Key Takeaways
- Demand soft, margin squeeze imminent: Volumes are under pressure from weak government demand and builder cost inflation, while pet coke costs have nearly tripled YoY. Management expects Q1 margins to stay under pressure unless cement prices rise.
- Fuel cost shock is structural, not cyclical: Management believes coal will never fall below \$150/ton again, and pet coke landed cost hit ~Rs.27,500 in May vs ~Rs.20,000 in Q4. The fuel-switching agility improved, but the absolute cost level is the real problem.
- Green power and AFR are the margin defence: Renewable power share reached 23%, targeting 35-40% by FY25. Alternative fuel TSR is ramping toward 11-12% next year. These are the only levers management fully controls on the cost side.
- Pricing power is the unanswered question: Management insists cement should cross Rs.500/bag, yet it averages Rs.370, unchanged since 2018. The industry is in a "stabilizing phase" of passing on costs, but the pace is slow and the outcome uncertain.
- What to watch next quarter: Whether the promised June price increases materialise, the actual Q1 margin hit from high-cost fuel inventory, and any progress on the Gujarat environmental clearance timeline.
Demand & Volume
- Government demand stalled: Slackness stems from panchayat-level funds not flowing, removing a key demand driver. Heat is causing a marginal additional impact on sales.
- Builder cost inflation hurting offtake: Construction activity slowed because building material costs rose across the board. Management argues cement is only 0.1% of the 13.5% builder cost increase, but the aggregate inflation is still depressing volumes.
- Trade mix optically weaker: Reported trade share fell to 75% from ~85-86%, but this was a classification issue: branded rake supplies to large wholesalers were counted as non-trade. Actual trade mix remains ~80% and will be corrected next quarter.
- Dealer liquidity tight: Outstanding receivables increased marginally, though management says they remain fully secured. The liquidity crunch at the dealer end is a near-term watchpoint.
- Road project exclusion is structural: The company does not manufacture OPC, only PPC (green cement). CPW regulations do not prefer PPC for road projects, so Heidelberg does not bid for that demand pool at all.
Management: "Cement as a component as a builder is just the impact of cost which is increased for a builder is 13.5% for all the building materials. Steel is one of the largest which constitute about 35%. Cement as a component in that is 0.1% of the 13% of cost increases which has gone."
Fuel Cost Shock & Margin Pressure
- Pet coke cost nearly tripled: Landed cost reached ~Rs.27,500/ton in May, up from ~Rs.20,000 in the March quarter. Per-gigajoule cost moved from Rs.300-360 to Rs.780-790, even touching Rs.900.
- Coal view is structurally bearish: Management does not expect coal prices to fall below \$150/ton ever again, and even that level is only possible after 2024. This implies a permanently higher fuel cost base for the industry.
- Q1 margin pressure locked in: Some impact is inevitable because the company is buying at higher prices now. Fuel inventory covers only 25-30 days, so the cost will flow through quickly. Margins will remain under pressure if prices do not increase in the remaining 45 days of the quarter.
- Cost pass-through is slow and partial: Slight cost increases were passed to customers over the last 1-1.5 months, but the industry is likened to climbing a 100-step ladder and pausing every 25 steps. The pace is insufficient to offset the fuel shock so far.
- Consumption levers are maxed out: Management can reduce consumption but not raw material costs, describing the limit as "you can remove the flesh from the bone, but you cannot cut the bone."
Management: "I do not expect in future the coal prices to be coming down below \$150 ever in future. That's what my feeling is and that too also after '24 or so, it may come down to below that level."
Pricing & Government Intervention Risk
- Cement prices stagnant since 2018: The all-India average is Rs.370/bag, the same level as 2018-2021. Management believes prices should cross Rs.500/bag and that customers will eventually realise cement will not be available below Rs.380-400/bag.
- June price increases expected: Management stated constant increases will "definitely" come in June if business picks up even a little. This is a near-term test of industry pricing discipline.
- Diesel pass-through is a non-issue: Diesel price reduction impact is only Rs.2/bag, while cement prices fluctuate Rs.20-30 daily, making it impossible to isolate a diesel-driven price cut.
- Government intervention risk deflected: When asked whether the government might curb cement pricing as it did with steel duties, management pushed back, asking why one industry should be the "whipping boy" when all commodity prices are rising. No direct probability assessment was given.
Management: "Navin, prices right now should cross Rs.500 a bag according to me. Today, cement still is on an average Rs.370. This was the price ruling in '2018, 2019, 2020 and 2021 also. We are still at the same place."
Cost & Efficiency Levers
- Green power share rising fast: Reached 23% of total power, with Ammasandra at ~95%+ and Narsingarh close to 40%. A 5.5 MW solar plant was recently commissioned and is delivering a very good plant load factor. Target is 35-40% by FY25.
- Third-party renewable tie-up secured: A 22 GWh energy tie-up from third-party sources will help keep power costs lower. MP government revised grid prices by only ~3%, and no significant electricity price increase is expected in coming quarters.
