Key Takeaways
- B-80 enters steady production, but oil ramp is slow: Q4 was the first quarter of continuous oil and gas flow from both wells, yet oil output (~1,400 bbl/day) lagged forecasts due to a gas pocket in the D1 well. Management expects a gradual, offsetting shift as the pocket depletes.
- Revenue philosophy prioritizes stability over volume: Management is deliberately capping production to keep daily revenue around $300,000–$350,000, aiming to extend field plateau life and limit the government's revenue share to ~30–40%.
- A material cost reversal flatters Q4 earnings: A year-end settlement with the MOPU/FSO contractor changed the charging policy to link costs to actual production days, leading to a one-off reversal that reduced reported operating expenses.
- Balance sheet repair is accelerating: Total debt has fallen to ~₹210 crores, and management is targeting a sub-₹100 crore level by FY24-end, with an endeavor to become debt-free.
- What to watch next quarter: The outcome of the B-80 oil e-auction and the first oil sales revenue, the pace of the D1 gas pocket depletion and its impact on the oil-gas mix, and any update on the PY-1 well location and rig procurement.
B-80: Production, Reservoir Management & Revenue Strategy
- First full quarter of operations: Q4 FY23 was the first quarter with both B-80 wells in continuous production mode after the HP separator was repaired and commissioned, enabling simultaneous oil and gas flow.
- Oil production constrained by gas pocket: The D1 well is producing at ~1,400 bbl/day, below forecast, because a small gas pocket is causing higher gas and lower oil flow. Pressure is depleting at ~3–4 psi per day, and oil is increasing ~10–12 bbl/day as the pocket drains.
- Gas output exceeds expectations: Gas production reached 1.7 crore cubic feet/day, outperforming initial projections and offsetting the oil shortfall to keep total revenue near target.
- Revenue capped to manage government share: Management is targeting a constant daily revenue of $300,000–$350,000 (currently ~$310,000/day) and will keep production below the reservoir's optimal level. The explicit goal is to prevent the government's revenue share from exceeding one-third and to prolong the field's plateau life.
- Oil sales yet to commence: ~₹58.7 crores of oil inventory was marked to market at $78/bbl on 31 March, reducing costs, but no oil revenue was recognized in Q4. An e-auction for a >200,000-barrel tradable parcel is planned, with results expected within 10–15 days of the call.
- Debottlenecking underway: A pressure differential between the two wells (2400 PSI vs 1500 PSI) is limiting combined flow. Booster compressors are being designed by Expro, with delivery expected in 8–9 months, promising a better grip on facilities by end-FY24 or early FY25.
- Field life outlook: Geologists predict a minimum 10-year plateau and up to 15 years of total field life. New wells are not planned until FY26-27.
P. Elango: "We will not flog the reservoir, we will not do anything to the reservoirs and we will keep the reservoir in a way that the production is below the optimal level to prolong the life of the field."
Cost Structure & Profitability
- One-off cost reversal reduces Q4 expenses: After discussions with Expro, MOPU charges are now applied only when production is on, and FSO charges only when the facility is ready to receive oil. This policy change led to a reversal of previously accrued charges, flattering Q4 standalone operating expenses.
- Operating costs are largely fixed: Most production costs, including MOPU, FSO, and SPM maintenance, are fixed and do not scale linearly with output. As production increases, per-barrel costs decline at the standalone level, though the consolidated impact is muted because ~$100,000 of the ~$140,000 daily revenue returns to the subsidiary.
- B-80 net cost is competitive: Net cost is estimated at $16–$20 per barrel, while Dirok's cost is ~$1–$1.25 per MMBtu excluding royalty and levies.
- Tax-free status to persist: The company is not paying tax as it adjusts carryover losses of ~₹800–900 crores and depreciation additions from B-80. This status is expected to continue for at least 2–3 more years.
- Finance costs set to decline: Standalone finance costs were ₹24.23 crores in FY23, and consolidated costs were ₹30.16 crores. Both are expected to reduce as short-term loans are repaid.
Dirok & Gas Business
- Gas sales strategy favors value over volume: Q4 gas sales averaged 3 crore SCFD, down from 3.3 in Q3 due to seasonal offtake variation and maintenance at major consumers. However, ~25% of Q4 sales were achieved at a dollar premium over PPAC-notified prices.
- New gas sales agreement secured: A follow-on e-auction was completed in April, and a GSA was signed with Indian Oil Corporation at 16.2% of average Brent crude, with a ceiling of West India LNG + $1/MMBtu and a floor of $9/MMBtu. Offtake commenced on 1 May 2023.
- Pipeline to unlock pricing power: Construction of an 18-inch pipeline through a difficult forest segment has commenced and is expected to complete in 3–6 months. Once connected to the Duliajan Marketing Hub independently of Oil India's network, it will link to the Northeast gas grid, significantly enhancing market price.
- Production flexibility available: Wells and facilities can deliver ~4.5–5 crore SCFD, and workover operations can enhance capacity further if demand materializes. A material balance study using 4–5 years of production data is planned, with new reserve numbers expected to be higher than initial estimates.
