Key Takeaways
- Trading sales mask a soft quarter: Revenue fell 9% YoY and EBITDA halved on lower pellet and ferroalloy realizations, while a one-off INR 241 crores coal-hedging settlement inflated the QoQ revenue print.
- Pellet is the margin engine, and it is running hot: Pellet margins are expected to hold near 40% in Q4, and the company is doubling capacity to 0.57 crore tons, betting that a finely balanced global iron ore market keeps prices supported.
- The blast furnace bet is now explicit: Management committed to the blast furnace route for its greenfield steel plant, citing an INR 7,000–8,000/ton structural EBITDA advantage over the DRI route, a conviction that will define the next capex cycle.
- Coal costs are collapsing, providing a tailwind: Sponge iron coal cost has already dropped from ~INR 17,000 to ~INR 13,000/ton and is guided to fall another INR 2,000/ton from Q1, a relief that will flow directly to spreads.
- What to watch next quarter: Whether Q4 profitability actually returns to Q2 levels despite a 1.5-month plant shutdown, the pace of mining approval, and any stabilization in silico manganese export markets.
Pellet: The Core Profit Engine
- Margin structure: Current pellet production cost is ~INR 6,000/ton, comprising INR 3,000 landed mining cost, INR 2,000 conversion/energy cost, and INR 1,000 yield loss from beneficiation to make higher-grade pellets.
- Domestic over export: The company has not yet restarted exports because domestic realizations are substantially better; the delta between domestic and export prices remains wide.
- Captive consumption rising: Pellet sales volume declined ~13% QoQ while production rose ~4% because in-house DRI production was higher, consuming more pellets captively rather than selling into the market.
- Q4 margin guidance: Pellet margin expected to continue at closer to ~40% in Q4, with realization currently around INR 10,000 per ton.
- Global backdrop supportive: Management sees a positive iron ore outlook, citing China's COVID policy shift, property sector revival measures, infrastructure spending, and weather disruptions in Australia and Brazil keeping the demand-supply balance tight.
- Capacity doubling underway: A new 3-million-ton pellet plant has been announced, taking total capacity from 0.27 to 0.57 crore tons; the plant is now being sited at the existing location because land allocation at the new location is delayed.
- Mining to match: Iron ore mining capacity will expand from 0.24 to 0.6 crore tons, with a 6-million-ton beneficiation facility proposed at the mine; combined capex is ~INR 200 crores.
- No ore sales: The company will mine only to meet pellet plant requirements, aiming to elongate mine life rather than sell iron ore into the market.
Agrawal: "We have no intention of selling any iron in the market. We want to elongate the mines life. So we will mine as per the requirement of the pellet plant."
Coal: The Unwinding Tailwind
- Cost decline trajectory: Sponge iron coal consumption cost declined from ~INR 17,000/ton in Q2 to ~INR 16,000/ton in Q3, and further to ~INR 13,000/ton in Q4, as the national coal market started falling post-Diwali.
- Further downside guided: Management expects coal cost to reduce by at least another INR 2,000/ton, reaching ~INR 11,000/ton from Q1 onwards.
- Hedging mechanics: The company undertook coal hedging transactions during the quarter; some contracts were settled, with the settled portion appearing as INR 241 crores of trading sales, while some were taken as physical delivery. Management clarified that economically this is a reduction in raw material cost, not true trading revenue.
Steel & Value-Added Products
- Product mix shift: Sponge iron and rolled product sales volumes fell 55% and 67% YoY respectively because the company sold partially finished steel billet and rolled products, shifting its product mix.
- Shutdown impact: A 4–5 week maintenance shutdown is underway, with sponge iron to finished steel value-added facilities shut for ~1.5 months; earnings from these facilities will go into fixed cost and maintenance during this period.
- Q4 profitability call: Despite the shutdown, Q4 profitability is expected to be higher than Q3 because the positive delta from the pellet business will outweigh the negative impact from value-added facility closures, and could return to Q2 levels depending on average realization.
