Key Takeaways
- A quarter of two halves: Revenue held flat QoQ at ₹1,146 crores as firmer realizations offset a sharp volume drop, but EBITDA margin collapsed to 9.64% from 16.19% in Q1 because planned and unplanned shutdowns at Gorakhpur coincided with a spike in input costs.
- The shutdown was the story: A deliberate integration shutdown to hook up expanded Gorakhpur capacity was compounded by an extended power plant outage, compressing volumes, raising power costs, and masking the benefit of a late-quarter steel price rally.
- Steel prices are now running hot: TMT prices rose ~21% in September on domestic demand even during the monsoon lean period, and management expects them to stay strong as construction season peaks from December onward.
- The raw material unlock is years, not quarters, away: Captive iron ore mines remain targeted for FY28 and the newly awarded coal block needs 2–3 years to become operational, so the promised ~₹2,000/ton EBITDA uplift is a medium-term story.
- What to watch next quarter: Whether Gorakhpur’s expanded capacity ramps to the promised 85–90% utilization by December end, whether the power plant restart and solar savings actually lift margins back toward double digits, and whether the September steel price rally holds into the construction peak.
Shutdowns & Margin Compression
- Gorakhpur integration shutdown: A planned shutdown to synchronize new capacity with the running integrated chain (pellet through TMT bars) pulled volumes down to 1,65,000 tons from ~1,92,000 tons in Q1. Maintenance of existing units was brought forward into the same window, concentrating the hit.
- Power plant outage: The Gorakhpur captive power plant was down for scheduled maintenance that ran longer than planned because a turbine issue required specialist support, reducing captive power availability and raising power costs during the quarter. The turbine is now resolved and the plant was set to restart within a week of the October 21 call.
- Input cost squeeze: Coal and freight stayed elevated, and prices of metallics (sponge iron, pig iron) rose sharply in the second half of the quarter. Management estimated raw material cost increases at ~₹3,000/ton on TMT, with coal alone contributing ~₹2,500/ton.
- Realizations came too late: The sharp TMT price rise happened only in September, the final month of the quarter, so higher realizations did not materially offset the cost and volume damage within Q2.
- No split provided: When asked how much of the margin decline was one-time shutdown impact versus input costs, management did not quantify the breakdown, describing only the timing of price increases and coal cost impact.
Mayank Agrawal: "So, once the monsoon is now over, and we enter the month of November, where the construction activities pick up, and they peak in December onwards, we feel that the prices would remain strong in future, leading to good margins."
Gorakhpur Expansion & Second-Half Recovery
- Capacity ramp timeline: Enhanced Gorakhpur capacity was expected to be operational in November 2026, with operations proposed to start by November 10. Management targets 85–90% utilization by December end, barring major commissioning issues, with full potential realizable in Q4 and partly in Q3.
- Power cost relief coming: The restart of the Gorakhpur power plant plus the 18 MW Siddhpur solar plant (completed, resuming operations by November 2026) and the 60 MW Prayagraj solar plant (on track for Q4 FY27) are together expected to save ₹30 to ₹40 crores annually in power cost.
- Steel price tailwind: The recent TMT price increase is broadly based on the domestic demand cycle, and management expects demand to pick up further as construction season gets underway, peaking from December onward. If prices hold, it will result in much better EBITDAs.
- Gujarat debottlenecking: Captive power side efficiency improvements and capacity additions were completed last month, with results expected in Q3 itself. The sponge iron plant at Gujarat is set to commission in Q4, with benefits flowing from the next financial year.
- Kutch utilization: Rolling mill utilization at Kutch improved only marginally to 68% from 66% in Q1; distribution system enhancements were made but results are not yet significant. Structural improvement is expected in Q3 and Q4 as lean monsoon season demand picks up.
Mayank Agarwal: "Yes, steel prices, as we mentioned, has significantly risen. And what is exciting is that this price increase comes at a time where the lean period, the monsoon period was ongoing, and it is broadly based on the domestic demand cycle."
Captive Raw Material Strategy
- The ₹2,000/ton promise: Captive mines (iron ore and coal together) are expected to add about ₹2,000 per ton to EBITDA once operational, a benefit management has reiterated as a key medium-term margin driver.
- Iron ore blocks: Exploration is progressing and environment and forest clearance processes are underway. FY28 remains the target for them to become operational. In the first 1–2 years post-FY28, they will not feed 100% of steel plant requirements, so the full ₹2,000/ton benefit phases in as mining activity increases and mine capacities are utilized.
- Coal block award: Gallantt was awarded a coal block in Singrauli in August 2026. Management is currently doing due diligence and expects about one month to conclude whether to proceed. If moving forward, the block will take 2–3 years to make operational.
- Coal block impact: Once operational, the Gorakhpur unit would shift totally to it, eliminating all imported coal. Management noted the coal from the block seems much cheaper than current market purchases, which would change the whole cost dynamics of the Gorakhpur unit.
- No share quantified: When asked what share of coal needs the new block could meet, management did not provide a percentage or share figure.
Balance Sheet & Funding
- Net cash position: The company remains net cash positive with ₹426 crores in bank and liquid investments and ₹266 crores in short-term treasury against ₹592 crores in borrowings, which are mostly working capital with no term loans. Net worth rose to ₹3,487 crores.
- Inventory build: Inventories rose ~₹118 crores in H1 to ₹669 crores, driven by prolonged shutdowns for new capacity hookup and increased stocks at the plant to serve the added capacities. Normalization is expected in Q3.
- Capital work-in-progress: Rose to ₹598 crores from ₹349 crores in March, reflecting projects underway.
