Key Takeaways
- Export slump hit volumes and mix: Export TEUs fell over 15% QoQ, reducing double-stack ability and diluting rail EBITDA per TEU despite higher import realizations.
- PAT still grew 15%+ on debt reduction: The company continued to deleverage, and the Kashipur acquisition was funded with internal accruals plus INR 60 crores of incremental debt.
- Kashipur ICD is live, Jaipur is next: Kashipur’s first full month of operation lands in Q4 FY23, adding ~36,000 TEUs per annum at full run-rate; Jaipur ICD is targeted for Q3 FY24.
- DFC connectivity is the structural unlock: A new 40 km stretcher now starts DFC closer to Gateway’s terminal, and the Rewari-Dadri link is expected by end-2023, but the full modal-shift payoff waits for the JNPT connection years later.
- What to watch next quarter: Whether the January export uptick holds, the pace of Kashipur’s ramp, and the FY24 rail volume guidance that management deferred due to macro uncertainty.
Rail Container Business: Volume, Mix & Margins
- Export volumes dropped sharply: Global macro weakness drove a 15%–20% QoQ decline in export TEUs, while imports grew only in single digits. The resulting imbalance reduced double-stack and hubbing operations, leaving ~3,000–3,500 TEUs lying at the port.
- Realization rose but margin did not: A mix shift toward higher-priced imports lifted realization 11% QoQ, but the cost of the import-export imbalance fully offset that gain, so rail EBITDA per TEU stayed roughly flat.
- Track work and fog compounded the pressure: Slow train running and track maintenance cut throughput by ~7%–8% during the quarter; the track work is now complete.
- Market share grew in key corridors: On a 9-month basis, NCR market share rose to ~16% (from ~12%) and Ludhiana to ~35% after a fifth ICD entered the market; overall rail volumes were flat, so the gains came from competitors.
- Ludhiana scrap imports are a bright spot: Tata Steel’s investment increased scrap imports into Ludhiana, and some shipping lines shifted import volumes to Gateway’s ICD; management expects the scrap market to remain stable for another three months.
- Empty-container cost pressure: The railway withdrew its discount on running empty containers; Gateway is working with shipping lines on a cabotage model and creating storage space for empties to reduce the cost.
- EBITDA per TEU ambition: Management targets INR 10,000 per TEU with DFC and new terminals, and expects to get back to INR 9,500 very soon after temporary Kashipur start-up costs wash out.
Prem Kishan Dass Gupta: “We are aiming at INR 10,000 per TEU.”
Kashipur, Jaipur & the DFC Pathway
- Kashipur ICD is now operational: Services started for JNPT and Pipavav, which were not previously prevalent in that area; the first full month of contribution will be in Q4 FY23, and full-year benefit (~36,000 TEUs per annum) accrues in FY24.
- Temporary start-up costs in Q3: Margins were diluted by expenses for placing empties and vacating containers; normalization or improvement is expected from Q1 next year.
- Jaipur ICD on deck: Operational target is Q3 FY24 (end of calendar year); ramp-up will be slow, with no significant FY24 contribution and meaningful addition only in FY25.
- Two more ICDs being finalized: Both are along the Western DFC strategy and may be connected to the DFC rather than sitting directly on it.
- DFC connectivity is arriving in stages: A new 40 km stretcher now starts DFC from a New Rewari section, shortening the distance to Gateway’s terminal; Rewari to Dadri is expected by end-2023, Dadri to Mundra by end-2023, but Dadri to JNPT will take a couple of years.
- Rake fleet expansion stays on the cards: Three rakes per year are still planned to support the Kashipur and Jaipur network; rakes are available on at least six months’ notice, so plans can adjust to demand.
- Ownership economics are shifting: Management is evaluating buying rakes rather than leasing: interest plus depreciation nearly equals the lease cost, but the asset then remains for 25–30 years.
Samvid Gupta: “The next level will come when it's connected all the way to JNPT, when the full DFC is operational, basically, then that's when the next level of growth will come from -- shift from road to rail will happen.”
CFS & Blended Metrics
- CFS EBITDA held stable: Excluding Punjab Conware (which was present for the full Q3 of the prior year), performance was steady.
- CFS volumes expected flat in FY24: The run-rate reported in recent quarters, without Punjab Conware, is the base going forward.
- Blended EBITDA per TEU target is INR 6,000: No specific timeline is attached; management is doing everything to reach that number as soon as possible.
Samvid Gupta: “There's no specific timeline to it. It's just we're doing everything we can to reach that number as soon as possible.”
Snowman Logistics
- Outstanding quarter financially: Snowman delivered a strong Q3, with the Trading & Distribution margin jumping from ~4.6% to 7.1% QoQ due to a mix change across three clients with different margins; the sustainable margin is expected around 5% as the business scales.
- BDP partnership for chemical warehousing: A 55,000 sq ft best-in-class chemical handling warehouse is being set up in Shoolagiri near Bangalore, offering storage and distribution within a 300 km radius.
