Key Takeaways
- PBDIT fell 11.3% YoY as a ~4% BOM cost increase from commodity and forex headwinds overwhelmed cost initiatives and muted price hikes.
- Home Appliances growth optically slowed to 10.5% but the real story is a Diwali timing shift: last year's Q2 festive schemes moved into Q3 this year, so H1 at ~14.5% is the cleaner read.
- Engineering is placing two big structural bets: a ₹103 crore Gujarat EV four-wheeler components plant (production by Sep–Oct 2027) and an in-house chain plant to bypass import restrictions, both aimed at future-proofing a division under OE margin pressure.
- The 10% EBITDA margin target is not intact and management is explicit that price hikes have been "nowhere close" to the BOM increase, with the industry cautious about outpricing itself during the festive window.
- What to watch next quarter: whether Q3 captures the shifted Diwali demand and pushes H2 growth toward the aspirational 20% full-year mark, and whether commodity/forex costs ease enough to let cost-innovation savings actually flow to margins.
Home Appliances: Growth, Mix & the Diwali Distortion
- Q2 growth was muted by a calendar shift, not demand: Diwali moved from 20 October last year to 8 November this year, pulling scheme-driven sales from Q2 into Q3. Management expects Q3 to be strong and H1 growth of ~14.5% is the better gauge of underlying momentum.
- Full-year 20% growth is aspirational, not guided: management "would like to be somewhere close to that" but is waiting to see where Q3 lands before committing.
- Mix shift toward premium is deliberate but incomplete: the company wants at least one-third of refrigerator revenue from frost-free and is pushing higher-tonnage, five-star ACs, but a product gap in 12 kg front-load washers (it plays at 11 kg) leaves it absent from a fast-growing segment.
- Market share held or improved: washer share maintained or slightly up, refrigerator and AC similar, microwave and dishwasher share increased.
- Scheme spend is being tightened, not slashed: sales promotion expenditure fell from 6.13% to 4.96% of revenue YoY in Q2, but management frames this as linking payouts to partner volume delivery, not a cost-cutting program. Partners who miss commitments get graded payouts.
Sandeep Abraham: "I believe that as long as we are fair to trade and we are not doing anything which is not fair, the trade is also fair to us, saying that, 'Okay, fine, I have given a commitment of a volume. If I have not done the volume for whatever reason, then it is fair that you do not give me the full payout.'"
Margin Pressure: The BOM Cost Overhang
- The core problem is a ~4% BOM cost increase as a percentage of net revenue, driven by commodity price hikes and adverse forex, which hit gross margins directly despite all cost initiatives.
- Price hikes were insufficient by design: management acknowledged hikes were "nowhere close" to what was needed to pass on commodity increases, citing a cautious industry approach during the festive season to avoid products becoming "completely outpriced" and triggering purchase delays or cancellations.
- Without the BOM increase, EBITDA margin would have been "somewhere close to 10%."
- Cost innovation is continuous but defensive: the company is working on inward efficiencies that will stay even after external factors ease, but for now those savings are being absorbed by the BOM headwind rather than expanding margins.
- Staff costs fell in Q2 because ~100 vacant positions were not filled and salary initiatives took effect, partially offset by annual increments and EV-related additions.
- Customer experience is the line management will not cross: features and quality will not be cut to protect margins, because the brand equity built over years is not something "the current scenario can allow us to liquidate."
Sandeep Abraham: "Our price hikes have not been in line with what was required to pass on the commodity increases."
Engineering: EV Bet, Chain Plant & OE Margin Squeeze
- Growth is concentrated in fine blanking and stampings, and management expects the pattern to continue barring an erratic market or sudden drop.
- The EV pivot is structural and timed for the disruption window: a ₹103 crore Gujarat facility for EV four-wheeler products is under construction in two phases (2026–27 and 2027–28), with manufacturing expected by September–October 2027. Product details are under NDA.
- An in-house chain plant is being set up because government guidelines had prevented chain imports, which had hurt the business. Management expects it to "considerably increase top line and bottom line from present level."
- A technology excellence center in Switzerland has been established to transfer technologies to plants, make products more cost-efficient, reduce operations, and keep the division competitive amid "tremendous pressure" from OEs to cut costs.
