Key Takeaways
- Broad-based recovery, Novelis leads: Consolidated EBITDA rose 14% QoQ, driven by a 15% sequential jump at Novelis as beverage can destocking ended and shipments rebounded 12%.
- Copper delivers a record quarter: Metal shipments hit an all-time high of 134 Kt, lifting segment EBITDA 23% QoQ to ₹653 crores on higher volumes and richer gold content in concentrate, not better TC/RCs.
- Alumina is the next growth vector: A new 2-million-ton refinery in Odisha, backed by a long-term bauxite MOU, signals a strategic pivot to capture healthy returns selling alumina into the Middle East on LME-linked contracts.
- Cost tailwinds are mixed: Caustic, furnace oil and CP coke costs are trending down, but coal is ticking up in Q3, leaving the near-term cost of production flattish.
- What to watch next quarter: Whether the promised Q3/Q4 step-up in third-party alumina sales materializes, the pace of the Silvassa downstream ramp, and any update on the Meenakshi coal mine land clearance.
Novelis: The Quarter's Engine
- Shipments snapped back: Total shipments rose 6% QoQ, with beverage can sheet up 12% sequentially as customer inventory reduction ran its course.
- Profitability per ton improved: EBITDA per ton reached $519, up 8% sequentially, supported by higher volumes, operating leverage and better scrap utilization.
- Clayton closure removes a drag: The October decision to shut the cold-rolled and finishing line in the US removes an old, high-fixed-cost plant that no longer made economic sense. Management described the review of other sites as a continuous process but gave no commitments.
- Bay Minette on track: The 600 Kt greenfield facility, equipped to supply beverage packaging and automotive markets, is slated for commissioning in late calendar year 2025.
- Capex trending lower: Full-year Novelis capex is expected at $1.6 billion to $1.8 billion, most likely at the lower end of that range.
Ahuja: "We keep looking at it... it's a continuous process of review."
Copper: Record Quarter, Specific Drivers
- Volumes drove the beat: Record metal shipments of 134 Kt, up 13% QoQ, followed the normalization of cathode production after a prior-quarter maintenance shutdown.
- Not a TC/RC story: Management was explicit that the record ₹653 crores EBITDA did not come from higher treatment and refining charges. The lift came from higher volumes, imported cathodes converted to rods, and richer gold content in purchased concentrate.
- Other value streams contributed: Gold, silver and sulfuric acid all added to the quarter's performance, making this a volume-plus-byproduct story rather than a margin-rate one.
- Near-term demand signal: An upswing in buying activity is anticipated next quarter, tied to the expected ramp-up and resumption of smelters currently under maintenance in China.
Pai: "It's certainly not higher TC/RCs because TC/RCs were not that high because we bought concentrate which were more richer in gold."
Alumina: A Strategic Growth Pivot
- The Odisha bet: Hindalco signed an MOU with Odisha Mining Corporation for long-term bauxite supply to a new 2-million-ton alumina refinery and 160 MW captive power plant at Kansariguda, Rayagada. The ~₹8,000 crores investment will be executed in two phases, with the first 1-million-ton phase targeted within 36 months.
- Why not just expand Utkal: Expanding Utkal further would deplete the Baphlimali mine too fast. The new refinery preserves mine life at Baphlimali and opens a fresh bauxite source for the next 10 to 15 years.
- The market is regional, the returns are healthy: The strategy targets Middle Eastern smelters from EGA to Alba. Contracts are annual to bi-annual, indexed to a percentage of the LME aluminum price, typically 14% to 15%. Management sees a very healthy return at the cost of production they can achieve.
- Utkal remains the cost champion: Utkal is rated the number-one lowest-cost alumina refinery in the world for the third-party market, giving Hindalco a strong base from which to build its merchant alumina business.
- Near-term volume step-up: Higher third-party alumina sales from the brownfield expansion are expected to begin showing in Q3 and Q4.
Pai: "The cost of production of alumina that we can achieve, there is a very healthy return on these investments, so which is why we are doing it."
India Aluminum: Downstream Ramp, Upstream Resilience
- Upstream held margins despite lower volumes: Shipments dipped 2% QoQ and revenues fell 2%, but EBITDA rose 7% on lower costs. EBITDA per ton reached $751, up 9% sequentially, with margins at 26.3%, among the best globally.
- Downstream volumes jumped: Shipments rose 15% QoQ, revenues 8%, and EBITDA 16%, all on higher volumes. EBITDA per ton is running at about $220.
- Downstream capacity still loading: The Silvassa extrusion expansion of 30 Kt is ramping up and will fully contribute next year. The Sambalpur 170 Kt FRP plant will start up toward the end of next year, so its impact will only be visible the year after.
- Cost curve position is secure: Aditya, Mahan and Renukoot smelters sit firmly in the first quartile of the global cost curve. Hirakud is on the right-hand side, and the higher-cost Muri refinery output is sold into the third-party hydrate market rather than feeding smelters.
- Coal costs ticking up, other inputs easing: Coal is expected to be slightly up in Q3, but caustic, furnace oil and CP coke continue to trend down, leaving the overall cost of production flattish quarter-on-quarter.
- No aluminum expansion without renewables: Management will only expand aluminum capacity when more renewable power is in the mix; future expansion will not be coal-based.
Capital Allocation & Balance Sheet
- Hedging is insurance, not a bet: Hindalco hedged only 5% of FY25 aluminum production using a zero-collar structure with a floor of $2,200 and a ceiling of $2,517. Management does not believe this is a time to take a forward position.
