Key Takeaways
- Record revenue, volume-led: Revenue hit INR 746 crores on 18% YoY volume growth to 100,475 tons, while PAT surged 143% YoY to INR 10.54 crores.
- Margins under steel-price pressure: EBITDA per ton held at INR 2,500–2,700 as coking coal volatility and fixed-price Jal Jeevan Mission orders compressed spreads; conversion margins themselves are intact.
- Sanand Phase 2 is the margin catalyst: Trial production has begun, commercial output starts Q3, and management targets blended EBITDA of INR 4,000 per ton once the value-added mix kicks in, subject to steel price stabilization.
- Volume guidance raised, conservatively: FY24 guided to 4.25–4.5 lakh tons, FY25 to 5 lakh tons plus, with capacity on track to hit 0.1 crore tons by FY26.
- What to watch next quarter: Whether Sanand Phase 2 ramps on schedule and delivers the promised margin uplift, the trajectory of steel prices through the seasonally strong H2, and any signal on Jal Jeevan Mission order flow beyond March.
Sanand Phase 2: The Margin Reset
- What it adds: A greenfield facility for large-diameter pipes, API pipes, solar torque tubes and special SKUs, all value-added products that carry EBITDA per ton of INR 4,000 to INR 35,000.
- Commissioning cadence: Trial production of one line has started; one additional line every month from October, with all five lines and the full 120,000 tons to be commissioned in Q3 FY24.
- API pipe entry: 50,000 tons of Sanand Phase 2 capacity is earmarked for API pipes; BIS licenses and approvals are expected in the current quarter, with revenue benefit flowing in H2 FY25.
- Solar torque tube opportunity: As solar trackers replace open sections, demand for torque tubes is rising; the Sanand facility is designed to serve both domestic and international markets.
- The capex trade-off: Capex for value-added products is roughly 2x that of normal products, while EBITDA per ton rises by less than 2x, so the return profile depends on sustained volume and stable steel prices.
Anish Bansal: "So once this Sanand Phase 2 will be commissioned, so out of this blended, it should be 4,000 tons. But then certain SKUs and verticals, we'll be getting INR5,000 per ton."
Margin Dynamics: Pressure Today, Lift Tomorrow
- What compressed spreads in H1: Steel price volatility driven by coking coal (which spiked from $250 to $370–380) and the Russia-Ukraine war; Jal Jeevan Mission orders taken on fixed pricing bore the brunt.
- Conversion margins are intact: Management clarified that the underlying conversion margin is healthy; it is raw material price fluctuation, not operational weakness, that took a toll on reported EBITDA per ton.
- October run-rate: EBITDA per ton held above INR 3,000 and is expected to move up as the value-added product share increases through H2.
- Cost levers in play: Raw material cost optimization scales with volume; solar power saves roughly INR 2 crores annually; new plants are equipped with world-class machinery securing best-in-industry deals.
- Price escalation coverage: Projects with a supply period of 3–6 months carry price escalation clauses; shorter-duration orders are generally fixed-price, which is where the risk sits.
- Jal Jeevan Mission outlook: The order book is strong until March and no slowdown is expected through that window; beyond March, visibility is limited and management will wait for election outcomes.
Anish Bansal: "So basically, there has been like a lot of steel price volatility in this H1. Steel prices are fluctuating because of the coking coal prices and, of course, due to this Russia and Ukraine war. So coking coal prices have gone up. the Jal Jeevan Mission orders that we are having, so those are on fixed pricing basis. So that takes a bit of toll."
Volume Growth & Capacity Build-Out
- H1 delivery: 18% YoY volume growth to 100,475 tons in Q2; H1 revenue up 25% to INR 1,388 crores, driven by steady government infrastructure demand.
- Demand pillars: Jal Jeevan Mission, 5G telecom network augmentation, the bullet train project, airport and railway upgradation, affordable housing, warehousing, and solar power energy.
- Private sector contribution: 5G, solar, affordable housing and warehousing are private-driven; bullet train, metro rail and NHAI projects are semi-private (L&T-led).
- Seasonal tailwind: Q3 and Q4 are historically the strongest quarters due to favourable construction climate; Q4 in particular is expected to be a "blockbuster" once the festive season ends and on-ground work resumes mid-November.
