Key Takeaways
- Logistics shock, margin surprise: Revenue fell 2% YoY to INR758 crores on a 7% volume drop from Red Sea disruption, yet EBITDA margin jumped to 12% from 9% as the company deliberately avoided low-margin tolling business.
- Lead per-ton profit spiked artificially: Lead operating profit hit INR23 per kg versus a normalized INR18-19, purely because lower-margin volumes were cut during the disruption; this is explicitly not sustainable.
- Non-lead verticals are the problem child: Aluminum and plastic businesses have not delivered expected profits, pushing the company "a little off mark" of its 35% bottom-line CAGR target for Vision 2027.
- Capex timeline is slipping: The FY24 capacity target of 3,24,000 metric tons will be missed by March and may only be reached by April or May; deferred capex rolls into next year.
- What to watch next quarter: Whether logistics normalize by April as promised, whether aluminum EBITDA per kg recovers toward INR10-11, and whether finished goods inventory of ~INR690 crores actually liquidates.
Red Sea Disruption: Impact & Mitigation
- Volume hit concentrated in exports: Dispatches from overseas plants to Europe and exports from the Mundra plant were disrupted, driving a 7% sales volume drop. Aluminum fell to 3,264 tons and plastic to 2,458 tons, while lead volume actually rose 2% QoQ to 34,488 tons.
- Revenue impact quantified late: Management initially avoided giving a figure, then stated approximately INR100-120 crores of revenue impact from the disruption.
- Production kept running: Production increased 17% YoY even as sales volumes dropped, inflating finished goods inventory to ~INR690 crores. Management expects this stock to be diluted "this quarter probably or, otherwise, at the max next quarter."
- Mitigation is a geographic shuffle: The company is diverting material to India and other markets (Asia, US), selling wherever net realization is highest. Diverting into India has already impacted the bottom line because some material is in transit.
- Freight costs are a known unknown: Freight costs have gone 7 to 8x, and management explicitly admitted "we don't know whether freight will increase or not" when asked about Q4. In the longer term, either premiums to European markets will drop or raw material prices will adjust to compensate.
Yogesh Malhotra: "if the freight remains high to go into Europe, then we'll probably not sell enough in Europe and we'll sell to some other geographies, maybe Asia or maybe the US or things like that"
Margin Mechanics: The Tolling Trade-Off
- Higher per-ton EBITDA is a volume sacrifice story: When volumes are constrained, the company cuts the lowest-margin business first, specifically tolling arrangements. This lifts per-ton EBITDA but reduces absolute volume, a trade-off management calls "not a normal situation."
- Lead per-ton profit at INR23 is temporary: The normalized range is INR18-19 per kg. Management expects a return to normal once logistics disruption resolves and volumes recover.
- Aluminum margin pressure is structural, not just logistical: Aluminum EBITDA per ton dropped because the company cannot hedge aluminum alloy (no hedging solution exists), so price fluctuations flow straight to the bottom line. Freight cost increases added further pressure.
- Aluminum hedging is in the works but delayed: Discussions with MCX in India are ongoing to set up a hedging mechanism, with an expected timeline of "probably by first quarter next year." Management admits "it is taking a little longer because it is something that is totally new to the exchanges."
- Commodity hedging reclassified: INR18.8 crores of commodity and currency hedging for nine months was reclassified from other income to operational income; INR20 crores of commodity hedging gains for the quarter is now part of revenue.
Sunil Kansal: "when this kind of situation is there when we are not able to increase the volume, so the lower margin business, which is where -- like the tooling business, where we get to slightly lower per ton EBITDA, so we avoid to do that kind of business. And at that point in time, overall per ton EBITDA improves, but with the lower volumes."
Non-Lead Verticals: The Vision 2027 Gap
- The 35% bottom-line CAGR is off track: Management conceded they are "a little off mark" of the Vision 2027 profitability target, attributing the shortfall to aluminum and plastic businesses not delivering expected profits.
- Aluminum recovery is promised but unproven: Management expects some recovery from next quarter onwards, targeting INR10-11 per kg EBITDA in the shorter term and a return to INR16-17 per kg longer term. Prices have now stabilized and management does not see them going down from current levels.
- Plastic is a segregation problem, not a demand problem: EPR implementation has been slower than expected, and the core challenge is technical: "no two materials are the same," making segregation and production of useful output a trial-intensive process for OEM suitability. Management sees changes happening now on the field.
- Plastic tolling shift underway: The company is moving toward more tolling arrangements with OEMs, where it processes waste material from factories and returns it, insulating the business from raw material price volatility.
- Non-lead ambition remains intact: Target is to bring lead contribution below 75%, with 25%-plus from non-lead. Plastic is expected to grow fastest, aluminum faster than lead, with rubber, paper, steel, and lithium-ion battery recycling contributing later.
Yogesh Malhotra: "We are getting a lot of materials also available, but in plastic, generally, no two materials are the same. So we are getting a lot of challenges in terms of how to segregate those materials and how to make something useful out of those materials."
Capacity Expansion & Capex
- Capacity target for FY24 will be missed: The target of 3,24,000 metric tons (including rubber) may not be met by March end, but should be reached by April or May. Leftover capex from FY24 will be carried forward to next year.
