Key Takeaways
- Novelis tariff headwinds are being absorbed: Adjusted EBITDA of $476 million rose ~3% YoY despite a $54 million tariff impact, while the cost-savings run rate accelerated to $125 million.
- India aluminium delivered a resilient quarter: Upstream EBITDA rose 22% YoY to INR4,524 crores with margins at 45%, and downstream hit a record quarterly EBITDA of INR261 crores, up 69% YoY.
- Bay Minette’s final cost is now de-risked: Engineering is 100% complete, locking the revised capital cost at $5 billion, and the project is built into a $10 billion group capex plan through FY29 with a firm commitment to keep consolidated net leverage below 2x.
- Copper earnings compressed by a historic TC/RC trough: EBITDA fell 24% YoY to INR634 crores as benchmark TC/RCs declined 73%, though early signs of stabilization are emerging at spot levels.
- What to watch next quarter: The pace of Novelis’s tariff mitigation in H2, the commissioning of the Oswego hot mill, whether spot TC/RCs have truly found a floor, and any further detail on the phasing of India’s aluminium Phase 2 expansion.
Novelis: Tariffs, Costs & the Bay Minette Reset
- Tariff impact is being managed down: The Q2 impact was $54 million, below the guided $60 million, and management sees strong progress toward fully mitigating the headwind in H2 FY26 as contract renewals and uncontracted volumes capture the upside from a tight U.S. market and 50% 232 tariffs.
- Cost savings run rate accelerated again: The exit run rate target was raised from $75 million to $100 million last quarter and now sits at $125 million, feeding into a newly announced 3-year structural program targeting $300 million in permanent cost reduction by the FY28 exit.
- Scrap spreads and Midwest Premium tailwinds are building: The full benefit of rising Midwest Premium and falling scrap spreads was not fully captured in Q2 because the premium kept rising through the quarter and some volumes were locked in earlier, leaving more benefit to flow through in coming periods.
- Bay Minette’s $5 billion cost is now a hard number: The 50% cost increase from the original estimate was driven by standard U.S. industrial construction inflation, complexity in finalizing facility parts, and site preparation for a quick Phase 2 expansion. With engineering now 100% complete, management expressed full confidence in the revised figure.
- Bay Minette Phase 2 is framed as highly lucrative: It would require substantially lower capex than Phase 1, and the strategic rationale is described as stronger than ever given a U.S. market expected to be short again by 2030 across beverage packaging, automotive, and specialty products.
- The project timeline is taking shape: The Oswego hot mill is expected to start next month, the Bay Minette cold mill will commission next quarter, and the rest of the equipment will come through the remainder of next year.
Steven Fisher: "Now we are 100% complete in engineering. And so we are confident in the $5 billion number as we sit here today."
India Aluminium: Upstream Resilience, Downstream Records
- Upstream EBITDA per ton held at $1,521 in a monsoon quarter: The $40–$50 QoQ increase in EBITDA per ton lagged the LME rise because of lower alumina index pricing on external sales, sequentially higher coal costs in the monsoon quarter, a 3–4% higher cost of production, and slightly lower domestic premiums realized.
- Downstream hit a record on premiumization: EBITDA of INR261 crores, up 69% YoY, was driven by higher value additions, innovations, and a 10% YoY shipment increase to 113 Kt, pushing EBITDA per ton to a record $265.
- The fourfold downstream EBITDA target by FY30 is now a stated ambition: Management is building on the current momentum in value-added products to structurally lift the downstream contribution.
- Alumina sales will dip in Q3: A planned shutdown at Utkal will reduce external alumina sales to roughly 170 Kt, which will be a near-term drag on the upstream segment.
- Coal mines provide a margin floor: Management noted that even at an LME range of $2,200 to $2,400, the captive coal mines ensure a very good return, and the baseline for project IRRs is roughly $1,000 per ton of EBITDA.
- Specialty alumina will get separate disclosure: Starting sometime next year, the specialty alumina business will be broken out in reporting, similar to the downstream segment, to give investors better visibility into its pricing dynamics and contribution.
Satish Pai: "Back in April 2025, we had set an FY '26 exit savings run rate target of $75 million, which we raised last quarter to $100 million. With another quarter of solid execution behind us, the run rate is now $125 million as we accelerate all cost efficiency initiatives."
Copper: The TC/RC Trough & Early Stabilization
- EBITDA compressed sharply on benchmark reset: Copper EBITDA fell 24% YoY to INR634 crores as the CY2025 annual benchmark settled at 5.45 cents per pound, a 73% decline from 2024, though better byproduct realizations and operational efficiencies provided a partial offset.
- Spot TC/RCs may be finding a floor: Spot smelter buying terms are at record lows around negative 10 cents per pound, but management noted early signs of stabilization, which could signal that the cycle is near its trough.
- Indian copper demand remains structurally strong: Demand rose 11% YoY to 420 Kt, driven by infrastructure investments, electrical applications, and strong offtake from white goods and winding wires, supporting a CCR volume increase of 8% YoY to 97 Kt.
- A copper recycling plant is on the horizon: The new recycling facility will be commissioned next calendar year, adding a new dimension to the copper business.
Capital Allocation: The $10 Billion Plan & the Leverage Guardrail
- Consolidated net leverage will not cross 2x: This is the binding constraint across the $10 billion capex plan spanning FY26 to FY29, which absorbs the revised Bay Minette cost and all announced India projects. Management will phase capex, including potentially deferring unannounced projects like the Mahan 360 Kt smelter expansion, to stay within this guardrail.
- A $750 million equity infusion into Novelis is being structured through AV Minerals: Hindalco will raise debt at the AV Mineral level and inject it as equity into Novelis, a structure designed to secure a more attractive cost of capital than Novelis could achieve on its own, protect Novelis’s bond ratings, and demonstrate parental support while keeping consolidated net debt/EBITDA below 2x.
