Key Takeaways
- A quarter of operational friction, not structural damage: Pellet sales fell as an export shipment slipped into Q4 and new merchant capacity in Raipur created a local glut, compressing realizations. The miss is a timing and inventory story, not a demand story.
- The big capex pivot is now explicit: The 0.2 crore ton greenfield steel plant and the OPVC pipe project are both dead, killed by a miscalculated capex estimate and Chinese competition respectively. A smaller, lower-capex steel plant is being evaluated.
- The pellet growth engine is intact and on schedule: The 0.2 crore ton pellet plant expansion is on track for trial production by early Q2 FY26, with full volumes expected by Q4 FY26 at the latest. The Ari Dongri mining EC is the gating item, expected by Q1 FY26.
- FY26 is a transition year, FY27 is the payoff: Management guided for only a modest EBITDA improvement in FY26 as the new pellet plant ramps up, but pointed to a bare minimum of INR500-800 crores of additional EBITDA in FY27 from the full pellet and mining capacity.
- What to watch next quarter: Whether the Ari Dongri public hearing is announced and proceeds smoothly, the pace of the remaining INR432 crores in capex spend, and any concrete announcement on the revised steel plant capacity and capex.
The Q3 Miss: Pellet Glut and a Slipped Shipment
- Export timing shift: A pellet export consignment moved from Q3 to Q4, mechanically reducing Q3 sales volumes and leaving about 1 lakh tons of inventory on the books at quarter-end. That inventory, plus the Q4 vessel, will both be sold in Q4, pulling that revenue and EBITDA forward into the next quarter.
- Raipur oversupply hit realizations: New merchant pellet plants commissioned in the Raipur area created a local supply overhang post-Diwali, when steel demand was already sluggish. The company was forced to export a vessel to clear inventory, and export realizations run about INR1,000/ton below domestic net levels.
- Product mix masked HB wire strength: Sales of sponge iron, billets and MS round declined YoY, but that was a deliberate shift: the company increased production of HB wires, where sales grew significantly on both a quarterly and 9-month basis. Ferro alloys also grew.
- Inventory is now normalized: Pellet inventory dropped from roughly 1 lakh tons to below 20,000 tons after the export vessel sailed, so the carrying cost overhang is gone heading into Q4.
- The demand thesis is not broken: Management noted that 90-95% of its pellet buyers are coal-based DRI operators, not blast furnaces, so the decline was not driven by coking coal price dynamics. The company's high-grade, low-alumina, low-phosphorus pellets continue to command the same premium as before.
Abhishek Agrawal: "There may be some certain probably impact on the pricing. But in the longer term, we don't see any challenge because our mines should be fully operational by then. So our input cost and our operating costs will be very healthy. So we will always keep making money."
The Capex Reset: Two Projects Dropped, One Reborn
- 0.2 crore ton steel plant scrapped: The project was killed because the initial capex estimate was wrong. Management had assumed a 60:40 split between equipment and infrastructure cost; the reality was the reverse, pushing the total from INR6,000 crores to a minimum of INR8,000 crores. The company is now evaluating a smaller plant of 0.08 to 0.1 crore tons with a lower capex burden.
- OPVC pipe project abandoned: Chinese technology and a flood of new entrants erased any first-mover advantage. Management concluded the market had become commoditized before the company could even enter.
- Flat products pivot: The HRC project is completely dropped. The company is now exploring other flat products like heavy structures and beams, alongside its traditional long products. An announcement will come once a project is finalized.
- Debt discipline is the binding constraint: The decision to walk away from the larger steel plant was explicitly framed around avoiding a return to the debt cycle the company endured a decade ago. The smaller plant is being designed to fit within that risk appetite.
Abhishek Agrawal: "The capex we envisage initially, we got it wrong. So usually what happens, we thought 60% is equipment cost and 40% will be the intra cost. But what has happened is it is opposite. So 40% is your equipment cost 60% is your intra cost."
Abhishek Agrawal: "We don't want to go back into the same debt cycle, which we had entered last 10 years back."
The Growth Engine: Pellet Expansion and Mining EC
- Pellet plant timeline: The capacity expansion from 0.27 to 0.47 crore tons is on track. Trial production is expected by early Q2 FY26, with the full INR432 crores of remaining capex spent over the next four months (Q4 FY25 and Q1 FY26). Ramp-up to full utilization is expected within 3 to 6 months, putting full volumes at end-Q3 or mid-Q3 FY26, with a worst-case of Q4 FY26.
- Ari Dongri mining EC is the critical path: The company expects the public hearing to be announced in the next couple of weeks, to take place post-Holi around end-March, with the EC granted a couple of months after that, by Q1 FY26. The IBM accepted the proposal last week. Once EC is in hand, the remaining 0.09 crore tons of BMQ beneficiation capacity will take about 6 months to commission.
- Iron ore bridge strategy: Current captive mines cover 70-75% of requirements. The company buys about 6 lakh tons annually from the market. For the new pellet plant's trial production, it will buy iron ore from the market during a temporary 3-4 month shortfall. Once mining capacity is fully expanded, all current market purchases plus the additional requirement become captive.
- Boria Tibu restart and beneficiation: Mining has restarted at the Boria Tibu captive mine (0.07 crore tons per annum). Since there is no beneficiation plant at Boria Tibu yet, the company created a circuit at Godawari to beneficiate the low-grade ore (about 55 Fe average).
