Key Takeaways
- A quarter defined by destocking: Revenue fell ~30% QoQ in both bulk chemicals and fluorochemicals as excess supply, weak summer demand and customer destocking hit simultaneously.
- Recovery pushed to H2: Management expects Q2 to look similar to Q1, with the business environment picking up only from Q3 and normalizing by end-FY24.
- Expansion plans are slipping: The R32 project is formally on hold, and both fluoropolymer volume ramp and broader CAPEX plans face spillover of a quarter or more.
- Battery chemicals are the next catalyst: Salt and electrolyte plants are in advanced commissioning and expected online by end-Q2, with meaningful revenues targeted from FY25.
- What to watch next quarter: Whether destocking shows signs of easing, progress on wind-power approvals and commissioning, and any update on the R32 project when management revisits it.
Destocking & Demand Weakness
- Bulk chemicals hit by oversupply: Revenue dropped ~30% QoQ, driven by price declines from excess supply in the market; management expects weakness to persist for the next few quarters until that supply is absorbed.
- Fluorochemicals hurt by weather and destocking: A weak summer in domestic and overseas markets compounded the destocking pressure, producing a ~30% QoQ top-line decline, mainly in refrigerants.
- Fluoropolymer volumes corrected on destocking: Prices held stable, but volumes dipped marginally as high US interest rates drove destocking; PVDF for EVs saw additional pressure from a China slowdown that created excess supply and pricing headwinds.
- China EV growth decelerated: EV growth in China this year is materially lower than last year; outside China, a growth buildup is expected only from 2025 onwards.
- Destocking resolution is the H2 bet: Management is monitoring for a turnaround as restocking normalizes and hopes destocking gets sorted out by the second half of FY24.
Dr. Bir Kapoor: "in order to realize the full certain capacity utilization, this may spill over probably by a quarter or a little bit more around that, there might be a little bit delay but the plan is moving forward"
Capacity Expansion & Project Delays
- R32 project formally on hold: Management stated the plan is on hold at this point and will be revisited maybe a quarter later; no commitment was given on whether the 10,000 TPA capacity can be scaled up.
- Fluoropolymer volume ramp delayed: The target of a 1,000–1,200 metric ton per month run rate in Q4 may spill over by a quarter or more due to the market slowdown.
- Broader CAPEX spillover: The entire ₹1,500 cr CAPEX plan may not be completed this year; some spending may spill over to next financial year, with the pace linked to battery chemical segment growth.
- PTFE de-bottlenecking complete: The PTFE expansion was de-bottlenecking rather than new capacity addition and is already in place, positioning the company to capture volume when the market turns.
- PVDF solar still on track: The PVDF solar project is expected online by Q2 FY24; management is still holding to that plan.
Dr. Bir Kapoor: "There may be a spillover of a quarter or so. But that's probably, but plans are in place. We have all the building blocks in place and looking at the market, turnaround and market picks up we will add that capacity there is no point in adding capacity if there are headwinds."
Battery Chemicals & New Initiatives
- Salt and electrolyte plants nearing commissioning: Both plants are in advanced stages of commissioning and expected to come online by end of Q2 FY24.
- Meaningful revenue from FY25: Management expects to start recognizing meaningful revenues from battery chemicals in FY25, post-approval processes.
- LFP cathode and FSKM in the pipeline: The company has applied for environmental clearance to manufacture SPO (LFP active cathode material) and FSKM (specialized fluorinated FKM); management called details premature to share.
- Electrolyte integration ambition: The plan is to make electrolyte as a product and possibly all chemicals and components that go into electrolytes.
- Battery PVDF approvals progressing: Approvals are expected in the next one or two quarters; lab-scale feedback has been positive but final battery testing has been slowed by the EV segment slowdown.
- Economics undisclosed: Management declined to share ROCE or financial parameters for the battery chemical segment, calling it premature given that Indian battery industries are still some distance from setting up capacities.
Dr. Bir Kapoor: "Pratik it would be very premature for me to share the economics about this."
Fluoropolymer Product & Mix Evolution
- Mix shift toward higher-end grades: Most new fluoropolymer capacity is for the highest-end grades; across the entire PTFE spectrum, maybe 10% in the granular segment could face pricing pressure, while higher-end grades and unique qualified grades have not seen significant pressure.
- PFA semiconductor progression: The company is supplying base grades to a leading manufacturer and progressing step-by-step into higher grades; it may expand capacities in PFA for semiconductor-grade applications, which carry stringent impurity requirements.
- Blended realization improvement expected: Management expects blended realizations to improve due to product mix, both within PTFE (moving to higher grades like fine powders and aqueous) and from new fluoropolymers.