- Vision 2026 capacity goal: 4.25 lakh metric tons per annum, backed by ~INR600 crores of capex (INR400 crores for existing verticals, INR200 crores for new verticals).
- New vertical capex is gated on supply chain readiness: Management will only put up a plant when 100% confident of having sourcing arrangements for raw material. New verticals like lithium-ion and paper recycling require more studies and robust supply chain establishment before spending.
- Tanzania plastic plant live: A step-down subsidiary started commercial production of recycled PP granules with annual capacity of ~1,800 metric tons, targeting plastic manufacturers in Europe and Asia.
- Oman JV progressing: Land allocated by the Oman government, environmental study submitted, awaiting clearance. First stage will recycle lead, plastic, and aluminum.
New Verticals & Inorganic Opportunities
- Lithium-ion is years away: A technical team is in China evaluating options for a pilot project at Mundra, with "some action by quarter one of next year." But management is explicit: "it may take five to six years for actual volume to come into recycling for lithium-ion."
- Steel is further out: Steel is "a little further away in terms of implementation of a new vertical."
- Rubber currently captive only: Current tyre recycling feeds into lead and aluminum margins; new tyre plants will show a separate vertical line.
- Solar panel recycling not on the radar: Management is not looking at solar currently, citing a panel life of ~25 years and insufficient volume.
- M&A appetite is selective: Management will not acquire in existing verticals but is open to taking over a lithium-ion battery recycling plant or a paper plant.
- Turnkey solution is an R&D tool: Currently limited to lead and aluminum recycling plants and some plastic products; it helps improve operational efficiencies by enabling faster, cheaper plant setup versus competitors.
Yogesh Malhotra: "it's premature to talk about lithium-ion recycling currently because it may take five to six years for actual volume to come into recycling for lithium-ion"
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Logistics disruption resolution | Red Sea disruption over, volumes normalize | By current quarter end or latest by April end |
| Finished goods liquidation | ~INR690 cr inventory diluted | This quarter or max next quarter |
| Aluminum EBITDA recovery | Per kg EBITDA to INR10-11 (shorter term), then INR16-17 (longer term) | Recovery starting next quarter; hedging by Q1 next year |
| FY24 capacity target | 3,24,000 metric tons (including rubber) | April or May 2024 (missed March target) |
| Vision 2026 capacity | 4.25 lakh metric tons per annum | By FY26 |
| Vision 2026 capex | ~INR600 cr (INR400 cr existing, INR200 cr new verticals) | By FY26 |
| Lithium-ion pilot project | Pilot at Mundra | Some action by Q1 next year |
| Non-lead revenue share | 25%-plus from non-lead businesses | Vision 2027 timeframe |
| Bottom-line recovery from EPR, aluminum, plastic | Impact visible | If not next quarter, definitely by Q1 next year |
Key Metrics
| Metric | Q3 FY24 |
|---|---|
| Revenue | ₹758 cr, down 2% YoY; logistics disruption offset by increased realizations |
| Adjusted EBITDA | ₹90 cr, up 26% YoY and 11% QoQ |
| EBITDA margin | 12%, compared to 9% in Q3 FY23 |
| Consolidated PAT | ₹60 cr, up 20% YoY and 4% QoQ |
| PAT margin | 8%, steady |
| 9M FY24 consolidated revenue | ₹2,297 cr, up 12% YoY |
| 9M FY24 adjusted EBITDA | ₹238 cr, up 19% YoY |
| 9M FY24 consolidated PAT | ₹170 cr, up 24% YoY |
| 9M FY24 PAT margin | 7.4% |
| Revenue share from value-added products (9M FY24) | 47%, in line with vision of 50% |
| Lead volume | 34,488 tons, up 2% QoQ |
| Aluminum volume | 3,264 tons, dropped QoQ |
| Plastic volume | 2,458 tons, dropped QoQ |
| Sales volume change | Down 7% YoY, due to logistics disruption |
| Production change | Up 17% YoY |
| Lead operating profit per kg | ₹23, above normalized range of ₹18–19 due to mix shift and arbitrage |
| Aluminum EBITDA per kg | Approximately ₹0, expected to recover to ₹10–11 in shorter term and ₹16–17 longer term |
| Closing inventory | Approximately ₹690 cr, elevated due to finished goods and goods in transit |
| Order book | ~60,000 tons, includes long-term and short-term contracts |
| Total capacity | 2.86 lakh MTPA as of 23 Jan 2024, vs 2.33 lakh MTPA on 31 Mar 2023 |
| Lead capacity | 231,000 MTPA |
| Domestic sourcing percentage (Indian plants) | Approximately 36% |
| International sales share | 45%, down from historical 50–55% due to logistics disruption |
| Non-lead business proportion | 12–13% |
| Commodity hedging gains (quarter) | Approximately ₹20 cr, part of revenue |
| Capex spent in 9M FY24 | ₹78 cr, of which ~₹10 cr for new verticals (rubber) |
| Revenue impact from logistics disruption | Approximately ₹100–120 cr (per an analyst's math) |