- AFR system ramping up: The Damoh AFR system started operating in December and is gradually ramping. Target is 11-12% TSR next year and 22-23% by FY24-25, though AFR availability and logistics remain challenges.
- Fuel-switching agility improved: Lag time for switching fuels reduced from 2-3 days to almost 36 hours without disturbing the kiln, giving the plant more flexibility to optimise between pet coke and coal.
- CO2 target tied to AFR and renewables: The roadmap to reach ~500 kg/ton from 511 kg/ton by 2025 depends entirely on increasing AFR and renewable energy use.
Capacity, Expansion & Capex
- Utilisation recovering from a low base: Capacity utilisation dipped from 91% to 87% due to expansion work and COVID, and now sits at ~76% given market conditions. Management does not want to push too hard into a soft market.
- No market share loss expected: With utilisation at 76% and the market growing 6-8%, there is room to reach 90% utilisation without share loss. The only risk to hitting 90% is running out of fuel.
- Debottlenecking to add low-cost capacity: Ordering for debottlenecking and improvement projects will happen by June-July, with benefits starting by March-April next year. Line-II (22,600 DPD) is being studied for expansion to 31-33,000 DPD after initial benefits fell short of expectations.
- Gujarat greenfield at a nascent stage: Coastal zone/CRW approval obtained. Environmental study will take ~1 year, with final clearance expected in ~1.5 years. Plant construction would then take another 2 years, implying operations not before FY26 at the earliest. Internal work on land procurement and boundary creation will start in the meantime.
- Sustainable capex plus one-off spend: Normal sustaining capex of Rs.50-60 cr p.a. continues. MP debottlenecking will add Rs.40-50 cr in FY23, taking total FY23 capex to ~Rs.100 cr and FY24 to Rs.80-90 cr.
- Inorganic options open: Management is always open to inorganic opportunities. The Zuari merger is described as a "doable project" but a question of financial engineering without shareholder value loss, expected in another 2-3 years at best.
Balance Sheet & One-Offs
- Now debt-free: The third and final tranche of non-convertible debentures was repaid. The company has no debt.
- Dividend recommended: Board recommended Rs.9 per share, subject to AGM approval.
- MP tax incentives boosted EBITDA: Tax incentives received from the MP government were new and had not been coming before. These contributed to reported profitability.
- Incentive expiry in February 2023: The MP incentive completes 10 years in February 2023 and is not expected to be extended by the government. This creates a ~1-year tailwind that then drops off.
- UP zero-interest loan repayment: Being repaid year-by-year transparently until 2026.
- Other expenses QoQ decline was seasonal: December quarter had a big plant shutdown that inflated costs; March quarter typically has no shutdown, so expenditure reduced QoQ. YoY, other expenses are in a similar range.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Green power share | Cross 35%, target 35-40% | FY25 |
| CO2 emissions | Reach ~500 kg/ton from 511 kg/ton | By 2025 |
| AFR thermal substitution rate | Reach 11-12% TSR | Next year (FY23) |
| AFR thermal substitution rate | Reach 22-23% TSR | FY24-25 |
| Debottlenecking benefits | Benefits from improvement projects to start flowing | March-April 2023 |
| Gujarat environmental clearance | Final award expected | ~1.5 years |
| MP incentive expiry | Incentive ends, not expected to be extended | February 2023 |
| UP zero-interest loan | Fully repaid | By 2026 |
| FY23 capex | ~Rs.100 cr (Rs.50-60 cr sustaining + Rs.40-50 cr MP debottlenecking) | FY23 |
| FY24 capex | Rs.80-90 cr | FY24 |
| Zuari merger | "Doable project," expected | 2-3 years at best |
Key Metrics
| Metric | Q4 FY22 |
|---|---|
| Revenue | Not stated |
| EBITDA per ton | ₹961, up from ₹910 for the full year |
| Full-year EBITDA per ton | ₹910 |
| Net cash | ₹134 crore as of 31st March |
| Cash balance | ~₹380 crore |
| Total debt (actual loan amount) | ₹235 crore |
| Dividend recommended | ₹9 per share |
| Cement capacity utilization | 76%, recovering from a dip from 91% to 87% earlier |
| Clinker factor | 61.4% |
| CO2 emission | 511 Kg per ton of cement, target 500 Kg by 2025 |
| Green power share | 23% of total power, target to cross 35% in the near future |
| Premium cement share | 22%, up from 21% in the previous quarter |
| Trade sales mix | 75%, though management noted a classification issue and expects trade to remain around 80% |
| Logistics road share | 46%, rail share 54% |
| Pet coke price (landed, domestic) | ~₹20,000 per ton in the March quarter, rising to ~₹27,500 in May |
| Coal and pet coke cost increase QoQ | 20% |
| Price increase since March | ₹20–25 per bag |
| Incentive amount accounted in Q4 | ₹30 crore, of which ₹200 relates to earlier periods |
| Sustainable CAPEX guidance | ₹50–60 crore per annum |
| De-bottlenecking CAPEX in FY23 | ₹40–50 crore additional, total ~₹100 crore in FY23 |