- Novelis turns cash-positive after Bay Minette: Management expects that once the Bay Minette project is complete, Novelis will generate positive free cash flow and its net debt-to-EBITDA will begin to decline, a milestone that will be closely watched by the market.
- India’s Phase 2 aluminium expansion is in early engineering: Initial engineering and land preparations have started, but the timing of a full announcement will be determined by cash flow considerations and the broader capex phasing.
- Hedging is insurance, not a bet: The strategy remains to hedge roughly 20% of next year’s production each year as protection against LME volatility, with 31% of Q3 FY26 already hedged at approximately $2,700 per ton. Management pushed back on the idea that this caps the investment case, arguing that locking in prices ahead of events like the Chinese New Year shutdown is prudent.
Satish Pai: "we also believe that once the Bay Minette project is over, Novelis will turn cash positive as well and the net debt-to-EBITDA will start coming down. So all these are on our mind and we are quite conscious that the next year, our execution capabilities will be closely watched by you guys."
Market Backdrop & Price Outlook
- Global aluminium is broadly balanced: China’s deficit, driven by 3% consumption growth from solar installations and a 37% surge in NEV production, is being offset by a surplus in the rest of the world, where Indian, Brazilian, and Indonesian demand is partly offsetting weaker Europe and North America.
- The U.S. price outlook is to the upside: A tight market, compounded by 50% 232 aluminium tariffs, is creating opportunities for price increases on uncontracted volumes and contract renewals at Novelis.
- MJP premiums weakened on East Asian auto weakness: The sub-$100 MJP premium reflects the impact of tariffs on Japanese and Korean auto companies, which lowered aluminium demand in the region during Q2.
- India aluminium demand grew 8% YoY: Q2 FY26 demand is projected at 0.15 crore tons, driven by electrical, solar, and automotive sectors, consistent with the broader electrification and infrastructure investment theme.
- LME assumptions for project planning are conservative: Management uses roughly $2,500 LME from FY28 onwards for project calculations, and a $1,000 per ton EBITDA baseline as a reasonable return benchmark, with acceptable IRRs even slightly below that level.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Novelis tariff mitigation | Fully mitigate tariff impact | H2 FY26 |
| Novelis cost savings run rate | Exit FY26 at $125 million run rate (already achieved); permanent structural reduction of $300 million | FY28 exit |
| Consolidated net leverage | Remain below 2x throughout $10 billion capex plan | FY26 to FY29 |
| Bay Minette cold mill commissioning | Cold mill to commission | Next quarter (Q3 FY26) |
| Oswego hot mill start | Hot mill to start | Next month |
| Copper recycling plant | Plant to be commissioned | Next calendar year |
| Chakla and Bandha mine box cuts | Box cuts to begin | December–January timeframe |
| Renewable energy capacity | Add 230 MW, deploy 130 MW of storage; total capacity to 522 MW | By end of FY26 |
| Specialty alumina reporting | Separate disclosure to begin | Sometime next year |
| Q3 FY26 cost of production | Flattish to +1% vs Q2 | Q3 FY26 |
| Q3 FY26 alumina sales | ~170 Kt due to Utkal planned shutdown | Q3 FY26 |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Consolidated business segment EBITDA | ₹9,104 cr, up 6% YoY |
| Consolidated net profit after tax | ₹4,741 cr, up 21% YoY |
| India business segment EBITDA | ₹5,419 cr, up 15% YoY |
| India net profit after tax | ₹3,059 cr, up 7% YoY |
| India Upstream Aluminium EBITDA | ₹4,524 cr, up 22% YoY |
| India Upstream Aluminium EBITDA per ton | $1,521 in a monsoon quarter |
| India Upstream Aluminium EBITDA margin | 45% this quarter |
| India Downstream Aluminium EBITDA | ₹261 cr, up 69% YoY, an all-time quarterly high |
| India Downstream Aluminium EBITDA per ton | $265, up 49% YoY, a record |
| India Copper EBITDA | ₹634 cr, down 24% YoY |
| Novelis adjusted EBITDA | $476 million, $506 per ton, up nearly 3% YoY excluding tariff impact of $54 million |
| Novelis shipments | 941 Kt, nearly flat vs 945 Kt in same period last year |
| Novelis tariff impact | $54 million net impact in Q2, vs $28 million in Q1 |
| Novelis cost savings run rate | $125 million exit run rate target for FY26, raised from $100 million |
| Consolidated net leverage | 1.23x as of September end |
| H1 FY26 cash generation | ₹8,762 cr, up 45% YoY |
| H1 FY26 capital expenditures | ₹11,330 cr, up 23% YoY |
| India aluminium demand growth | 8% YoY, projected at 0.15 crore tons |
| India copper demand | 420 Kt, up 11% YoY from 380 Kt |
| Annual benchmark TC/RCs for CY2025 | 5.45 cents per pound, down 73% from 20.5 cents per pound in 2024 |
| Spot smelter buying terms | negative 10 cents per pound |
| Alumina external sales volume | 199 Kt in Q2; ~170 Kt expected in Q3 |
| Renewable energy capacity | 292 MW operational; on track to reach 522 MW by FY26 end |
| Aluminium-specific GHG footprint | 19.47 tons of CO2 per ton of aluminium produced |
| Q3 FY26 commodity hedging | 31% at ~$2,700 per ton |
| Q4 FY26 commodity hedging | 49% at ~$2,760 per ton |
| FY27 commodity hedging | ~10% at ~$2,800 per ton |
| Bay Minette total project cost | ~$5 billion |
| India business capex FY26 | ~₹8,500 cr |
| India business capex FY27 | ~₹11,000 cr |