- Order booking stands at ₹220 crores against a ₹500 crore target, split across ICE, EV lucrative, and EV profitable business.
- No demerger is planned at this juncture: management is focused on the existing pipeline and will "definitely think about" a demerger in future if found right.
Arup Das: "We feel that disruption is on the cards with the advent of EVs. We need to prepare ourselves adequately so that we are not taken by surprise when the numbers of EVs really climb up."
Steel Division & Other Segments
- Steel division capex is complete: furnace annealing capacity has been built up from 1,500–1,700 tons to 2,800 tons per month and stabilization is in process.
- IFB Refrigeration (associate) losses widened from ₹3.23 crores to ₹6.23 crores in H1, driven by an 8–10% increase in material costs, mostly oil-based and impacted by war.
- The Tata Sanand project has received an LOI and factory construction has commenced.
Balance Sheet, Cash Flow & Capital Allocation
- Lease rent paid (principal) jumped from ₹19 crores to ₹57 crores in H1, primarily due to ~₹37 crores in lease rental for the Gujarat plant, recorded under financing activity and not in the P&L.
- Capital WIP of ~₹39.5 crores across 50–55 items is expected to be capitalized over 7–8 months; the amount to be capitalized within 3–5 months was not specified.
- Debt policy is 1:1 debt-to-equity for capex projects, which will apply to the Gujarat battery can project. Going forward, policy may change based on situation; the company has been historically cash-positive and no final decision on borrowing vs. internal accruals has been taken.
- Acquisition evaluation is active but unconcluded: over 72 companies have been evaluated against criteria of synergy with existing product lines, non-disruptive products with future growth, and a good customer base. No deal has been concluded.
- Manufacturing consolidation is not being planned as of now across the 10 facilities (multiple in Goa, Bangalore, Kolkata/Howrah).
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Engineering EV facility production start | Manufacturing to commence at Gujarat plant | September–October 2027 |
| Engineering EV plant capex | ₹103 crores, executed in two phases | 2026–2027 and 2027–2028 |
| Capital WIP capitalization | ~₹39.5 crores across 50–55 items to be capitalized | Over 7–8 months; cannot specify how much within 3–5 months (by Mar 27) |
| Engineering H2 performance | "Should be round about this level" | Barring market downtrend or adverse economic situation |
| Home Appliances full-year growth | Aspirational ~20%; currently ~14.5% H1 | FY27; Q3 outcome will determine achievability |
| 12 kg front-loader product gap | Will be tried to be rectified | No date given |
| Refrigerator mix target | At least one-third from frost-free (premium) | No date given |
| Debt policy for Gujarat Battery Can project | 1:1 debt-to-equity | General policy; final decision on borrowing vs internal accruals not taken |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue | ₹1,512 cr, +14.04% YoY |
| PBDIT | ₹90.92 cr, 6.01% of revenue vs 7.73% YoY; decline of 11.3% YoY |
| PBT | ₹53.86 cr, 3.56% of revenue vs 5.16% YoY |
| PAT | ₹39.56 cr, 2.62% of revenue vs 3.75% YoY |
| H1 FY27 Revenue | ₹3,042 cr, +15.34% YoY |
| H1 FY27 PAT | ₹77.62 cr, 2.5% of revenue vs 2.9% YoY |
| Home Appliances growth | 10.5% YoY in Q2; 14.5% in H1; full-year FY26 was 9.8% |
| BOM cost increase | ~4.3% of net revenue, driven by commodity prices and forex |
| Engineering business mix | ~50% two-wheelers, ~40% four-wheelers, ~10% electrical and three-wheelers |
| Engineering new order booking | ₹220 cr achieved against a target of ₹500 cr |
| Steel division capacity | 2,800 tons per month, up from 1,500–1,700 tons; customer mix ~60% internal, ~40% external |
| Sales promotion spend (incl CSR) | ₹75 cr, 4.96% of revenue vs 6.13% YoY |
| Share of loss from associate | ₹6.23 cr in H1 FY27 vs ₹3.23 cr in H1 FY26 |
| Capex for Gujarat EV plant | ₹103 cr, to be spent over two phases in FY27 and FY28 |
| Lease rent paid (principal) | ₹57.45 cr in H1 FY27 vs ₹18.99 cr in H1 FY26, driven by Gujarat plant lease |