- Custom-built facilities expanding: Work started in Shoolagiri, Tamil Nadu, with more locations in progress; services include storage, handling, order processing, warehouse management, and secondary transportation.
- Trading & Distribution revenue mix: Expected to remain at 25% or grow further; the store distribution model is targeting 40%–50% YoY growth.
- ASP increase expected similar to last year: Renewals from March onward should deliver an ASP increase comparable to last year’s ~7%.
- ERP migration complete: Snowman migrated to an ERP system that supports the trading and distribution business, with commercial processes now being put in place.
- Full-year guidance deferred: Management will provide Snowman’s full-year guidance next quarter after the budgeting process.
Domestic Rail & Other Strategic Topics
- Domestic rail is opportunistic only: Management sees the Indian Railways network as too slow for viable domestic container movement; turnaround times and pricing do not support the business, so any domestic activity will use spare capacity within existing terminals.
- Longer-term domestic consideration: The company may evaluate domestic rail more seriously once its network covers more regions.
Prem Kishan Dass Gupta: “...the Indian railways network is not good enough to have that movement, because the running time is very slow. And whether it's from Mundra to South or the coastal or from North to South, this domestic business, while there might be a requirement, but the pricing and the turnaround of the asset is not good.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Rail volumes FY23 | At least match last year with slight growth from Kashipur | FY23 |
| Kashipur full run-rate | ~36,000 TEUs per annum | FY24 |
| Jaipur ICD operational | Operations begin; slow ramp, no significant FY24 contribution | Q3 FY24 (end of calendar year) |
| DFC Rewari to Dadri | Connectivity expected | End of 2023 |
| DFC Dadri to Mundra | Connectivity expected | End of 2023 |
| CFS volumes FY24 | Flat, at the run-rate of recent quarters ex-Punjab Conware | FY24 |
| Rail EBITDA per TEU | Return to INR 9,500 very soon; target INR 10,000 with DFC and new terminals | No date (INR 9,500 “very soon”) |
| Snowman ASP increase | Similar to last year’s ~7% | Renewals from March onward |
| Snowman Trading & Distribution store model growth | 40%–50% YoY | FY24 |
| Rake additions | 3 rakes per year, subject to demand adjustment | Ongoing (six months’ notice) |
| Two additional ICDs | Being finalized along Western DFC strategy | No date |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Profit after tax growth | Over 15% YoY |
| Rail segment revenue per TEU | Improved 11% QoQ, driven by change in volume mix |
| Rail segment TEU volume | ~13% QoQ de-growth |
| Rail export volume | Decline of 15% to 20% YoY |
| Rail import volume | More or less flat, single-digit growth YoY |
| Rail import/export mix | Roughly 60% imports, 40% exports, shifted from 50-50 |
| Rail throughput impact from fog and track work | ~7% to 8% could have been better |
| Rail EBITDA per TEU | Close to ₹9,000 |
| CFS EBITDA per TEU | Around ₹2,200 |
| Blended EBITDA per TEU (excluding other income) | Around ₹5,400 |
| Blended EBITDA per TEU target | ₹6,000, no specific timeline |
| Rail EBITDA per TEU target (with DFC and new terminals) | ₹10,000 |
| Net debt | ₹349 crores as on date |
| Net debt to EBITDA | 2.88, up from 0.67 QoQ (per an analyst's math) |
| Net debt to EBITDA target | Around 1 on an annual basis |
| Market share in NCR | About 16% (9-month basis), grown from 12% about 1–1.5 years ago |
| Market share in Ludhiana | About 35% |
| Pendencies at port | About 3,000–3,500 TEUs lying at port |
| Kashipur ICD volume | ~3,000 TEUs per month, ~36,000 TEUs per annum expected for FY24 |
| Jaipur ICD total project cost | ₹90 crore, ₹30 crore for land, ₹5–10 crore spent already |
| Capex spent in 9 months FY23 | ~₹50 crore |
| Capex expected for remaining FY23 | ~₹20 crore |
| Capex expected for FY24 | ~₹75 crore, excluding two potential new ICDs |
| Rake fleet | 21 owned rakes, 10 leased rakes |
| Snowman ASP | ₹1,521 per pallet per month |
| Snowman ASP increase | 7% YoY |
| Snowman net debt | ₹86.57 crore |
| Snowman debt equity ratio | 0.25% |
| Snowman Trading & Distribution revenue mix | 25% of total revenue in Q3 |
| Snowman Trading & Distribution margin | Jumped from around 4.6% to 7.1% QoQ on net basis (per an analyst's math); sustainable margin expected 5% on average as business scales |
| Snowman Trading & Distribution growth expectation | 40% to 50% YoY in the store distribution model, as things are being set up |
| Snowman BDP partnership expected top line | ₹12 crore per annum |
| Snowman BDP partnership expected margin | 12% |
| Snowman distribution business gross margin | ~10% |
| Snowman distribution business net margin | 4% to 5% |
| Snowman inventory held in cold storages | Close to ₹12,000 crore worth |