- Long-term contract potential: Management sees the possibility for contract-based supplies in semiconductor and battery segments as those markets evolve, with discussions ongoing with players.
- Product approvals by FY25: Management expects a lot of approvals to be in place by FY25.
PFAS & Regulatory Positioning
- Fluoropolymers expected to be carved out: Management maintains that fluoropolymers are long-chain solids, not soluble in water, and have no leachable water-mobile compounds, so they should be excluded from PFAS restrictions.
- PFAS-free PTFE already developed: The company has developed a grade using non-fluorinated surfactant in most PTFE segments and is in advanced stages of getting approval and taking it to market.
- Transition effort predates the PFAS headlines: The effort to move toward non-fluorinated surfactants started much before the PFAS issue emerged in the last six months.
- Different surfactants for different grades: Non-fluorinated surfactants used vary by application, grade and fluoropolymer; there is no single unique molecule replacing fluorinated surfactants.
- GX902 and GX905 to be eliminated: These surfactants will not be used and will be replaced by surfactants without fluorine, eliminated completely to some extent.
- FKM and PVDF unaffected: FKM does not use any surfactant that is PFAS-free, and the same applies to PVDF.
- Targeting NFS transition by end-FY24: Management expects to get most products moved into non-fluorinated surfactant by end of FY24 and is pushing to make it happen as soon as possible.
Dr. Bir Kapoor: "Fluoropolymers typically are long chain compounds and what we believe is that eventually the regulation comes out... fluoropolymers all said and done are solids and these are not soluble in water, these are long chain compounds and they have no leachable water mobile compounds."
Margins, Energy & Other Updates
- Margin guidance maintained: Management expects margins to remain in the 28–30% or 32–33% range.
- Wind power project advancing: The company has received approvals for three locations and has five more applications in the pipeline, expected this quarter; commissioning of windmills will start after all eight approvals are received.
- Wind power benefits from next financial year: By Q2, all approvals should be in hand; within six months, all windmills should be up, with cost-reduction benefits flowing in the next financial year.
- R125 pickup expected in H2: The first half was slow; R125 is expected to pick up in H2, primarily catering to next year's requirements.
- R&D progressing on green hydrogen: PM development for green hydrogen, fuel cells and electrolysers is progressing well.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Demand recovery | Business environment to pick up and normalize | From Q3 FY24, normalizing by end-FY24 |
| Q2 outlook | Q2 expected to be similar to Q1 | Q2 FY24 |
| Battery chemical plants online | Salt and electrolyte plants in advanced commissioning | End of Q2 FY24 |
| Meaningful battery chemicals revenue | Revenue recognition to start | FY25 |
| PVDF solar project online | Project expected online | Q2 FY24 |
| Fluoropolymer volume ramp | 1,000–1,200 MT/month run rate target | Q4 FY24, may spill over by a quarter or more |
| CAPEX spillover | ₹1,500 cr plan may not complete this year | Spillover to next financial year |
| R32 project revisit | Management to look back at the plan | A quarter later |
| Wind power approvals | All eight approvals expected | By Q2 FY24 |
| Windmill commissioning | All windmills up within six months of approvals | Within six months post-Q2 |
| Wind power cost benefits | Benefits to flow | Next financial year |
| PFAS-free transition | Most products moved to NFS | By end-FY24 |
| Product approvals | Lot of approvals to be in place | By FY25 |
| Battery PVDF approvals | Approvals expected | Next one or two quarters |
| EV growth outside China | Growth buildup expected | From 2025 onwards |
| R125 pickup | Expected to pick up | H2 FY24 |
Key Metrics
| Metric | Q1 FY24 |
|---|---|
| Consolidated revenue | ₹1,209 cr, down 9% YoY |
| Consolidated EBITDA | ₹328 cr, down 24% YoY |
| EBITDA margin | 29%, down from prior year |
| Consolidated PAT | ₹201 cr, down 34% YoY |
| Bulk chemicals revenue decline | ~30% QoQ, driven by price drops from excess supply |
| Fluorochemicals revenue decline | 30% QoQ, mainly on account of refrigerants |
| Full-year margin guidance | 28–33% range expected |
| CAPEX plan for FY24 | ₹1,500 cr; management expects some spillover to next financial year |
| PVDF solar capacity timeline | Expected online by Q2 FY24 |
| Wind power cost savings | ₹22–25 cr annually, starting next financial year |
| PTFE granular grade exposure | ~10% of PTFE grades, the segment most susceptible to pricing pressure |
| Product approval to commercial orders timeline | 6 months to 2.5 years conservatively, depending on grade |
| Non-fluorinated surfactant transition | Expected for most products by end of FY24 |