Key Takeaways
- Record profit, but Novelis scrap headwinds are building: Consolidated net profit jumped 78% YoY, driven by India aluminum and copper, while Novelis EBITDA per ton fell 6% YoY and scrap tightness is expected to worsen in Q3 and Q4.
- Copper delivered an all-time high, but it is not repeatable: EBITDA hit INR829 crores, up 27% YoY, lifted by one-off gains from gold sales and strong sulfuric acid prices; normalized quarterly run-rate guided to ~INR650 crores.
- India upstream margins are best-in-class globally: Aluminum upstream EBITDA margins reached 41%, with EBITDA per ton up 80% YoY to $1,349, helped by lower input costs and favorable macros.
- A capex super-cycle is now locked in: Three large projects (alumina refinery, aluminum smelter, copper smelter) plus Novelis Bay Minette commit the company to multi-year spending, with India capex revised up to ~$1 billion this year.
- What to watch next quarter: Whether scrap spreads stabilize or deteriorate further, the pace of alumina price benefits flowing into realizations, and any quantification of the Novelis margin recovery path.
Novelis: Scrap Tightness and the Margin Question
- Shipments steady, EBITDA under pressure: Shipments rose 1% YoY to 945 Kt on record beverage packaging volumes, but EBITDA fell 5% YoY, with EBITDA per ton down 6% to $489. The culprits: reduced metal benefits from rising aluminum scrap prices, unfavorable product mix, and a $25 million flood impact at the Sierre plant.
- Scrap tightness is structural, not transient: China is building nearly 2 crore tons of scrap melting capacity, pulling global scrap supply into its market. Protectionist trade flow disruptions are compounding the squeeze, and management called the situation "uncharted territory."
- The $600/ton target is on hold: Management acknowledged that scrap price increases were factored into long-term projections, but the current acceleration was not. Hedges are in place precisely because of this acceleration, and the company will not commit to a timeline for returning to the $600 EBITDA per ton target until trade flows stabilize.
- Near-term pain is priced in: A ~$40/ton impact from scrap tightening hit Q2, and management expects short-term worsening in Q3 and Q4 due to scrap price increases flowing through with a 60-90 day procurement lag, plus seasonal weakness (annual shutdowns, lower pull).
- New scrap sorting technology is a structural answer, but scaling takes time: Novelis has deployed Sortera technology at Guthrie and robots at Berea for sorting pre- and post-consumer automotive scrap. As scrap demand rises, the economics of preventing scrap from going to landfill become attractive, but these technologies will take time to scale and deploy across other plants.
Dev Ahuja: "this is exactly where we don't want to go right now because we are the size of the situation. We want to be responsible, if we say anything. And if we force ourselves to quantify anything at this stage, we'll be making an error of being either the too aggressive side or too conservative side."
India Aluminum: Upstream Strength, Downstream Recovery
- Upstream delivered exceptional margins: EBITDA surged 79% YoY to INR3,709 crores, with EBITDA per ton at $1,349 (up 80% YoY) and margins at 41%, which management called the best in the global industry. Lower input costs and favorable macros were the primary drivers.
- Downstream shipments recovering, but margins lag: Shipments rose 10% YoY to 103 Kt on market recovery, but EBITDA per ton fell 11% YoY to $179, hit by unfavorable product mix and a surge of imports as buyers stocked up ahead of expected QCO restrictions. Management expects Q3 and Q4 EBITDA per ton to pick up as local demand strengthens.
- Alumina prices are a tailwind that will start paying now: Alumina prices jumped to $700 per ton due to bauxite supply disruption from Guinea and Alcoa's force majeure in Brazil. Hindalco expects to see the full benefit of higher prices flowing into realizations from Q3 onward.
- Hedging provides some visibility: For H2 FY25, the Indian aluminum business is hedged at ~30% commodity at $2,579/ton, ~15% at zero collar (bottom $2,262, ceiling $2,547/ton), and ~15% currency at INR88.
- India demand story intact: Q2 FY25 aluminum demand projected at 1,433 Kt, up 7% YoY, driven by strong electrical demand (cable/conductor, solar energy) and packaging. Automotive was soft on weaker passenger and commercial vehicle demand. Imports (ex-scrap) showed a significant uptick driven by solar frame imports and inventory buildup ahead of BIS certification.
Copper: Record Quarter, But Normalization Ahead
- Best-ever EBITDA, but not all sustainable: Copper EBITDA hit an all-time high of INR829 crores, up 27% YoY, driven by operational efficiencies from the Q1 shutdown, higher byproduct realizations (sulfuric acid), higher precious metals sales, and a one-off favorable derivative accounting impact.
- One-off gains quantified directionally: The surge included extra gold sales after the government reduced gold import duty (cleaning out inventory) and stronger-than-expected sulfuric acid prices. Management guided Q3 and Q4 EBITDA to normalize around INR650 crores.
