Key Takeaways
- Muted quarter, temporary headwinds: Volume de-grew 10% in Q3 as unseasonal rain, a tomato crop shortfall and a late-quarter Red Sea export freeze all hit at once. Management expects a better Q4.
- Realization dropped 19%, but it is a mix-and-timing story: The decline reflects current-season inventory priced at lower raw material costs, not structural price erosion.
- The balance sheet is absorbing capex: Interest costs rose as new assets were commercialized, rates climbed and a PLI interest subvention ended, while higher inventory added working capital load.
- New ventures are in test-production, not revenue: The pectin project has started test runs and the Green Top consumer brand is at ~INR25 lakhs/month, but both are pre-scale.
- What to watch next quarter: Whether Q4 volumes actually beat Q4 FY23 as lined up, the pace of Tetra Recart co-packing signings, and any update on the ~INR18 crores PLI incentive receipt.
The Quarter’s Three Headwinds
- Unseasonal rain chilled beverage offtake: Rain in northern India on 2 May 2023 suppressed temperatures, which cut demand from large beverage brands (Coca-Cola, PepsiCo, Parle) and flowed through to lower offtake in both Q2 and Q3.
- Tomato crop failure in Nashik: Inadequate rain and water availability hit tomato production in the Nashik region, directly reducing the volume of tomato products the company could produce and sell in Q3.
- Red Sea disruption froze exports for 10 days: From 20 December onward, vessel availability collapsed, bringing export shipments to near zero for the last 10 days of the quarter. Because 99% of contracts are FOB, the company invoked force majeure on the few CIF/CFR contracts and all customers agreed to revise pricing, so the P&L impact was limited to the volume delay, not a margin hit.
Saha: "I think 99% is FOB. There may be a couple of contracts on CIF or CFR basis, but now this is the force majeure clause. So we have approached all the customers who are having the CIF contracts and everybody has agreed to revise the price. So there is no impact on us on the recent Red Sea issue."
Volume & Realization Dynamics
- Volume de-growth of 10% in Q3, 13% over nine months: The committed-volume business model means customers take product anytime over a 15-16 month window, so quarterly call-offs can shift without cancelling the order book. Management has lined up Q4 FY24 volumes to exceed Q4 FY23.
- Realization down 19% is a base-effect, not a price cut: Q1 FY24 realization was inflated by inventory spilled over from FY23 (the CY22 production year). Q3 realization reflects the current season’s inventory booked at lower raw material prices. Realization also swings with product mix, which spans INR30 to INR450 per kg across mango, tomato, guava, vegetables and soy powder.
- Q4 realization will also be lower YoY: Last year’s Q4 realization jumped 26% because the entire prior-year inventory landed in that quarter. This year, inventory is at a much lower price, so the YoY comparison will look weak even if sequential trends are normal.
Interest Cost & Balance Sheet
- Interest cost rose on four fronts: Newly commercialized capex moved from the balance sheet to the P&L, interest rates increased, the PLI interest subvention scheme ceased to apply, and higher inventory drove additional working capital debt.
- Total liability is flat year-on-year: While debt increased, creditors reduced by a corresponding amount, so the sum of debt plus creditors is at the same level as last year. When customers eventually call off inventory, the sales price includes an element that compensates for the inventory holding cost.
New Ventures: Pectin, Green Top & Tetra Recart
- Pectin project (Beyond Mango) in test production: The plant is established at Chittoor, the largest mango pulping belt in India, outside one of the company’s three existing factories there. Waste is currently collected from the western region, dried, and transported to Chittoor. Commercial production is targeted for Q1 FY25.
- Expansion is contingent on first success: Management says the pectin line is easy to replicate and scale, but will not commit to a second phase until the first project proves itself. Stage-two products like cocoa butter equivalents would follow only after pectin manufacturing is established.
Krishnan: "It's very easy to actually replicate and expand the capacity. But we will want to first be successful in the first project and then probably take the call of the next expansion."
- Green Top consumer brand is sub-scale and deliberate: The frozen category brand, launched 8-9 months ago in general trade, is selling ~INR25 lakhs per month and expanding slowly while the company analyses each market’s acceptability. The predecessor brand Triveni was discontinued and relaunched as Green Top, which is 100% Foods & Inns owned.
- Tetra Recart: high capacity, no co-packing partner yet: Seven products are launched (one mango pulp, six ready-to-eat) but taste profiles need corrective action. A smaller testing line is producing samples for brands, and management is hopeful of signing a co-packing deal soon. Real capacity utilization depends on other brands using the facility.
Dalal: "It's a very high capacity line. So, we will have to do minimum production of a very high size..."
Domestic & Export Markets
- Domestic beverage tailwind is structural: Coke and Pepsi have increased capacity by 30% since COVID and plan to invest a further 20-25%. The company intends to grow with that flow.
- Export focus is not being neglected: The company continues to look for new geographies. Export realizations benefit from selling the premium Alphonso variety, while domestic sales are weighted toward lower-priced Totapuri.
- Spices (Kusum) capacity can scale 3-4x: Manufacturing has been shifted to Nashik facilities, and the B2B business already supplies brands like Ching’s. Management sees no capacity constraint to growing several-fold from current levels.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Q4 FY24 volumes | Deliver better volumes than Q4 FY23 | Q4 FY24 |
| FY24 top line vs FY23 | No major challenge to maintain ~INR1,035 crores level | FY24 |
| Pectin project commercialization | Commence production | Q1 FY25 |
| Warrant conversion | Balance 70% of allottees yet to exercise | Due June 2024 |
| Promoter holding floor | Endeavour to maintain minimum 25-26% post warrant conversion | Post warrant conversion |
| Forward revenue guidance | ~INR1,800 crores (3-4 year forward) | Not dated |
| Green Top retail expansion | Launch in D-Mart, Reliance, Forex, Spencer over a period of time | Not dated |
Key Metrics
| Metric | Q3 FY24 |
|---|---|
| Revenue | INR1,035 cr in FY23; management expects to maintain similar levels in FY24 |
| Volume de-growth | 10% in Q3 FY24 |
| Volume de-growth (9 months) | 13% for 9M FY24 |
| Realization change | down 19% in Q3 FY24, after 29% jump in H1 FY24 |
| Realization range | INR30 to INR450 per unit, depending on product mix |
| Interest expense | close to INR10 cr per quarter for last three quarters |
| Order book | 40% more than what was produced last year |
| Production (previous year) | approximately 1,30,000 tons |
| PLI incentives applied | INR18 cr for second year of FY23, awaiting receipt |
| Cold-Chain Subsidy received | INR3.37 cr on 25th January 2024, capital subsidy not in P&L |
| Tetra Recart investment | INR30-odd-crores |
| Tetra Recart revenue potential | INR100-odd-crores on fully utilized single line |
| Tetra Recart EBITDA margin guidance | north of 15% to 18% |
| Pectin project (Beyond Mango) estimated revenue | INR15 cr, with Foods & Inns share at 50% |
| Green Top brand monthly sales | around INR25 lakhs per month |
| Domestic vs export mix | 61% domestic, 39% export |
| Promoter holding | 20% to 21% post reclassification |
| Warrant conversion status | ~30% of allottees converted, balance 70% due by June 2024 |
| Promoter holding target post conversion | minimum 25% to 26% |
| Kusum Masala capacity expansion potential | 3x to 4x plus from current level |