- Working capital follows the seasonal pattern: The first half of the year builds inventory and uses cash; the second half, most pronouncedly in Q4, releases working capital as inventories decline. This year, there is an additional use of cash tied to purchased metal being processed and not yet replaced.
- India capex this year: Expected between ₹4,000 crores and ₹4,500 crores. Next year's guidance will be provided in the February call.
- Coal linkage progress: Tranche 2 and 3 coal linkages were secured at reasonably good prices, only slightly higher than before. Tranche 4, covering another 0.3 crore tons largely in the NCL region, comes up in January and the company is working to secure it.
- Chakla mine on schedule: The October 2024 box-cut timeline for the Chakla coal mine is still holding. Meenakshi West has been won and work will begin, though the Meenakshi CBA land issue remains unresolved with no clear timeline.
Pai: "We don't believe that this is a time to take a forward position. So what we did for FY '25 is that we actually hedged around 5% taking a zero collar... we hedge for insurance, not to take a forward look."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Aditya alumina refinery, Phase 1 | First 1-million-ton capacity online | Within 36 months |
| Third-party alumina sales step-up | Higher volumes from brownfield expansion | Q3 and Q4 FY24 |
| Bay Minette commissioning | 600 Kt facility operational | Late calendar year 2025 |
| Silvassa downstream ramp | Full 30 Kt extrusion capacity contributing | Next year (FY25) |
| Sambalpur FRP plant | 170 Kt facility startup | End of next year; volume impact the year after |
| Novelis full-year capex | $1.6 bn to $1.8 bn, likely lower end | FY24 |
| India capex | ₹4,000 crores to ₹4,500 crores | FY24 |
| Chakla coal mine box cut | Mine development milestone | October 2024 |
| Renewable power projects | 50 MW solar/wind commissioned; 100 MW hybrid COD begins | Q1 FY25; December 2024 onwards |
| ODS phaseout | All sites ozone-depleting substance free | FY26 |
| Water positivity, all mines | All mine clusters water positive | 2025 |
| Contractor safety software | Digital safety system implemented | March 2024 |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Consolidated revenue | ₹54,169 cr, up 2% QoQ |
| Consolidated business segment EBITDA | ₹6,896 cr, up 14% QoQ |
| Consolidated reported EBITDA | ₹6,096 cr, flat QoQ |
| Consolidated PAT | ₹2,196 cr, down 11% QoQ |
| Consolidated net debt-to-EBITDA | 1.66x as of September 2023 |
| Consolidated net debt | ₹37,613 cr; India operations ₹1,174 cr, Novelis ₹36,439 cr |
| Novelis shipments | 933 Kt, up 6% QoQ; beverage can shipments up 12% sequentially |
| Novelis EBITDA | $484 million, up 15% YoY |
| Novelis EBITDA per ton | $519 per ton, up 8% sequentially from $479 |
| India upstream aluminum shipments | 334 Kt, down 2% QoQ |
| India upstream aluminum EBITDA | ₹2,074 cr, up 7% sequentially; EBITDA per ton $751, up 9% sequentially |
| India upstream aluminum EBITDA margin | 26.3%, higher than last quarter |
| India downstream aluminum shipments | 94 Kt, up 15% QoQ |
| India downstream aluminum EBITDA | ₹171 cr, up 16% QoQ |
| Copper metal shipments | 134 Kt (record high), up 13% QoQ; CCR volumes 100 Kt, up 2% sequentially |
| Copper EBITDA | ₹653 cr (all-time high), up 23% QoQ |
| India aluminum hedging for H2 FY24 | ~11% hedged at $2,755 per ton |
| India aluminum hedging for FY25 | ~5% hedged via zero collar, bottom at $2,200 and ceiling at $2,517 |
| Coal cost change Q1 to Q2 | Down 15% sequentially |
| Cost of production change Q2 vs Q1 | Down 6% sequentially |
| Coal sourcing mix | Linkage 53%, e-auction 40%, own mines 5%, import and others 2%; linkage materialization nearly 90% |
| Alumina third-party sales volume | 138 Kt |
| Alumina realization (Metal Bulletin price) | $337 per ton |
| Aluminum net realization | INR199 per kg |
| India capex guidance for FY24 | ₹4,000 cr to ₹4,500 cr |
| Novelis capex guidance | $1.6 bn to $1.8 bn, most likely at the lower end |
| Aditya alumina refinery capex (first 0.1 crore tons) | Slightly below ₹6,000 cr, expected in next 36 months |
| Long-term debt prepaid in India operations | ₹2,120 cr during Q2 |
| LTIFR in India (H1 FY24) | 0.18, improvement over H1 last year |
| Renewables capacity achieved | 150 MW, 50% of 300 MW target by 2025 |
| Aluminum-specific GHG emissions (H1 FY24) | 19.58 tons CO2 per ton of aluminum |
| Waste recycled and reused (H1 FY24) | 80% of total waste; bauxite residue 108%, ash 103% |
| Freshwater consumption (H1 FY24) | 10.4 cubic meters per ton of metal, down from 18.5 in H1 FY23 |
| Mine clusters with water positivity | 5 as of September 2023, up 3 in Q2 |
| Clayton plant closure cost | $20 mn to $25 mn (per management guidance) |
| India copper market demand | 201 Kt, up 7% YoY and 3% QoQ; domestic producer share close to 72% |
| Global aluminum price average in Q2 | $2,154 per ton, versus $2,258 in prior quarter; quarter-to-date around $2,200 |
| India domestic aluminum demand Q2 FY24 | 0.13 crore tons, growth 10% YoY and 13% sequentially |