- India demand growing, but domestic share slipping: Market demand rose 9% YoY to 218 Kt, but domestic producer share fell to 63% from 73% as imports filled the gap. Concentrate availability remains limited, with spot TC/RCs at historically low levels, though recent global smelter disruptions have led to slight improvements.
- Expansion bets on downstream integration, not TC/RCs: The planned 280-300 Kt smelter expansion (total capacity ~800 Kt) is being justified on downstream conversion economics (cathode to rods, tubes, foils), not current TC/RCs. Management noted that big miners are already in discussion to sign long-term contracts for the expanded capacity.
Satish Pai: "If you take today's TC/RCs and say, are you putting up a smelter, it makes no sense. But if you look at it of taking that cathode-making copper rods and copper fuse and all the downstream, where the conversion..."
Growth Projects: A Multi-Year Capex Cycle
- Three large India projects now committed: A greenfield 850 Kt alumina refinery (signed with OMC, commissioning CY27), a 180 Kt aluminum smelter powered by renewable energy (commissioning October 2027), and a 280-300 Kt copper smelter expansion (commissioning 2029). All are expected to deliver double-digit IRRs even on conservative estimates.
- Novelis Bay Minette on track: The 420 Kt greenfield plant, fully contracted to beverage packaging, is expected to complete in H2 CY26. Steel installation and equipment foundation work are progressing rapidly.
- Downstream product upgrades underway: India's first 25 Kt Inner Grooved Tubes plant launches January 2025 (reducing AC import reliance), a battery enclosure plant in Chakla has just come on stream, and a 25 Kt battery foil plant in Aditya is being built with fungible capacity across foil types.
- Capex trajectory is steepening: FY25 India capex revised from ~$760 million to ~$1 billion due to smelter-side spending and the current pricing environment. FY26 capex is likely INR7,000-8,000 crores, with FY27 to be determined based on project start timing and cash-out phasing.
- Coal mine development progressing slowly: The Chakla coal mine is expected to begin a box cut in the latter half of next calendar year, Meenakshi West exploration starts in coming months with production possibly in 2027, and Meenakshi is still awaiting allotment.
Macro and Industry Context
- Global aluminum market balanced, China in deficit: China produced 1.1 crore tons and consumed 1.14 crore tons in Q3 CY24 (deficit of 0.04 crore tons), supported by a 20% surge in solar installation and 32% increase in NEV production. Rest of world had a surplus of 0.04 crore tons, with soft consumption in Europe, North America, and the Middle East.
- Global FRP demand recovering: Ex-China aluminum FRP demand expected to grow 4% in CY24 and 6% in CY25, with recovery across beverage packaging, automotive, specialty, and aerospace. Indian FRP demand expected to grow 7-8% YoY in FY25, led by packaging.
- Beverage packaging is a structural growth story: Near and long-term demand across regions is very strong, growing at ~4% CAGR through 2031, underpinning the Bay Minette investment thesis.
- Copper concentrate market remains tight: Global production up 2.6%, consumption up 4.7%, with a small deficit in Q3 CY24. Spot TC/RCs at historically low levels, though annual benchmark negotiations for CY25 were scheduled to commence during CESCO Asia Week.
- India macro moderating but supportive: GDP growth moderated to 6.7% in Q1 FY25, with mixed high-frequency indicators and softening manufacturing growth. RBI retained FY25 growth at 7.2%, expecting a pickup to 7.4% in H2, with inflation projected to moderate to 4.5%.
