Key Takeaways
- Resilient margins in a tough electrode cycle: HEG held EBITDA margins at 15%-17% despite sustained pricing pressure, leaning on its claim as the world's lowest-cost producer while Chinese oversupply continues to weigh on the market.
- Demerger is the central value-unlock story: The separation of the graphite electrode and green/anode businesses is now targeted for completion by end of 2025, with management betting the anode entity will command a fundamentally different, higher multiple.
- Anode plant is real, scaled up, and on the clock: Construction has started on a 20,000-ton plant in Dewas, capex is pegged at ₹1,700-1,750 crores, and the target for full operations is September 2026, though government power-tariff incentives remain unresolved.
- A contrarian bet on the cycle via GrafTech: HEG deployed treasury cash into a 10%+ stake in GrafTech, a higher-cost competitor with 2x electrode capacity and 70% needle-coke backward integration, framing it as a leveraged play on a sector recovery.
- What to watch next quarter: Whether Western peers' announced 15%-20% price increases actually stick in the market, any progress on anode-plant power-tariff negotiations, and the pace of SEBI's demerger approval process.
Graphite Electrode Market & Pricing
- Pricing still under pressure: Electrode realizations remain subdued because demand has not yet tightened, while needle coke prices have been stable for 2-3 quarters, compressing the profit spread.
- Chinese oversupply is the structural drag: China's shift to electric arc furnace steelmaking has stalled at ~11%-12% versus its own 20% target, so excess Chinese electrode production keeps leaking into export markets and depressing global prices.
- Quality gap limits the damage: Chinese electrode technology and quality remain far behind, and management argues that for large furnaces the risk of a single electrode breakage wiping out 1-2 hours of production dwarfs the 1.5%-2% cost saving from using a cheaper electrode.
- Western peers signal a turn: Some Western competitors have announced price increases of 15%-20% for new orders, and management expects the market to follow, though it has not issued its own announcement, noting that a letter alone does not change ground reality.
- Demand tailwind building: An incremental 8-10 crore tons of electric arc furnace capacity is either already operating or coming online this year and over the next 2-3 years, which should tighten the electrode market.
Ravi Jhunjhunwala: "Announcing on paper and making that change on ground are 2 different things. See, purely by sending a letter, if I could get a price increase, I'll be very happy to do it this afternoon."
Cost Position & Capacity
- Lowest-cost producer claim intact: Management believes HEG remains the lowest-cost graphite electrode producer globally, or marginally better, even after its recent expansion to 100,000 tons of capacity.
- Capacity utilization steady: The plant operated at ~80% utilization on the expanded 100,000-ton base, which management says is the highest utilization rate among all graphite electrode companies in the Western world.
- Order book visibility is short: 80-85% of the current quarter is already sold, and at least 50% of the April-June quarter is booked, but the company cannot plan production further out without knowing the size and quality mix of orders.
Demerger: Structure & Timeline
- Two-month delay from the share split: The demerger scheme was held up because the face value of shares was split from ₹10 to ₹2, requiring papers to be re-filed with SEBI; the process is now back underway.
- Target is completion by end-2025: Management hopes to secure all regulatory approvals and complete the listing of the new entity by the end of this calendar year.
- 1:1 share distribution plus promoter contribution: Existing HEG shareholders will receive shares in the new entity on a 1:1 basis, while promoters will get additional shares in return for contributing their 51% stake in Bhilwara Energy into the new company.
- The thesis is multiple arbitrage: The graphite electrode business trades at one multiple, while the green and anode business is expected to command an entirely different, higher multiple, and the demerger is designed to surface that value.
- No dilution impact claimed: Management asserts that the additional shares issued to promoters will not be detrimental to minority shareholders and will instead enhance value by creating a linear, clean structure for the future.
Anode Project: Build, Economics & Risks
- Site and scale locked in: The plant will sit on 105 acres in Dewas, with final drawings underway for a 20,000-ton capacity, up from the original 10,000-ton plan. Construction started more than 2-3 quarters ago.
- Capex and payback: Total project cost is estimated at ₹1,700-1,750 crores, with a payback period of approximately 7 years; that payback could shorten if government power-tariff incentives materialize, but those negotiations are still ongoing.
- Margin advantage is real but bounded: Management expects a 10%-15% margin premium because the product is made outside China, though it pushed back on the idea of a 20%-30% delta.
- Synergies with the graphite core: Raw material purchasing and the graphitization process are common to both HEG's existing graphite business and the new anode plant, giving the company an edge over competitors starting from scratch.
- Battery price assumptions updated: Global battery prices have more or less bottomed out, and the business plan has been refreshed accordingly, so the original payback math still holds.
- Professional leadership being assembled: The new entity, HEG Greentech / Bhilwara Energy, will be professionally led with a dedicated CEO; management says it is currently putting all the pieces of the puzzle together.
GrafTech Investment
- A treasury-deployment trade, not a strategic move: HEG took a 10%+ stake in GrafTech 3-5 months ago, purely as a financial investment, with no plans for integration; management notes GrafTech's cost base is much higher than HEG's.
- The logic is asymmetric upside: GrafTech's market cap was roughly half of HEG's despite having 2x the electrode capacity and 70% backward integration into needle coke, while HEG was sitting on cash earning only 6%-8% returns.
- Other income boosted by MTM gains: Mark-to-market gains on the GrafTech shares contributed approximately ₹60-70 crores to other income this quarter.
Ravi Jhunjhunwala: "We were sitting on a fairly substantial treasury, which was giving us 6%, 7% -- a rate of 6%, 7%, 8% return. So, we said, why not? If we are sitting on cash and making 7%, 8% returns, and if we believe in this business, and -- so, obviously, if we believe in this business and we believe in all whatever I just explained that their prices are likely to shoot up much more than ours."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Demerger completion | All regulatory approvals secured; new entity listed | By end of 2025 |
| Anode plant operational | 20,000-ton plant fully operational | By September 2026 |
| Anode plant capex | Total project cost ₹1,700-1,750 crores | Over construction period |
| Anode plant payback | ~7 years, shorter if power-tariff incentives obtained | Post-commissioning |
| Electrode price recovery | Market to follow Western peers' announced 15%-20% increases | Not dated; conditional on market acceptance |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Revenue from operations | ₹477 cr, vs ₹562 cr in Q3 FY24 |
| EBITDA | ₹194 cr, vs ₹110 cr in Q3 FY24 |
| Standalone net profit after tax | ₹98 cr, vs ₹37 cr in Q3 FY24 |
| Consolidated net profit after tax | ₹83 cr, vs ₹44 cr in Q3 FY24 |
| EBITDA margin | ~16–17%, management indicated similar range for next 1–2 quarters |
| Treasury size | ~₹1,000 cr as on 31 Dec 2024, company is long-term debt-free |
| Other income (MTM gains on GrafTech shares) | ~₹60–70 cr |
| Capacity utilization | ~80% on expanded base of 100,000 tons, vs 81% on 80,000 tons in 9M FY24 |
| Ex-China industry capacity utilization | 65–70% (nameplate capacity 700,000 tons), per management estimate |
| Ex-China industry capacity (operational) | 500,000–600,000 tons, down from 740,000 tons in 2010; 8 plants closed, 240,000 tons removed |
| New EAF capacity expected by end of 2025 | 2–3 crore tons globally, ex-India and ex-China |
| Anode plant capex | ₹1,700–1,750 cr, ₹100 cr spent so far; operational by Sep 2026 |
| Anode plant capacity | 20,000 tons, increased from initial 10,000 tons |
| Competitor announced price increases | Resonac 20%, Tokai 10%, GrafTech 15% for new orders |