneck.
- New-age fluoropolymers are the growth engine: FKM, PVDF, PFA and micro powders delivered strong volume and double-digit price growth, with full backward integration into R142b now reflected in the numbers.
- Battery chemicals are a material, near-term catalyst: The LiPF6 plant commissions by end-CY22, samples ship in January, and commercial production begins ~Q1 FY24; management sees an opportunity at least as large as the Specialty Chemicals business over five years.
- Power costs are a persistent margin drag: Coal remains at ~$125/MT and grid pricing is high; management expects no relief until FY25, though a cost-reduction initiative is in the works.
- What to watch next quarter: Whether PTFE volumes rebound now that TFE is unconstrained, the pace of new fluoropolymer capacity additions, and initial customer feedback on PVDF battery binder grades.
TFE Bottleneck & PTFE Recovery
- The Q1 disruption: PTFE revenue dropped 16% sequentially because TFE was diverted to start R125 production on a new route, and the third TFE plant startup was delayed; PTFE utilization fell to ~85% versus a normal 90–100%.
- Bottleneck resolved: The TFE 3 plant is now operational and in full production from July; management stated that from this quarter onwards, TFE availability should not constrain any product category including PTFE.
- Demand backdrop intact: PTFE demand remains strong, with ~75% of production exported to Europe and the U.S.; legacy Western suppliers are not adding capacity due to strict environmental controls and raw material constraints, creating a structural supply shortage that the company is filling with grades for demanding applications.
- Debottlenecking underway: A 20–25% PTFE capacity increase is targeted over the next six months, by end of FY23.
Vivek Jain: "The Chinese are not present in most of the grades, at least in the Western markets. So, we don't see their presence there at all, even despite whatever, supply disruptions which might be happening, or production disruption might have been happening in China over these last two, three years."
New-Age Fluoropolymers: Pricing Power & Capacity Build
- Broad-based growth: FKM, PVDF, PFA and micro powders all contributed to revenue growth, with both volumes and prices rising; Q1 over Q4 price uptick was in double-digit percentages.
- Pricing power rooted in substitution difficulty: The company has developed a large number of grades across applications, making displacement hard; European cost increases and material availability issues provided additional tailwinds, and management expects to continue benefiting on realizations.
- Backward integration complete: The company stopped importing R142b entirely; Q1 numbers reflect the full benefit of captive R142b for PVDF and FKM, and excess R142b will now be exported to select customers.
- FKM market position: The company has developed ~20–25 grades suitable for every application, diversified its customer base across geographies, and started supplying high-end grades to China for battery sealing; market share is expected to reach ~10% of the world market by the time new capacities come online, possibly by year-end.
- Capacity roadmap: Total fluoropolymer capacity will reach ~20,000 metric tons by end-FY23; new fluoropolymer capacity additions will continue through the year, with utilization on the enhanced base expected at 75–80% by year-end, ramping further in FY24.
Vivek Jain: "Given the fact that we have now developed large number of grades for various applications within FKM usage also, it's difficult for any, is difficult for more supplies coming in, to displace us. So, from that point of view, we feel that we have a fairly good position in the market, as a result of which we hope that we will be able to sustain our prices."
Battery Chemicals: The Next Leg
- LiPF6 timeline: Plant commissioning by end of calendar year 2022, give or take 1–2 months; samples to potential customers in January 2023; validation takes ~3 months; commercial production begins ~Q1 FY24.
- Integrated complex: The plant will produce lithium fluoride, PF5, LiPF6, and electrolyte; initial prototype capacity is ~2,000 tons, expected to be utilized over the next two years, with substantial augmentation planned as battery capacities come up across geographies.
- Market entry strategy: Exports first, followed by domestic sales; domestic demand from battery manufacturers is expected in H2 CY24, alongside demand from European battery manufacturers.
- PVDF for batteries: Grades for battery binders have been developed and sent to potential customers with favorable response; commercial supplies could start in ~4–5 months, with first approvals expected in the next few months.
- Opportunity scale: Management sees battery chemicals as a similar kind of opportunity to the Specialty Chemicals business (~₹2,000 crore), if not larger, over the next five years; fluoropolymers for batteries and hydrogen fuel cells are seen as huge growth drivers in revenues, CapEx, and profitability over the next 2–3 years.
- Adjacent developments: PVDF film for solar backsheets is under commissioning and will be commercialized in Q1 next financial year; PEM membrane development is ongoing with CSIR labs, with commercialization still ~1.5 years away, aligned to when electrolyzer and fuel cell production scales up.
Vivek Jain: "I think it'll probably be larger over the next five years in development to a fairly significant business."
Refrigerants & Specialty Chemicals
- Refrigerants growth: Incremental revenue was largely from R125, which started production last quarter on the TFE route, with some normalization of R22 which had been lower in the prior quarter.
- Realization outlook solid: Management stated there will be no impact on refrigeration gas realization even in the next two quarters.
