Key Takeaways
- Record copper, resilient aluminium, Novelis turning: India copper EBITDA hit a record INR907 crores, upstream aluminium held 48% margins at $1,756/ton, and Novelis is heading into a recovery year as Oswego restarts and Bay Minette commissions.
- Cost inflation is the near-term headwind: Q4 costs rose 2.5% QoQ, and management guided to a further 5% sequential increase in Q1 FY27, driven primarily by furnace oil and carbon inputs.
- The capex cycle is peaking, and so is leverage: Consolidated capex hit INR31,619 crores, up 47% YoY, and net debt-to-EBITDA reached 1.83x. Management sees net debt peaking between INR80,000 and INR90,000 crores over the next two years.
- Novelis's structural cost-out is the margin story: The FY26 exit savings run rate reached $200 million, on track toward a $350–$400 million permanent reduction by FY28 exit, which underpins the $600/ton long-term EBITDA target.
- What to watch next quarter: Whether the 5% cost inflation materialises and copper EBITDA holds near INR900 crores, the pace of Oswego's restart, and any movement in sulfuric acid prices if the Strait of Hormuz situation shifts.
Cost Inflation & the Margin Bridge
- Q4 cost move: Costs rose 2.5% versus Q3, with the war impact only beginning to show late in the quarter.
- Q1 FY27 guidance: Management anticipates a 5% sequential cost increase, with furnace oil as the dominant driver, followed by CP coke and pitch. Coal prices are described as more or less under control.
- Upstream aluminium resilience: Despite the cost pressure, India upstream EBITDA was INR5,448 crores at $1,756 per ton and 48% margins, which management ranks among the best in the global industry.
- Captive coal as the structural hedge: The strategy is to standardise and flatten the cost curve by controlling coal and its pricing for the next 15–20 years through captive mines. Meaningful volumes, however, only begin in FY28.
Satish Pai: "In Q4, the costs were up 2.5%, 2.4% versus Q3. And in Q4, we were just starting to see the impact of the war. So I think in Q1, we are anticipating a 5% increase over Q4, and the majority is driven by furnace oil."
Copper: Record Earnings on Sulfuric Acid & Tight Concentrates
- Record quarter: Copper EBITDA surged to INR907 crores, up 48% YoY, driven by better byproduct realisations, particularly sulfuric acid, and operational efficiencies.
- Sulfuric acid tailwind: Prices rose sharply on Middle East conflict and China's export restrictions, and have moved higher in April. Management cautioned that any opening of the Strait of Hormuz could trigger a price correction.
- Concentrate market stress: Spot TCRCs are at record lows of minus $0.21 to $0.25 per pound due to supply losses from Grasberg and Cobre Panama. This tightness is expected to persist through the year.
- Near-term outlook: Q1 FY27 copper EBITDA is expected in the same range as Q4, supported by high sulfuric acid prices. Beyond Q1, management reverts to a baseline expectation of INR600–700 crores per quarter.
Satish Pai: "I think that Q1, to be fair, will also be in the same range because sulfuric prices are high. But I'm not going to stick my neck out to Q2 and Q3. I would still go back to the 600, 700 per quarter there."
Novelis: Recovery Year with Cost-Out and Bay Minette Inflection
- Q4 performance: Shipments were 917 KT after adjusting for a 73 KT Oswego fire impact. Adjusted EBITDA was $498 million, or $543 per ton, excluding $53 million in fire costs and $27 million in tariffs, partially offset by $41 million in Sierre flood insurance recoveries.
- Recovery thesis: Management declared Novelis is heading to a recovery year in FY27, with Oswego restarting in Q1 and Bay Minette commissioning. Current-year headwinds from the fire are expected to substantially recover next fiscal year.
- Structural cost-out: The FY26 exit savings run rate reached $200 million. The programme targets a permanent $350–$400 million reduction by FY28 exit, which supports the long-term $600 per ton EBITDA guidance.
- Bay Minette ramp-up: The 600 KT greenfield facility is scheduled for completion this year. Cold mill commissioning has begun, hot mill commissioning starts next month, and all equipment should be commissioned by the back half of the calendar year. Commercial coils are expected in fiscal 2028, with an 18–24 month ramp to full run rate and EBITDA per ton north of $1,000.