- Funding philosophy: Management intends to fund the current program primarily through internal accruals and expects the balance sheet to remain strong through FY27. For the medium-term growth plan, the capital structure will be decided depending on project size and opportunities, but the track record is to rely largely on internal accruals and less on external borrowings.
Dindayal Jalan: "I think as you have seen from our track record, we largely rely on internal accruals, and we rely less on the external borrowings. So, depending on the philosophy of the group and the requirement of the project, we'll decide the mix of the funding."
Medium-Term Growth Plan
- A larger greenfield under evaluation: Management is evaluating a larger greenfield opportunity built around the raw material base (iron ore plus coal) rather than only extending existing sites. The project depends on land acquisition and incentives from the state government.
- Disclosure timeline: Management intends to present the growth plan in Q4 FY27, preferring to come back with a plan that is concrete and fully worked out rather than one still taking shape.
- No new quantitative guidance: When asked for guidance on coming years, management reiterated previously stated drivers (iron ore block EBITDA, solar EBITDA, capacity expansion) without providing new quantitative annual guidance.
Dindayal Jalan: "A project of this nature depends on land acquisition and incentives from the state government, and we are working on that. We would rather come to you with a plan that is concrete and fully worked out, that's still taking shape. We therefore intend to present our growth plan in Quarter 4 '27."
Operational Initiatives
- Solar power build-out: The 18 MW solar plant at Siddhpur, Gujarat is completed and set to resume operations by November 2026. A 60 MW solar plant at Prayagraj, UP (serving the Gorakhpur unit) remains on track for Q4 2027. Together they are expected to save ₹30 to ₹40 crores annually in power cost.
- Digitization and AI: Multiple tools have been integrated with SAP including vendor tool management, compliance portals, and GST returns. AI initiatives have been implemented for main gate entry/exit and weighbridge systems integrated with SAP, removing human interference. Management noted it is difficult to quantify savings but expects the initiatives to make working seamless and plug leakages.
- Brand investment: Janhvi Kapoor was recently added as brand ambassador, while Ajay Devgn has been retained for four years. Advertising is running on national and regional platforms.
Mayank Agrawal: "…the human interference has been removed. So, a lot of initiatives are being done from the IT perspective. … it is difficult to comment on any number as to say that it would result to certain X number of savings. But yes, I mean, it is going to make the working very seamless, and leakages, if at all were there, which we were not aware of, would be plugged once and for all."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Gorakhpur expanded capacity ramp | Operations start by November 10; 85–90% utilization targeted | December end FY27 |
| Power plant restart | Turbine issue resolved; plant resuming operations | Within a week of Oct 21, 2026 |
| Siddhpur solar plant restart | 18 MW plant completed, resuming operations | November 2026 |
| Prayagraj solar plant commissioning | 60 MW plant serving Gorakhpur unit | Q4 FY27 |
| Gujarat captive power debottlenecking | Efficiency improvement and capacity addition completed; results expected | Q3 FY27 |
| Gujarat sponge iron plant | Commissioning | Q4 FY27; benefits from next financial year |
| Iron ore blocks operational | Exploration and clearance processes underway | FY28 |
| Coal block operational | 1 month to conclude due diligence; if proceeding, 2–3 years to operational | 2–3 years from decision |
| Medium-term growth plan presentation | Concrete plan to be shared | Q4 FY27 |
| Kutch utilization improvement | Structural improvement expected as lean season demand picks up | Q3 and Q4 FY27 |
| Next-year utilization improvement | 3–5% improvement after all shutdowns and project activities synced | Next financial year |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹1,146 cr, +13% YoY, in line with Q1 FY27 |
| EBITDA | ₹111 cr, margin 9.64% vs 16.19% in Q1 FY27 and 12.91% in Q2 FY26 |
| EBITDA per ton | ₹6,150, vs ₹8,010 in Q1 FY27 |
| Profit after tax | ₹61 cr, PAT margin 5.3% vs 10.8% in Q1 FY27 and 8.8% in Q2 FY26 |
| Earnings per share | ₹2.51 |
| TMT sales volume | 1,65,000 tons, vs ~1,92,000 tons in Q1 FY27 |
| Kutch rolling mill utilization | 68%, vs 66% in Q1 FY27 |
| H1 FY27 revenue from operations | ₹2,292 cr, +7% YoY |
| H1 FY27 EBITDA | ₹296 cr, margin 12.91% vs 17.85% in H1 FY26 |
| H1 FY27 capex | ₹278 cr, of which ~₹141 cr spent in Q2, all funded through internal accruals |
| Net worth | ₹3,487 cr as of 30 Sep 2026, up from ₹3,316 cr in Mar 2026 |
| Borrowings | ₹592 cr, mostly working capital, no term loans for projects |
| Net cash position | Net cash positive, with ₹426 cr in bank balances and liquid investments plus ₹266 cr in short-term treasury deployment |
| Inventory | ₹669 cr as of 30 Sep 2026, up from ₹551 cr in Mar 2026 |
| Capital work-in-progress | ₹598 cr as of 30 Sep 2026, up from ₹349 cr in Mar 2026 |
| Cumulative capex spent under ₹3,000 cr program | ₹650 cr up to Sep 2026 |
| TMT price increase (Sep 2026) | ~21% higher than a year ago |
| Raw material cost increase in Q2 | ~₹3,000 per ton, comprising ~₹2,500/ton from coal and ~1% on iron ore |
| Expected annual power cost savings from solar plants | ₹30–40 cr once both plants operational |
| Expected EBITDA addition from captive iron ore mines | ~₹2,000 per ton once operational, targeted FY28 |
| Brand premium in Uttar Pradesh | 5–6% over unbranded TMT |
| Brand premium in Gujarat | 3–4% over unbranded TMT |