Key Takeaways
- Market share gains in a tough quarter: HEG operated at the highest capacity utilization in the global graphite electrode industry (89% over three quarters) and gained share across all regions, even as demand stayed muted and pricing remained under pressure from Chinese steel exports.
- Pricing floor is visible, not a catalyst: 50–60% of next year’s volume is already settled at prices similar to recent quarters, and management expects no uptick for the next two quarters, so the near-term P&L is locked in.
- The structural demand story is intact but back-end loaded: 2 crore tons of new EAF capacity is already ramping, another 4–5 crore tons is coming before 2028, and the global shift toward EAF steelmaking is expected to generate ~200,000 tons of incremental electrode demand by 2030 (ex-China).
- Cost advantage is the moat: HEG’s single-location 100,000-ton plant in India gives it a structural cost lead over older, smaller Western plants (30,000–55,000 tons), a gap that widens as those plants age and face restart risk after closures.
- What to watch next quarter: Whether the NCLT scheme order arrives as expected (reserved, order due in 1–2 weeks), the pace of EAF capacity ramp-up translating into electrode orders, and any signal on pricing beyond the already-settled volume.
Market Position & Competitive Dynamics
- Capacity utilization leadership: HEG ran at 85% utilization in the previous quarter and 89% over the last three quarters combined, both the highest in the graphite industry worldwide, while competitors operated well below that level.
- Scale-driven cost advantage: HEG’s Mandideep plant is the single-location largest in the world at 100,000 tons, versus an average of 50,000–55,000 tons for competitors in Germany, France, the US, and Japan. A 100,000-ton plant in India versus 30,000–40,000-ton plants in Western countries makes a huge cost difference.
- Competitor plant closures create a supply floor: Plants closed in the last 2–3 years (30,000–40,000 tons each) will be very difficult to restart after 2–3 years of closure, especially given their age: all are older than HEG’s 1976 plant, which was the last new Greenfield graphite electrode plant built anywhere in the world.
- Market share gains across all regions: HEG gained share in the US, Europe, Southeast Asia, and other regions from all major competitors, including American, Japanese, and smaller players, and management stated it will not lose market share in any part of the world for any reason.
- Chinese competition is not yet a UHP threat: Chinese capacity is mostly non-UHP grade; only 1–2 companies make UHP products, and consistency and reliability take time. Chinese capacity will be partly absorbed by China’s own increasing EAF production, so HEG is not as worried about Chinese UHP impact because commensurate demand is also coming.
Ravi Jhunjhunwala: "When you are talking about 100,000 tons plant located in India versus a 50,000 tons average in Germany or France or US or Japan, it makes a huge difference."
Demand Environment & EAF Transition
- Current demand is muted and uneven: Global graphite electrode demand faced challenging conditions with cautious customer procurement and sustained pricing pressure from elevated Chinese steel exports; demand conditions remained uneven across all regions.
- India is the bright spot: India’s crude steel production increased 10.4% YoY, supported by strong infrastructure spending, resilient automotive demand, and ongoing capacity additions.
- EAF capacity additions are real and ramping: 2 crore tons of new Greenfield EAF capacity was added in CY2024–2025; these plants take 2–6 months to stabilize to 80–95% utilization, which will gradually increase electrode demand. Another 4–5 crore tons of EAF capacity is expected before 2028 from established customers whose expansions are known.
- The 2030 demand bridge: The global transition toward low-emission EAF steelmaking is expected to generate incremental graphite electrode demand of approximately 200,000 tons by 2030, excluding China. Total new EAF capacity is projected at 11 crore tons by 2030: 2 crore tons already added, 6 crore tons in CY2026–2028, and another 3 crore tons in CY2029–2030.
- Steel cycle turnaround expected: For the last 2–3 years, steel has been stagnant or declining in some regions; management expects a turnaround, and about 2 crore tons of EAF steel capacity that came up in calendar year 2025 is replacing blast furnaces due to carbon emission regulations.
Pricing, Tariffs & Margin Mechanics
- Near-term pricing is locked: 50–60% of next year’s volume is already settled at prices more or less similar to the last few quarters, and management does not expect any uptick for the next two quarters.
- US tariff absorption: An 18% tariff applies to HEG’s US exports; the company will absorb that cost to avoid losing customers on a long-term basis. The tariff calculation exempts the portion of cost already imported from the US (raw material), so the impact on profit exists but is not significant, and the company can very easily absorb it.
- Margin improvement is operating leverage, not raw materials: Margin improvement in the electrode business over the last three quarters came from operating leverage and higher production, not raw material cost advantage. Needle coke prices have been consistent, with only a marginal drop from slightly higher-cost inventory cycling out.
- Needle coke pricing is a follower, not a leader: Needle coke is contracted quarter-by-quarter and cost is locked when booking. If electrode prices rise, needle coke suppliers will also increase prices, but electrode prices must rise first.