- Price recovery: Sponge iron and value-added product prices have already improved to Q2 levels after falling in Q3.
- Domestic demand strong: Government budget increased capital outlay 33% and railway outlay 75%, which management sees as positive for steel demand, especially long steel products.
- Steel billet expansion: Capacity is being increased from 4 lakh tons to 5 lakh tons, with commissioning expected by September, coinciding with new furnaces.
- Rolling mill modernization: One existing rolling mill will be modernized to manufacture steel structural and strip mill products, serving as backward integration to fabrication, galvanizing, and ERW pipe capacity.
Gandhi: "Although this will have a negative impact, but overall, it will be positive, and profitability is expected to be higher than the last part that is Q3 and Q4."
Ferroalloys: Normalization, Not Collapse
- Price reset: Silico manganese prices have fallen to ~INR 75,000/ton from over INR 1 lakh/ton last year; management considers INR 5,000/ton EBITDA as a normalized long-term average, framing last year's pricing as an exceptional COVID-phase one-off.
- Export market subdued: The Middle East and Europe are not big markets for India currently; high energy prices post-war have taken European steel capacity out of production, reducing ferroalloys consumption and forcing India to export more, which oversupplies the domestic market.
- Q4 margin guidance: Ferroalloys margin expected at 18% to 20% in Q4.
- No volume growth: Production is running at rated capacity and no expansion is planned, so volume growth is not expected.
- Supply-side silver lining: Capacities are going out of production in high-energy markets like Africa and Europe, while raw material costs have also declined, offering some offset to price pressure.
Agrawal: "A lot of capacities of ferroalloys is going out of production, especially in higher energy markets like Africa, Europe, because ferroalloys is a lot of power. At the same time, the raw material cost has gone down compared to last year. So there's only silver lining, right?"
The Greenfield Bet: Blast Furnace Conviction
- Route decision final: Management is unequivocal that the 0.1 crore ton greenfield steel plant will use the blast furnace route, not DRI, citing an INR 7,000–8,000/ton additional EBITDA advantage over DRI based on long-term averages.
- Coking coal view: Management believes coking coal prices will stabilize going forward in the long term, underpinning the blast furnace economics.
- Project status: The project is still awaiting land acquisition, environmental approval, and water allocation; final plant configuration and product mix are still being worked out, and capex will be announced only after approvals.
- Funding philosophy: Capex will be funded through internal generation with minimal debt; no buyback is planned because cash must be conserved for the capacity expansion project.
Agrawal: "We are very clear, we will be going with the blast furnace route. We have no intention of setting up another 0.1 crore plant to DRI route."
Capex, Approvals & Timeline
- Run-rate capex: Annual capex of ~INR 500 crores is expected to continue for the next 2–3 years, covering the new mining and pellet capacity build-out.
- FY24 specifics: Balance capex on current pipeline projects is no more than INR 250–300 crores; mining capex of ~INR 200 crores will start once approval is received; advance for the new pellet plant order will be placed once approval is in place, with a 6–8 month time lag before cash outflows ramp.
- Mining approval timeline: Environment clearance has been applied for; permission is expected in Q2 or early Q3 of FY24, with mining activities starting immediately upon receipt.
- Pellet plant timeline: Total 36 months: 10–12 months for MoEF and State Pollution Board approvals, then 24 months of groundwork. TOR has already been filed; groundwork is expected to start by end of Q3 next financial year.
- Existing location saturation: After the additional 0.3 crore ton pellet plant, there will be no more scope for new capex at the existing location except maintenance; everything else will go to new locations.
- Solar power savings: Additional solar capacities are expected to save INR 3 per unit of power generation, with the plant operating at about 15% capacity utilization.
