Key Takeaways
- Soft quarter, confident tone: Q2 volumes grew just 7% YoY as a planned plant shutdown and extended monsoons suppressed dispatches, yet management reaffirmed 30% full-year volume growth with "100%" confidence.
- Shutdown, not demand, drove the EBITDA dip: The ₹400/ton decline in blended EBITDA was pinned on fixed costs absorbed during an ISP maintenance shutdown that expanded beyond its original 5-day scope.
- A mega project MOU, but no funding blueprint: Hariom signed an MOU with the Maharashtra government for a ₹3,135 crore integrated steel plant in Gadchiroli, a project more than double its current market cap, with management promising a "fantastic and leveraged" funding plan but offering no specifics.
- Margins are the strategic bet: Management is pivoting toward B2B, OEM supply, and value-added products to lift margins, while operating leverage from existing capacity should lower per-ton costs as volumes rise.
- What to watch next quarter: Whether the promised H2 volume surge materializes to close the gap on the 30% full-year target, any concrete funding details for the Gadchiroli project, and progress on solar power plant land acquisition.
The Q2 Softness: Shutdown & Monsoon, Not Demand
- Planned maintenance, unplanned scope: A preventive maintenance shutdown at the ISP plant was expected to have minimal impact, but opening the equipment revealed additional work that had to be completed, extending the effective downtime and its fixed-cost burden.
- Monsoons delayed dispatches: Extended heavy rainfall across key markets suppressed offtake and dispatches during the quarter, a temporary dampener management expects to reverse as replacement demand kicks in.
- Underlying growth intact: Despite the headwinds, Q2 still delivered 7% YoY volume and value growth, and H1 FY26 closed at 21% YoY growth in both volume and revenue, with all units now running on demand momentum.
- EBITDA per ton walk: The ₹400/ton decline in blended EBITDA (from ₹7,564 to ₹7,103) was primarily the shutdown effect: fixed costs for electricity, salaries and maintenance continued during downtime, hitting EBITDA by an estimated ₹300–₹400 per ton.
Bhattacharya: "The difference is of INR400. That is not because of softness of demand or anything. It was due to that plant shutdown."
Volume Growth: The 30% Bet
- Full-year confidence reaffirmed: Management stated it is "100%" confident of achieving 30% volume growth for FY26, citing upcoming demand, government policies, OEM expansion, dealer networking and branding efforts.
- H2 demand drivers: Replacement demand from monsoon-damaged infrastructure, government infrastructure spending (railways, metros, roads), real estate activity restarting post-monsoon, and Safeguard Duty benefits are all expected to pull volumes higher in the second half.
- Capacity headroom exists: The company is running at ~60% of installed capacity, with maximum achievable utilization across all products at 70%–75% because sponge iron, MS billets and HR strips are captively consumed, not sold.
- Operating leverage tailwind: No new capacity is being added, so fixed costs stay flat; as volumes improve, cost per ton will decline because fixed costs get spread over more production.
- 30%–35% volume growth guidance extends two years: Management expects existing capacity to reach optimum utilization by next year, supporting a 30%–35% volume growth trajectory over a two-year horizon.
Gupta: "we are very much positive and 100% we feel that it will happen."
Margins & Product Mix: The Profit-First Pivot
- Value-added dominance: 97% of sales are value-added products, and 65% of those go to niche markets (low-thickness pipe for construction, fabrication, interior, furniture) where competition is thinner and margins are better.
- OEM strategy deepens: Hariom now supplies GT coils to Kirby, Pannar and Midhani, and pipes for electric bus manufacturing; OEM due diligence takes six months to a year, creating a moat once relationships are established.
- B2B and OEM to lift margins: Management expects EBITDA margins to remain stable with no major fluctuation, similar to the past 4–5 years, and to improve as B2B and OEM segments grow their share of the mix.
- Competitive positioning: Hariom's product mix (low-thickness pipe) yields better margins than general high-thickness volume pipes; management claims the company is ahead of industry peers in EBITDA percentage and profit margin.
- Solar segment adds a new leg: A new solar accessories business (supplying supporting structures to EPC contractors) and trading of HRC/HRPO coils drove a 4x jump in purchase of stock in trade; demand is described as "huge" but customer targeting remains selective.
Gupta: "We want to get away from the niche markets where there is competition. So, from the start and going forward, Hariom's focus will be on profit only."
The Gadchiroli Project: Ambition Meets Questions
- MOU signed, incentives secured: Hariom signed an MOU with the Government of Maharashtra to set up a 0.15 crore ton per annum integrated steel plant at Gadchiroli under the state's mega project policy, with substantial fiscal incentives including GST reimbursements and power tariff support.
- Scale vs. balance sheet: The project carries a ₹3,135 crore price tag, more than double the company's current market cap; management acknowledged this is "not practical" to fund all at once and promised a phased, "fantastic and leveraged" approach, but provided no specific funding details.