- Supernormal margin cycle mechanics: In the 2017–18 cycle, supernormal margins occurred because electrodes take two months to make, so inventories (finished goods, WIP, raw material on high seas) benefited from a sudden price spike. When the market fell two years later, the industry took a big NRV hit.
Ravi Jhunjhunwala: "18% is still 18%, but that number is not staggering. I mean, of course, it will hit the bottom line to some extent, but we can very easily absorb that. We are a long-term player, we are not looking at next 12-months only. I mean, we do not want to vacate the market just because there is a duty."
Capacity Expansion & Capital Allocation
- 15,000-ton expansion underway: Construction activity for the recently announced 15,000-ton expansion is progressing as per schedule, with most long-term delivery items already placed. The additional capacity is expected to be ready by early 2028 and would easily get absorbed given demand growth.
- GrafTech investment is a long-haul position: Management is staying put on its GrafTech investment, stating it was clear from the start that it is in it for the long haul and is not bothered about short-term price fluctuations. Management does not believe GrafTech will close down, adding there is no scope for any company in this industry to close down given demand growth.
- NCLT scheme of arrangement progressing: The NCLT bench at Indore has heard the matter and reserved its order on the first motion application; the order is expected within the next one or two weeks, and the entire scheme is expected to be approved by Q1 FY27.
Ravi Jhunjhunwala: "We are staying put. I mean, when we took this view and started buying some shares of GrafTech, we were very clear that we are in it for a long-haul."
Greentech & Diversification
- Demerger timeline: The demerger of the Greentech business is expected to be completed by Q1 FY27. Post-demerger, debt in Greentech will be negligible; debt will start coming in once the company is formed and projects are in full execution mode.
- Energy storage pipeline building: HEG won a BESS tender in Gujarat and is the declared L1 bidder for a Maharashtra tender. A detailed presentation in January outlined projects to execute over the next two to four quarters with associated debt requirements.
- Anode project economics: The anode plant is getting commissioned by Q1 FY28, with peak revenue from FY29 but some contribution from TACC also in FY28. The Madhya Pradesh state government has provided a power deal where power prices will remain significantly lower than Rs.5 for at least five years from commencement of operations, a cost level management does not see matched anywhere in the world, including China.
- Meaningful Greentech revenue expected from Q1 FY28: Revenue from the energy storage business and IPP business is expected to become meaningful from Q1 of FY28.
Riju Jhunjhunwala: "the state government of MP has given us a real good deal in which our power prices will remain significantly probably lower than Rs.5 for at least five years from today. So, that itself, I mean, we do not see anywhere, whether it is China or anywhere else in the world, where you would find cheaper power than this today."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| NCLT scheme first motion order | Order reserved; expected within 1–2 weeks | Imminent (order awaited) |
| NCLT scheme full approval | Entire scheme approved by NCLT | Q1 FY27 |
| 15,000-ton capacity expansion | Construction progressing; capacity ready | Early 2028 |
| Electrode pricing | No uptick expected; similar to recent quarters | Next two quarters |
| Greentech demerger completion | Demerger done | Q1 FY27 |
| Anode plant commissioning | Plant commissioned | Q1 FY28 |
| Meaningful Greentech/IPP revenue | Revenue contribution begins | Q1 FY28 |
| Anode project power cost | Significantly lower than Rs.5/unit | At least 5 years from commencement of operations |
| US market presence | HEG will absorb 18% tariff; will not vacate market | Ongoing (long-term stance) |
| Market share | Will not lose market share in any region for any reason | Ongoing (stated policy) |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue from operations | ₹656 cr, vs ₹477 cr in Q3 FY25 |
| Revenue from operations (9M) | ₹1,965 cr, vs ₹1,616 cr in 9M FY25 |
| EBITDA (9M) | ₹623 cr, vs ₹393 cr in 9M FY25 |
| Standalone PAT (9M) | ₹344 cr, vs ₹163 cr in 9M FY25 |
| Consolidated PAT (9M) | ₹455 cr, vs ₹189 cr in 9M FY25 |
| Treasury balance | ₹1,155 cr as of 31st Dec 2025 |
| Capacity utilization | 89% in last three quarters combined, 85% in previous quarter |
| Product mix (ultra high power) | 70%–75% of graphite electrode output |
| Volume growth (9M) | ~20% YoY (per an analyst's math) |
| Next-year volume settled | 50%–60% of expected volume, pricing similar to recent quarters |
| US export duty | 18%, down from 50%; impact described as not staggering |
| Incremental electrode demand expected | ~200,000 tons by 2030, excluding China |
| New Greenfield EAF capacity added | ~2 crore tons in CY2024 and CY2025 |
| New Greenfield EAF capacity expected | ~6 crore tons between CY2026 and CY2028 |
| Expansion underway | 15,000 tons additional capacity, completion target early 2028 |