- GAIL agreement for natural gas: The company signed a 7-year agreement with GAIL for supply of electrified natural gas for the upcoming pellet plant. Management indicated it might eventually convert all three pellet plants to natural gas, with an eye on CBAM compliance for exports to Europe starting January 2026. However, management was explicit that there is no commercial margin benefit from switching, only strategic export readiness.
Abhishek Agrawal: "The only reason is going forward with so much of capacity, if we have to export. So we're looking at -- if you look at the Europe market, the CBAM will be in place from January '26, right? In all those scenarios, we want to start natural gas."
FY26 and FY27: The Earnings Bridge
- FY26 is a transition year: Management guided for total pellet production of about 0.3 to 0.32 crore tons (0.24-0.25 from existing capacity plus 0.05-0.06 from the new plant). EBITDA is expected to show "not much improvement" compared to FY25, as the new plant ramps up and the full benefit of captive mining is not yet online.
- FY27 is the payoff year: Management pointed to a bare minimum of INR500-800 crores of additional EBITDA in FY27, with close to INR600 crores coming from the pellet plant alone at current market scenarios. Full pellet capacity of 0.4-0.45 crore tons is expected. This guidance was caveated as "very assumption-based" given commodity market uncertainty 15 months out.
- Capex trajectory: FY26 capex is pegged at roughly INR1,000-1,100 crores for mining, beneficiation, the pellet plant, and solar. FY27 will see major expansion spending from the revised steel plant, with a ballpark range of INR3,000-4,500 crores depending on the final capacity decision.
- Steel plant strategic logic: The long-term strategy is to hedge pellet exposure by converting additional pellets into captive steelmaking. Management was definitive that a steel plant will happen, but needs more time for a complete plan and concrete capex number.
Other Updates
- Jammu Pigments acquisition: The company acquired a 49% stake in Jammu Pigments Limited on a fully diluted basis as of December 31, 2024. As of December 2024, 21.46% had been acquired and was treated as a joint venture, with only the share of profit considered. The acquisition closed on November 20, 2024.
- Power Grid qualification: The company is now eligible to supply steel blades to all manufacturers of galvanized steel structures for Power Grid Corporation transmission projects.
- RR ISPAT mill: The new mill has been commissioned. Once fully operational, 50% of output will be structured products and 50% will be wire rods.
- ESG rating: CARE assigned a CareEdge ESG III rating with a score of 51, the company's first ESG rating.
- Maintenance shutdowns: A big annual shutdown was taken during the monsoon, with small 3-4 day shutdowns for specific maintenance. Management confirmed these do not impact yearly volume and that production guidance is on track.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Pellet plant trial production | New 0.2 crore ton plant begins trials | Early Q2 FY26 |
| Pellet plant full utilization | 0.4-0.45 crore tons total capacity at full run-rate | End-Q3 to Q4 FY26 (worst case) |
| Ari Dongri mining EC | Expansion from 0.24 to 0.6 crore tons approved | Q1 FY26 |
| Remaining beneficiation capacity | 0.09 crore tons of BMQ beneficiation commissioned | ~6 months after EC grant |
| FY25 production guidance | 0.24 crore tons production and sales volume | FY25 (unchanged) |
| FY26 pellet production | 0.3-0.32 crore tons total | FY26 |
| FY26 EBITDA | "Not much improvement" vs FY25 | FY26 |
| FY27 additional EBITDA | Bare minimum INR500-800 crores, ~INR600 crores from pellet plant | FY27 |
| FY26 capex | INR1,000-1,100 crores (mining, beneficiation, pellet, solar) | FY26 |
| Remaining pellet plant capex | INR432 crores spent | Next 4 months (Q4 FY25 + Q1 FY26) |
| Steel plant announcement | Smaller capacity (0.08-0.1 crore tons), lower capex | "In due course" (no date) |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Consolidated revenue (9M) | ₹3,908 cr, flat YoY |
| EBITDA margin | 22% |
| PAT margin | 15% |
| Net cash balance | ₹725 cr |
| Pellet realization (9M) | ₹10,387/ton, +2% YoY |
| Other products realization (9M) | Down 3% to 8% YoY |
| FY25 production achievement (9M) | Iron ore mining 69%, pellets 73%, sponge iron 84%, ferro alloys 96% of full-year guidance |
| Pellet sales volume | 3 lakh tons, down YoY; 50,000 tons exported |
| Pellet inventory | Below 20,000 tons, down from ~1 lakh tons at quarter-end |
| Pellet cost and margin (ex-plant) | Cost ~₹6,000/ton, ASP ~₹10,000/ton, margin ~₹4,000/ton |
| Steel segment margin (sponge to finished) | ₹5 to ₹7 per unit, inclusive of infra and power cost |
| External iron ore purchases (annual) | ~6 lakh tons, representing 25-30% of requirement |
| Pellet capacity expansion capex balance | ₹432 cr, to be spent over next 4 months |
| FY26 capex guidance | ₹1,000 cr to ₹1,100 cr |
| FY27 EBITDA expectation (current market scenario) | ₹500 cr to ₹800 cr bare minimum; additional ~₹600 cr from new pellet plant |