- $600/ton assumption: The target does not rely on current elevated scrap spreads, which management views as unsustainable. It assumes a return to normal conditions with some tightness on pricing and spreads.
Dev Ahuja: "We have not factored in current scrap spreads. I mean these current scrap spreads and the current scrap market conditions; we take it as not sustainable. Things will come back to normal, and there will be some tightness, which we are aware about."
Growth Projects: Upstream Doubling, Downstream Premiumisation
- Aditya smelter timelines: The expansion is firm, with the first 180 pots targeted by December 2027 and the next 180 pots by December 2028.
- Downstream ambition: India downstream shipments rose 18% YoY to 124 KT, with EBITDA up 16% at INR255 crores. Management targets a fourfold increase in India downstream EBITDA by FY30.
- Specialty alumina shift: The strategy is to move the specialty business completely away from index-linked pricing as the precipitated hydrate project and other high-value-added products come online.
- Copper downstream: Inner grooved tubes are undergoing customer qualification, the Pakhajan recycling plant commissions in August, and battery-grade copper foil capacity is being rightsized due to slower-than-expected battery manufacturing in India.
- Captive coal timeline: Chakla mine expects a box cut in the next two months with first coal possibly from Q4 FY27. Bandha's first coal is only in FY28 due to a high strip ratio. Meenakshi, with a sub-1 strip ratio, should deliver substantial volumes in FY29.
Satish Pai: "I think the way we should look at our captive mines is that our cost curve gets completely standardized and flat because we control the coal and the pricing for the next 15, 20 years with these mines."
Aluminium Market: Supply Disruption Meets Strong Demand
- Global deficit widens: The market moved from a 0.03 crore ton deficit to a 0.15 crore ton deficit for CY26, driven by significant supply disruption from the West Asia conflict. Supply response is expected from restarts in Europe and West Asia and faster ramp-ups in Indonesia and Southeast Asia.
- Premium surge: The Midwest premium jumped to $380, driven by supply tightness, higher freight, and 50% US tariffs on Canadian primary aluminium. The MJP premium also rose on higher freight and low Japanese availability.
- India demand: Domestic aluminium demand grew approximately 9% YoY to 0.16 crore tons, broad-based across automotive, electrical, and packaging.
- Inventory: Global aluminium inventory has come down dramatically, especially with the West Asia conflict.
Balance Sheet: Peaking Capex and Leverage
- FY27 capex: India capex is guided at approximately INR12,000 crores, with Novelis at $230–$240 million. FY28 India capex is likely INR15,000–INR17,000 crores, but consolidated capex will be lower than current levels.
- Net debt peak: Management expects consolidated net debt to peak between INR80,000 crores and INR90,000 crores over the next two years, with a commitment to maintain net leverage around 2x at the consolidated level.
- Cash flows: Cash flows were INR21,858 crores, up 11% YoY, while capex rose 47% YoY to INR31,619 crores. Net debt-to-EBITDA stood at 1.83x.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Q1 FY27 cost inflation | 5% sequential increase over Q4, driven by furnace oil | Q1 FY27 |
| Q1 FY27 copper EBITDA | In the same range as Q4 (~INR900 cr) | Q1 FY27 |
| Novelis Oswego restart | Hot mill restarting | Next few weeks (Q1 FY27) |
| Bay Minette commissioning | All equipment commissioned; commercial coils thereafter | Back half CY26; coils in FY28 |
| Bay Minette ramp-up | 18–24 months to reach 600 KT run rate | By FY29–FY30 |
| Novelis cost savings | $350–$400 million permanent reduction | By FY28 exit |