Satish Pai: "the integrated model of Hindalco between upstream and downstream means that some parts can have headwinds, some parts have tailwinds. And that's why when you look at our consolidated results, we are doing very well compared to most of our competitors in the industry."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Copper EBITDA normalization | ~INR650 crores per quarter | Q3 and Q4 FY25 |
| Downstream aluminum EBITDA per ton recovery | Pick up from current levels as local demand strengthens | Q3 and Q4 FY25 |
| Alumina price benefit realization | Full benefit of higher alumina prices to flow through | Starting Q3 FY25 |
| Scrap spread impact | Short-term worsening expected | Q3 and Q4 FY25 |
| India capex FY25 | ~INR6,000 crores | FY25 |
| India capex FY26 | ~INR7,000-8,000 crores (not yet finalized) | FY26 |
| Inner Grooved Tubes plant launch | India's first 25 Kt greenfield plant | January 2025 |
| Renewable capacity target | 300 MW | H1 CY25 |
| Aditya FRP project commissioning | Taking total downstream capacity to 600 Kt | FY26 |
| Novelis Bay Minette completion | 420 Kt capacity, fully contracted to beverage packaging | H2 CY26 |
| Alumina refinery commissioning | 850 Kt greenfield refinery with OMC | CY27 |
| Aluminum smelter commissioning | 180 Kt, powered by renewable energy | October 2027 |
| Copper smelter expansion commissioning | 280-300 Kt, total capacity ~800 Kt | 2029 |
| Chakla coal mine box cut | First development activity | Latter half of next calendar year |
| Meenakshi West coal mine production | Subject to exploration results | Possibly 2027 |
Key Metrics
| Metric | Q2 FY25 |
|---|---|
| Consolidated revenue | Not stated |
| Consolidated EBITDA | ₹9,100 cr, up 49% YoY |
| Consolidated business segment EBITDA | ₹8,564 cr, up 24% YoY |
| Consolidated net profit after tax | ₹3,909 cr, up 78% YoY |
| Consolidated net debt-to-EBITDA | 1.19x at end September 2024, lower than the corresponding period last year |
| Consolidated net debt | ₹36,033 cr |
| India business reported EBITDA | ₹5,139 cr, up 100% YoY |
| India business net profit after tax | ₹2,850 cr, up 135% YoY |
| India operations net cash | ₹2,269 cr |
| Novelis net debt | ₹39,261 cr |
| Novelis shipments | 945 Kt, up 1% YoY |
| Novelis EBITDA | $462 million, down 5% YoY |
| Novelis EBITDA per ton | $489, down 6% YoY |
| Novelis Sierre flood impact | $25 million impact |
| India upstream aluminum EBITDA | ₹3,709 cr, up 79% YoY |
| India upstream aluminum EBITDA per ton | $1,349, higher by 80% YoY |
| India upstream aluminum EBITDA margin | 41%, continued to be the best in the global industry |
| India upstream aluminum shipments | Down 2% YoY |
| India upstream aluminum revenues | Up 16% YoY |
| India downstream aluminum shipments | 103 Kt, up 10% YoY |
| India downstream aluminum EBITDA | ₹154 cr, down 1% YoY |
| India downstream aluminum EBITDA per ton | $179, lower by 11% YoY |
| Copper EBITDA | ₹829 cr, all-time high, up 27% YoY |
| Copper metal shipments | 117 Kt, down 13% YoY |
| Copper CCR volumes | 90 Kt, down 10% YoY |
| Copper EBITDA guidance for Q3 and Q4 | Around ₹650 cr per quarter |
| India domestic aluminum demand | Projected 1,433 Kt, 7% YoY growth |
| India copper market demand | 218 Kt, up 9% YoY |
| Domestic copper producer share | 63%, down from 73% in Q2 FY24 |
| Third-party alumina sold | 197 Kt |
| Alumina pricing mix | 80% on N-1 pricing, 20% on spot |
| Coal sourcing mix | Linkage 50%, e-auction 47%, own mines 2% |
| COGS change vs Q1 | Down 1.6% |
| COGS guidance for Q3 | Up 1% to 1.5% |
| Aluminum hedges for H2 FY25 | ~30% commodity at $2,579/ton, ~15% at zero collar (floor $2,262, ceiling $2,547/ton), ~15% currency at ₹88 |
| Aluminum hedges for next financial year | ~14% at $2,700 |
| Q2 realized hedge | 27% at $2,539 |
| India capex guidance FY25 | Around ₹6,000 cr |
| India capex guidance FY26 | Around ₹7,000–8,000 cr (not finalized) |
| Total declared projects capex | Between ₹400 cr and ₹500 cr |
| Aluminum smelter expansion | 180 Kt, expected on stream October 2027 |
| Copper smelter expansion | 280–300 Kt, expected on stream 2029 |
| Greenfield alumina refinery | 850 Kt, expected on stream calendar year 2027 |
| Aditya FRP project | Commissioning in FY26, taking total downstream capacity to 600 Kt |
| Novelis Bay Minette project | 600 Kt greenfield, expected completion H2 CY26, 420 Kt targeted to beverage packaging (fully contracted) |
| Novelis Guthrie recycling center | 240 Kt, ramping up |
| India's first Inner Grooved Tubes plant | 25 Kt, launching January 2025 |
| E-waste and copper scrap recycling facility | 50 Kt capacity |
| Aluminum battery foil plant in Aditya | 25 Kt |
| Total renewable capacity | 183 MW, target 300 MW by H1 CY25 |
| Aluminum specific GHG emissions | 19.62 tons CO2 per ton of aluminum, flattish YoY |
| LTIFR | 0.29 in H1, higher compared to H1 of last financial year |
| S&P Corporate Sustainability Assessment score | 87 out of 100, improved from 78 last year |
| Water recycled and reused in H1 FY25 | 0.93 crore cubic meters, 25% of total water usage of 3.77 crore cubic meters |
| Sites meeting ZLD standards | 15 of 19 sites |
| Global aluminum FRP demand growth ex-China guidance | 4% in CY24, 6% in CY25 |
| Indian FRP demand growth guidance FY25 | 7% to 8% YoY |
| Beverage packaging CAGR through 2031 | ~4% |