- Phased execution over 8 years: The plant will start with ₹300–₹400 crores of investment, generate revenue from that phase, then deploy more CapEx; the full project will be completed over 8 years in a phased manner, with flow starting after 2028.
- No major equity dilution expected: Management stated it does not expect any major equity dilution or large increase in debt at this stage, as the project will benefit meaningfully from mega project policy incentives.
- Near-term CapEx focus is elsewhere: For the next 18 months, the priority is fully setting out existing assets and finalizing land, documents and clearances for the new project, not starting major CapEx.
Gupta: "It is not one stage that I have a market cap of INR2,000 crores and I will invest INR3,000 crores there. This is not practical as a businessman no one can do this."
Solar Power: A Parallel Infrastructure Play
- PM Kusum scheme anchor: Hariom is developing a 60 MWh solar power plant across 13 locations under the PM Kusum Subsidy scheme, with a 25-year power tariff contract to supply MSEDCL; one location is already completed and generating revenue.
- Land acquisition progressing: 56 acres of the required 210 acres are already under long-term lease deed, with the balance ~150 acres to be acquired; management expects to finalize land by end of January or February (year unspecified).
- Funding structure de-risked: The central government capital subsidy under PM Kusum means the company's equity investment will be fully reimbursed; no equity dilution or heavy debt load is expected for this project.
- Revenue timeline: Power supply to MSEDCL starts from September 2028 per the contract, though earlier generation is possible; each location takes approximately 2.5 months from land acquisition completion to revenue generation.
Balance Sheet & Financial Health
- Leverage comfortable: Debt-to-equity stands at 0.65x, with management indicating not much more debt is required and the company will stay within its present consolidation range.
- Returns profile: ROCE at 21% and ROE at 11%, with operating cash flow of ₹40 crore reflecting healthy EBITDA-to-cash conversion.
- Depreciation step-up explained: Depreciation rose QoQ because the Ultra Pipes acquisition contributed only 1 month in Q1 versus 3 months in Q2, and most CWIP was completed and capitalized.
- Interest includes a one-off: Interest expense included a ~₹1 crore one-off from an EIR concept (IndAS adjustment) when SBI took over Canada Bank on 26 September.
- No major CapEx for two years: For FY26 and FY27, only routine maintenance CapEx of 10%–15% of gross block is planned; the focus is on sweating existing assets.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Full-year volume growth | 30% volume growth for FY26 | FY26 |
| Two-year volume growth | 30%–35% volume growth | Next 2 years |
| Revenue CAGR | 30% CAGR to continue | Next 2–3 years |
| Capacity utilization | Existing capacity utilized at optimum level | By next year |
| EBITDA margins | Remain stable with no major fluctuation; improve as B2B/OEM mix grows | Ongoing |
| OpEx growth | Single-digit growth; no major increase expected | Coming quarters |
| Major CapEx | No major CapEx; only routine maintenance at 10%–15% of gross block | FY26 and FY27 |
| Gadchiroli steel plant | First phase of ₹300–₹400 crores; full project in 8 years | Flow starts after 2028 |
| Solar power supply to MSEDCL | 60 MWh across 13 locations under 25-year PPA | From September 2028 |
| Solar land acquisition | Balance ~150 acres to be acquired | By end of January or February (year unspecified) |
| Equity dilution | No major equity dilution expected for Gadchiroli or solar projects | Project duration |
| Debt | Not much more debt required; within present consolidation range | Ongoing |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue from operations (H1 FY26) | ₹797 cr, +21% YoY |
| Sales volume (H1 FY26) | 1.38 lakh metric tonnes, +21% YoY |
| Q2 volume growth | 7% YoY |
| Q2 value growth | 7% YoY |
| Value-added products share | 97% of total sales |
| EBITDA margin | 12.6% |
| EBITDA (H1 FY26) | ₹100 cr, stable YoY |
| PAT (H1 FY26) | ₹34 cr, stable YoY |
| Blended EBITDA per tonne | ₹7,103, down from ₹7,564 in Q2 FY25, a difference of ~₹400 per tonne |
| MS steel / MS tubes EBITDA per tonne | ₹8,200 |
| GP pipe and coil EBITDA per tonne | ~₹7,000 |
| Scaffolding EBITDA per tonne | ₹11,300 |
| Average realization | ₹55,839 |
| GP pipe and coil realization | ~₹61,000 |
| MS tubes realization | ~₹49,000 |
| Scaffolding realization | ~₹64,000 |
| Debt-to-equity ratio | 0.65x |
| ROCE | 21% |
| ROE | 11% |
| Operating cash flow | ₹40 cr |
| Capacity utilization | ~60% of installed capacity |
| B2B sales mix | 20% in H1 FY26, up from 15% in FY25 |
| Full-year volume growth guidance | 30%, maintained |
| Maintenance CapEx | 10% to 15% of gross block |
| Solar power project total cost | ₹200 to ₹220 cr after completion |
| Maharashtra steel plant MOU value | ₹3,135 cr, phased over ~8 years |