- Capacity roadmap: Brownfield expansion at Khopoli, Bangalore and Sikandrabad, funded by INR 125–150 crores of internal accruals and warrant proceeds, will take installed capacity to 0.1 crore tons by FY26.
- No slowdown expected: Management expressed high confidence in the capacity commissioning timeline and the India structural growth story, citing government mega capex toward infrastructure, railways and telecom over the next 4–5 years.
Anish Bansal: "I think Q4 will be the actual, as you said, like the blockbuster quarter will be Q4. Once this festive season gets over, I think then like mid-November onwards is actually like the work on ground that takes place."
Value-Added Products & Mix Shift
- Strategic direction: The company is adding special SKUs, installing a hot-dip galvanizing facility at Sikandrabad, entering large-diameter pipes via Sanand Phase 2, and targeting solar torque tubes in a significant way.
- FY25 target: Value-added products to reach 40–42% of the overall mix, up from the current level, with Sanand Phase 2 as the primary driver.
- B2C share stable: B2C currently close to 70% of the mix; management expects this ratio to hold roughly steady as the B2B segment also grows.
- Realization uplift: Sales realization per ton is expected to move forward as the value-added share increases, though the pace depends on steel price stabilization.
Balance Sheet & Working Capital
- Current position: Net working capital cycle days are around 40–45 days; the target is to bring this down to 30 days.
- Levers: Channel financing and dealer finance are being deployed; a pilot dealer finance book of INR 25 crores is already running with an NBFC lending to dealers at 9.5–10%.
- Cash discount terms: The company offers 1–1.5% cash discount on a 30-day credit period to incentivize faster collections.
- Once dealer finance scales: Management expects the working capital position to become quite competitive relative to peers.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Sanand Phase 2 commissioning | 120,000 tons, 5 lines, 1 line per month | Q3 FY24 (started Oct) |
| Installed capacity | 0.1 crore tons via brownfield expansion at Khopoli, Bangalore, Sikandrabad | FY26 |
| Brownfield capex | INR 125–150 crores, funded by internal accruals and warrants | Through FY26 |
| Volume guidance FY24 | 4.25 to 4.5 lakh tons | FY24 |
| Volume guidance FY25 | 5 lakh tons plus (conservative) | FY25 |
| Blended EBITDA per ton | INR 4,000, subject to steel price stabilization | Q4 FY24 onwards |
| API pipe revenue contribution | Benefit to flow | H2 FY25 |
| Value-added product share | 40–42% of mix | FY25 |
| Net working capital days | 30 days via channel and dealer finance | No date; transition underway |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Revenue from operations | ₹746 cr, +25% YoY |
| Revenue from operations (H1 FY24) | ₹1,388 cr, +25% YoY |
| Sales volume | 100,475 tons, +18% YoY |
| Sales volume (H1 FY24) | 184,964 tons, +19% YoY |
| EBITDA | ₹26.75 cr, +13% YoY |
| EBITDA (H1 FY24) | ₹47.95 cr, +15.83% YoY |
| PAT | ₹10.54 cr, +143% YoY |
| PAT (H1 FY24) | ₹18.48 cr, +109% YoY |
| EBITDA per ton | ~₹2,500 to ₹2,700 |
| EBITDA per ton (September and October) | ₹3,000 plus |
| Blended EBITDA per ton target (post Sanand Phase 2) | ₹4,000, Q4 FY24 onwards |
| Value-added products share (H1 FY24) | 29% of revenue |
| Value-added products share target (FY25) | 40% to 42% |
| Order book | In excess of ₹250 cr, Jal Jeevan Mission portion ₹75 cr to ₹80 cr |
| Net working capital cycle | 40 to 45 days, target to bring down to 30 days |
| FY24 volume guidance | 4.25 to 4.5 lakh tons |
| FY25 volume guidance | 5 lakh tons plus |
| Installed capacity target (FY26) | 0.1 crore tons, via brownfield expansion at 3 locations |
| Sanand Phase 2 commissioning | 120,000 tons in Q3 FY24, out of total 170,000 tons capacity |
| Sanand Phase 2 capex | ~₹100 cr, funded via internal accruals and equity infusion |
| Brownfield expansion capex (to 0.1 crore tons) | ₹125 cr to ₹150 cr |
| B2C share | Close to 70% |
| Dealer financing book | ₹25 cr currently, testing phase |