- Specialty Chemicals recovery: Growth was seen because the prior quarter was subdued due to specific incidents; new plants at various stages of commissioning are now yielding results, and performance is expected to continue.
Costs, Power & Balance Sheet
- Power cost headwind: Coal remains at a fairly high price of ~$125 per metric ton, and grid pricing is also elevated; management does not expect much reduction in power costs until FY25.
- Cost-reduction initiative: The company is working on a possibility that could reduce power cost fairly significantly from FY25 onwards; details were not disclosed.
- Wind power update: A 20 MW project is delayed by about 1–1.5 months, with commissioning expected by end of Q2; some benefit will start trickling from Q3. The remaining 100 MW is on hold until the state government announces a captive wind policy; if the policy is favorable, the company may add more capacity.
- Balance sheet: The company is virtually debt-free; working capital cycle further reduced to 109 days; debt could possibly go up by another ₹200–250 crore.
- CapEx: FY23 plan is ~₹1,150 crore total, with ₹300 crore added to gross capital in Q1; next year's projected CapEx is ~₹1,000 crore.
- Subsidiary profitability: Meaningful improvement in Q1 due to favorable price movements reflected in sales from LLC and GMBH, driven by transit inventory gaps when goods ship from India.
Vivek Jain: "I think for the time being, at least for the next one --- till the end of 2023, '22-'23, '23-'24, we don't expect much reduction in power costs. Beyond that, we are looking at the possibility and this is something which is, I cannot share with you the details at this point of time. But we are working on a possibility which can help us in reducing power cost fairly significantly from the year... '24-'25."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| PTFE capacity debottlenecking | 20–25% increase | By end of FY23 |
| Total fluoropolymer capacity | ~20,000 metric tons | By end of FY23 |
| New fluoropolymer capacity utilization | 75–80% on enhanced base | By end of FY23 |
| LiPF6 plant commissioning | Project completion | End of CY22, give or take 1–2 months |
| LiPF6 customer sampling | Samples shipped for validation | January 2023 (calendar) |
| LiPF6 commercial production | Commercial sales begin | ~Q1 FY24 (after ~3-month validation) |
| PVDF battery binder commercial supplies | First supplies to customers | ~4–5 months |
| PVDF solar backsheet film commercialization | Commercial production | Q1 next financial year |
| Wind power (20 MW) commissioning | Installed and operational | By end of Q2 FY23 |
| Power cost reduction | No material reduction expected | Until FY25 |
| Refrigeration gas realizations | No impact on realization | Next two quarters |
| FY23 CapEx | ~₹1,150 crore total | FY23 |
| FY24 CapEx (projected) | ~₹1,000 crore | FY24 |
Key Metrics
| Metric | Q1 FY23 |
|---|---|
| Consolidated revenue | ₹1,334 cr, up 46% YoY |
| Consolidated EBITDA | ₹459 cr, up 80% YoY |
| EBITDA margin | 34%, up 6 percentage points from 28% YoY |
| Consolidated PAT | ₹303 cr, up 101% YoY |
| Caustic soda revenue | ₹189 cr, up 115% YoY |
| Chloromethanes revenue | ₹102 cr, up 9% YoY |
| Refrigerants revenue | ₹196 cr, up 111% YoY |
| PTFE sales | ₹379 cr, up 18% YoY |
| New fluoropolymer sales | ₹331 cr, up 124% YoY |
| Specialty chemical sales | ₹119 cr, up 38% YoY |
| RoCE | 35.3%, improved from 24.46% in FY22 |
| ROE | 27.70%, improved from 20.1% in FY22 |
| Net debt equity ratio | 0.29 |
| Working capital cycle | 109 days, reduced from 120 days as on 31st March 2022 |
| PTFE capacity utilization | ~85%, lower than normal ~90–100% due to TFE diversion to R125 and other products |
| New fluoropolymer capacity utilization | ~75% |
| New fluoropolymer capacity addition in Q1 | ~400 tons |
| New fluoropolymer capacity by end of FY23 | ~1,500 tons, up from ~700 tons last year |
| PTFE debottlenecking target | 20–25% capacity increase by end of FY23 |
| FKM market share by volume | ~6–7%, expected to reach ~10% by end of year |
| Caustic soda realization | ₹50–51/kg (consolidated) |
| Coal price | ~USD125 per metric ton |
| FY23 planned CapEx | ₹1,150 cr, with ~₹300 cr added in Q1 |
| FY24 projected CapEx | ~₹1,000 cr |
| Gross capital as of March 2022 | ~₹4,300 cr |
| Battery chemicals prototype capacity | ~2,000 tons, expected to be utilized in next two years |
| Solar backpanel PVDF capacity | ~700 metric tons per year |
| R125 capacity | ~5,000 tons |
| PTFE exports to Europe and US | ~75% of PTFE production |
| Wind power project | 20 MW commissioning delayed by ~1–1.5 months, expected by end of Q2 FY23 |