- Mining sequence: Ari Dongri mines will be the initial focus for expansion; Boria Tibbu will be used later when Ari Dongri volumes decline, keeping costs lower by focusing on one location at a time.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Pellet margin | Closer to ~40% | Q4 FY23 |
| Ferroalloys margin | 18% to 20% | Q4 FY23 |
| Q4 profitability | Higher than Q3, possibly back to Q2 levels | Q4 FY23 |
| Coal cost | Further reduction of at least INR 2,000/ton, reaching ~INR 11,000/ton | Q1 FY24 onwards |
| FY23 pellet production | 0.26 crore tons; Q4 at ~700,000 tons (+/- 20,000–25,000 tons) | FY23 |
| Mining environment clearance | Permission expected | Q2 or early Q3 FY24 |
| Steel billet expansion commissioning | 400,000 to 500,000 tons | September 2023 |
| New pellet plant groundwork start | End of Q3 next financial year (November/December) | FY24 |
| New pellet plant completion | Within 3 years from now | FY26 |
| Annual capex run-rate | ~INR 500 crores | Next 2–3 years |
| FY24 capex (current pipeline) | No more than INR 250–300 crores | FY24 |
| Dividend payout | 10–15% as per stated policy | Ongoing |
| Greenfield steel plant capex | To be announced post approvals | Undated |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Consolidated revenue | ₹1,463 cr, up 12% QoQ, down 9% YoY |
| Consolidated revenue (excl. trading) | ₹1,222 cr |
| Trading sales | ₹241 cr, one-time coal hedging settlement; normal annual trading sales are ₹40–50 cr |
| Consolidated EBITDA | ₹173 cr, down 25% QoQ, down 55% YoY |
| Net cash | ₹600 cr as of December |
| Pellet margin | ₹2,000–2,500 per ton in Q3 |
| Pellet margin outlook | ~40% expected in Q4 |
| Ferroalloys margin | 18% to 20% |
| Iron ore pellet production growth | +2% YoY |
| Steel billet production growth | +80% YoY |
| HB wires production growth | +306% YoY |
| Galvanized fabricated products production growth | +22% YoY |
| Pellet sales volume growth | +9% YoY |
| Steel billet sales volume growth | +321% YoY |
| Sponge iron sales volume change | -55% YoY |
| Rolled product sales volume change | -67% YoY |
| Sponge iron plant utilization | >98%; shutdown announced for Q4 |
| Captive iron ore landed cost | ~₹3,000 per ton vs market price of ₹5,500 per ton |
| Sponge iron coal consumption cost | ~₹16,000 per ton in Q3, down from ~₹17,000 in Q2; current Q4 at ~₹13,000 |
| Pellet production guidance FY23 | 0.26 crore tons; 0.19 crore tons produced in 9M |
| Q4 pellet production expected | ~700,000 tons |
| Q4 sponge iron volume expected | ~60,000 tons (shutdown-impacted) |
| Silico manganese selling price | ~₹75,000 per ton; last year was >₹1 lakh per ton |
| Global iron ore price | Rose from $78 per ton (late 2022) to $120 per ton currently |
| Normal good pellet price | ~₹10,000 per ton; also stated as ₹8,000 for normal, ₹11,000 for high-grade |
| Sponge iron price | ₹32,500 per ton |
| Steel billet price | ₹48,000 per ton |
| Wire price | Above ₹50,000 per ton |
| Iron ore mining capacity expansion | From 0.24 crore tons to 0.6 crore tons; capex ~₹200 cr combined with beneficiation |
| Pellet capacity expansion | From 0.27 crore tons to 0.57 crore tons; capex ~₹100 cr |
| Steel billet capacity increase | From 4 lakh tons to 5 lakh tons |
| Solar power commissioned | 70 MW at Rajnandgaon; 30 MW for mine by June, 60 MW for Hira Ferro by March 2023 |
| FY24 capex requirement | Not more than ₹250–300 cr on current pipeline projects |
| Dividend policy | 10% to 15% of profits; no buyback planned |