Capital Allocation & Balance Sheet
- Debt reduction is a priority: Total debt has been reduced from ~₹250 crores to ~₹210 crores. Management plans to bring borrowings below ₹100 crores in FY24, split roughly evenly between short-term and long-term, and stated an endeavor to move toward a debt-free balance sheet.
- No buyback planned: Capital allocation over the next 3–4 years is focused on monetizing dormant assets (PY-1, Western region legacy assets). Dividends or buybacks will be considered only if no better inorganic opportunities arise after that monetization.
- PY-1 is the sole FY24 drilling focus: A single well is planned with an initial outlay of ~₹64 crores (~$8 million) over six months. If successful, a full three-well development program (~$42 million, or ~₹300 crores) will follow, with no need for external funding. Each well is expected to contribute at least 0.5–0.6 crore cubic feet/day of gas.
- Credit rating obtained: An 'A' rating was secured from India Rating for a ₹500 crores bank loan, providing a backstop for future funding needs.
R. Jeevanandam: "Rohit, I 100% agree with you that we more or less would like to go for a debt-free balance sheet. That will be our endeavor."
Portfolio: PY-1, Kharsang & Legacy Assets
- PY-1 redevelopment aims to unlock impaired value: The field, on which ~$380 million has been spent historically, is currently producing only ~₹2 crores in revenue (break-even). A 10-year PSC extension has been formally executed, and environmental clearance for additional wells is already obtained. Seismic data reprocessing is underway to finalize the drilling location, with drilling planned for Q4 FY24 or Q1 FY25.
- Kharsang extension in process: The PSC extension is under review at the Ministry of Petroleum and Natural Gas. An 18-well deeper prospect drilling program is planned, with HOEC's share at ~$20 million over a period.
- Cambay assets await government action: Final execution of a ring-fenced PSC for the R2 area is still awaited, though the environmental clearance process is progressing for future drilling in three marginal fields.
- PY-3 arbitration exposure is contained: The appeal at the lower court was dismissed, and the case is now in federal court in Kuala Lumpur, with a parallel case in the Gujarat High Court yet to be heard. Total exposure is ~₹17 crores.
Management: "Further it would unlock the substantial value of the assets which was already impaired in the books of accounts."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| B-80 daily revenue | Maintain constant revenue of $300,000–$350,000/day; potential to add another $50,000/day | Ongoing; reference projection for coming quarters |
| B-80 oil sales | E-auction for >200,000-barrel parcel; revenue recognition to follow | Results within 10–15 days of call (29 May 2023) |
| Debt reduction | Bring total borrowings below ₹100 crores | By FY24 year-end |
| PY-1 drilling | One well, initial outlay ~₹64 crores; seismic reprocessing first, then rig procurement | Q4 FY24 or Q1 FY25 |
| Dirok pipeline (forest segment) | Complete construction of 18-inch pipeline through forest | 3–6 months |
| B-80 booster compressors | Order placement (design by Expro underway); delivery and installation | 8–9 months |
| Tax status | Tax-free at current levels due to carryover losses and B-80 depreciation | At least 2–3 more years |
Key Metrics
| Metric | Q4 FY23 |
|---|---|
| Consolidated revenue | ₹193.4 cr, vs ₹178.99 cr in Q3 FY23 |
| Standalone revenue | ₹158.78 cr, vs ₹109.67 cr in Q3 FY23 |
| Consolidated EBITDA | ₹320.98 cr for FY23, vs ₹90.37 cr in FY22 |
| Standalone EBITDA | ₹223.17 cr for FY23, vs ₹92.49 cr in FY22 |
| Consolidated PAT | ₹194.05 cr for FY23, vs ₹20 cr in FY22 |
| Standalone PAT | ₹163.67 cr for FY23, vs ₹70.19 cr in FY22 (excluding exceptional cost) |
| B-80 gross production | >10,000 boe/day gross, ~4,100 boe/day net to HOEC |
| B-80 gas production | 1.7 crore cubic feet per day (17 MMSCFD) |
| B-80 oil production | ~1,400 barrels per day |
| B-80 gas price realized | $15.47/MMBtu in Q4, vs $13.86/MMBtu in Q3 |
| Dirok average gas sales | 3 crore standard cubic feet per day, vs 3.3 in Q3 |
| Dirok PPAC notified gas price | $7.92/MMBtu in April 2023, $8.27/MMBtu in May 2023 |
| Outstanding bank loans | ₹250.3 cr as on date, plan to bring below ₹100 cr in FY24 |
| B-80 crude oil in stock | ~260,000 barrels stored in FSO, marked to market at $78/bbl |
| B-80 daily revenue | ~$310,000/day (gas: $180,000–$190,000, oil equivalent: ~$120,000) |
| B-80 revenue threshold target | $300,000–$350,000/day, government share currently ~30% |
| FY24 CAPEX plan (PY-1 drilling) | ₹64 cr outlay, one well drilling |
| Consolidated Q4 total income | ~₹275 cr, net profit ~₹125 cr before reversal of charges |