| Aditya smelter Phase 1 | First 180 pots | December 2027 |
| Aditya smelter Phase 2 | Next 180 pots | December 2028 |
| Chakla coal mine | Box cut; first coal possibly from Q4 FY27 | Box cut in 2 months; coal Q4 FY27 |
| Bandha coal mine | First coal | FY28 |
| Meenakshi coal mine | Substantial volumes | FY29 |
| Consolidated net debt peak | INR80,000–INR90,000 crores | Over next 2 years |
| India downstream EBITDA | Fourfold increase | By FY30 |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Consolidated EBITDA | ₹10,812 cr, up 11% YoY |
| Consolidated PAT (reported) | ₹2,597 cr, down 51% YoY due to exceptional items including Novelis Oswego fire |
| Consolidated PAT (adjusted) | ₹5,796 cr, up 10% YoY excluding exceptional items |
| India business EBITDA | ₹6,610 cr, up 17% YoY |
| India business PAT | ₹3,549 cr, up 11% YoY |
| India upstream aluminium EBITDA | ₹5,448 cr, up 13% YoY |
| India upstream aluminium EBITDA per ton | $1,756 |
| India upstream aluminium EBITDA margin | 48% |
| India downstream aluminium shipments | 124 KT, up 18% YoY |
| India downstream aluminium EBITDA | ₹255 cr, up 16% YoY |
| India downstream aluminium EBITDA per ton | $226 |
| Copper metal shipments | 128 KT, down 5% YoY |
| Copper CCR volumes | 91 KT, up 11% YoY |
| Copper EBITDA | ₹907 cr, up 48% YoY, record quarter |
| Novelis shipments (adjusted) | 917 KT, down 4% YoY after adjusting for 73 KT lower due to Oswego fire |
| Novelis adjusted EBITDA | $498 million, or $543 per ton, up 5% YoY; excludes $53 million Oswego fire, $27 million tariffs, offset by $41 million Sierre flood insurance recoveries |
| Consolidated net debt-to-EBITDA | 1.83x at end March 2026 |
| Consolidated capex (FY26 full year) | ₹31,619 cr, up 47% YoY |
| Consolidated cash flows from operations (FY26) | ₹21,858 cr, up 11% YoY |
| India net debt | Minus ₹6,000 cr (gross debt ₹12,200 cr, cash ₹18,000 cr) |
| Novelis net debt | ₹63,000 cr (gross debt ₹75,000 cr, cash ₹11,000 cr) |
| Consolidated net debt peak guidance | ₹80,000 cr to ₹90,000 cr over next 2 years |
| Aluminium hedges for FY27 | 29% of commodity at $3,013 per ton; 14% of currency at ₹90.13 per $1 |
| Q4 aluminium hedges | 64% at ₹2,807; currency 26% at ₹88 |
| Alumina sales | 211 KT in Q4; ~170 KT expected in Q1 FY27 |
| Aluminium cost trend | Up 2.5% QoQ in Q4; 5% increase anticipated in Q1 FY27 over Q4, driven by furnace oil |
| Novelis FY26 exit cost savings run rate | $200 million, raised from $125 million; 3-year target $350–$400 million by FY28 exit |
| Novelis long-term EBITDA per ton guidance | $600 per ton |
| Bay Minette ramp-up timeline | 18–24 months to reach 600 KT run rate; EBITDA per ton north of $1,000 |
| Copper TC/RCs | Spot at negative $0.21 to $0.25 per pound; over 85% contracted at benchmark, expected close to zero or slightly negative |
| India aluminium demand growth | ~9% YoY, estimated at 0.16 cr tons |
| India copper demand | 402 KT, up 10% YoY |
| Global aluminium market balance (Q1 CY26) | Surplus of 0.05 cr tons; CY26 deficit revised to 0.15 cr tons |
| Aluminium-specific GHG footprint (FY26) | 19.2 tons of CO₂ per ton of aluminium produced, lowest level achieved |
| Renewable energy capacity | 470 MW; adding 53 MW, total 523 MW by end Q1 FY27 |
| LTIFR (FY26) | 0.23, improved from prior period |
| Waste recycled or reused (FY26) | 88% of total waste generated |
| Captive coal mines update | Chakla: box cut in next 2 months, first coal from Q4 FY27; Bandha: box cut done, first coal in FY28; Meenakshi: substantial volumes expected in FY29 |
| Aditya smelter commissioning | First 180 pots by December 2027; next 180 pots by December 2028 |
| FY27 India capex guidance | ~₹12,000 cr |
| FY27 Novelis capex guidance | $230 cr to $240 cr |