Key Takeaways
- Steady quarter, guidance on track: Revenue and EBITDA grew 28% and 27% YoY respectively, driven by past acquisitions, and the trust reaffirmed it will meet its raised FY24 DPU guidance of INR14.10 per unit.
- Capital recycling in motion: IndiGrid raised INR670 crores via an institutional placement and signed a INR1,550 crore solar acquisition, while also winning two greenfield transmission projects.
- Solar hit a seasonal bump, not a trend break: Generation dipped due to unseasonal cyclones and rains, but management stated portfolio performance is broadly better than initial expectations.
- The balance sheet is being de-risked: Debt repayments of INR1,050 crores and a smoothed refinancing curve mean no more than 12% of debt matures in any single year, with reserves now exceeding one quarter's DPU.
- What to watch next quarter: The closing of the ReNew solar acquisition, the COD for Project Kallam, and the FY25 DPU guidance that management will provide at year-end.
Operating Performance & Cash Flows
- Core operations stable: Portfolio availability averaged 99.68%, with reliability metrics (line trips, substation trips) substantially better than industry benchmarks.
- Collections remain strong: 9-month entity-level collections were approximately 100%, with transmission at 94% and solar at 111% for the quarter. Solar DSO improved sharply to 88 days from 107 days a year ago.
- Solar generation dipped on weather: Cyclones in Western India and unseasonal winter rains in Southern India caused generation loss, making the quarter "a bit lower than expected." Management called it not alarming.
- Reserves buffer built: Reserves were replenished by INR34 crores this quarter, closing at INR337 crores, which is in excess of one quarter's DPU at current guidance.
- Solar portfolio outperforming initial underwriting: Across technical and commercial parameters (unit generation, degradation, collections), performance is "broadly better than expected," including the legacy FRV acquisition from 2019.
Harsh Shah: "Yes, we are getting better than what we had expected broadly, including the FRV acquisition which we first did in 2019."
Acquisitions & Growth Pipeline
- ReNew solar acquisition signed: A share purchase agreement was executed to acquire a 300 MW AC solar project for an enterprise value of approximately INR1,550 crores, with closing targeted in the coming quarter.
- Funding structure set: The ReNew acquisition will be funded through internal accruals and additional debt, with a good portion of the existing ECB continuing at the SPV level. That ECB can only be refinanced on a fully hedged basis one year from now for regulatory reasons.
- Two greenfield transmission wins: IndiGrid won two ISTS transmission projects via TBCB with approximately INR1,000 crores in total capex, to be developed on a BOOT basis with a ~35-year concession period post-COD.
- Battery storage entry: A 20 MW/40 MWh Battery Energy Storage Purchase Agreement was signed with BSES Rajdhani in New Delhi, with execution now underway.
- Near-term execution focus: Project Kallam, won 18 months back, is expected to achieve COD this quarter, alongside augmentation work across existing assets and the newly won transmission projects.
- No AUM target, sector caps instead: Management does not operate with a specific AUM growth target and has no special thrust on any one sector, viewing transmission, solar, and battery storage equally. The binding constraint is a planned cap of approximately 25% for solar.
Harsh Shah: "We do not work under target of a particular AUM to be achieved."
Capital Management & Balance Sheet
- Institutional placement completed: INR670 crores was raised, largely subscribed by long-term unitholders, bringing total capital raised over the last nine months to approximately INR1,070 crores.
- Debt cost and structure: The average cost of debt stands at 7.6%, with fixed-rate borrowings at roughly 79%. INR1,050 crores of debt was repaid during the quarter.
- Refinancing risk smoothed: The refinancing schedule has been structured so that no more than 10-12% of debt comes up for renewal in any single financial year.
- AAA rating maintained: IndiGrid continues to be rated AAA by all three rating agencies.
- NAV sensitivity undisclosed: When asked for the sensitivity of NAV to a 25 bps interest rate move, management declined to provide a table, stating it "wouldn't be accurate" and "wouldn't be fair," though noted all data is publicly available for investors to construct their own models.
Portfolio Strategy & Guardrails
- Solar cap is a hard limit: Management confirmed a plan to restrict solar to approximately 25% of the portfolio, and will not acquire incremental assets if at that cap.
- No peer benchmarking provided: When asked to benchmark its 20 solar plants against peers on key metrics, management deflected, citing different vintages (1 to 12 years operational) and geographies (16-18 sites) that make an "apple to apple" comparison impossible.
- Internal restructuring underway: A process approved by unitholders is reducing the number of legal entities from 38 to simplify operations and the corporate structure.
Harsh Shah: "Yes. Yes. We plan to do, plan to restrict approximately 25% to solar. That's the plan."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| DPU delivery | Meet revised increased DPU guidance of INR14.10 per unit | FY24 |
| ReNew solar acquisition | Close the transaction for the 300 MW AC solar project | Coming quarter |
| Project Kallam COD | Achieve commercial operation date | This quarter |
| Portfolio availability | Maintain minimum 99.5% availability across the portfolio | Ongoing |
| Solar portfolio cap | Restrict solar to approximately 25% of the portfolio | Ongoing |
| Next year DPU guidance | Provide FY25 DPU guidance | At year-end |
Key Metrics
| Metric | Q3 FY24 |
|---|---|
| Revenue | ₹754 cr, +28% YoY |
| EBITDA | ₹681 cr, +27% YoY |
| NDCF generated | ₹312 cr |
| DPU | ₹3.55 per unit, +7.5% YoY |
| FY24 DPU guidance | ₹14.10 per unit, revised upward |
| NAV per unit | ₹130.1 as of Dec 31 |
| AUM | ~₹26,700 cr |
| Net debt to AUM | 61.6% |
| Average cost of debt | 7.6% |
| EBITDA to interest coverage ratio | 1.94x |
| Transmission availability | 99.68% |
| Solar CUF (AC) | 18.9% |
| Transmission collections | 94% for Q3, ~100% for 9M |
| Solar collections | 111% for Q3, ~100% for 9M |
| Transmission DSO | 63 days as of Dec 31, improved from 107 days a year ago for solar |
| Solar DSO | 88 days as of Dec 31 |
| Gross borrowings | ~₹17,700 cr, 52% NCDs and 48% bank loans |
| Fixed rate borrowings mix | ~79% |
| Cash balance (incl. distribution and DSRA) | ~₹1,382 cr |
| Closing reserves | ₹337 cr, excess of one quarter DPU |
| DPU distribution composition | ₹2.95 interest, ₹0.56 capital repayment, ₹0.04 other income per unit |
| Outstanding units | 78.37 cr |
| Gross distribution to unitholders | ₹278 cr |
| Cumulative distribution since inception | ₹82.41 per unit, total ~₹4,667 cr |
| Distribution YoY growth | 4% |
| ReNew solar acquisition enterprise value | ₹1,550 cr, ECB ~₹1,000 cr, balance equity |
| Institutional Placement raised | ₹670 cr in Q3, ~₹1,070 cr in 9M |
| Debt repaid in Q3 | ~₹1,050 cr |
| Capex payables (earn-outs/holdbacks) | ~₹150 cr to ₹200 cr across portfolio |
| Solar portfolio cap | ~25% of total assets |
| Peak power demand | 213.5 GW, +10% YoY |
| Solar generation | 22.9 cr units |
| Transmission trips per line | 0.11 |
| Substation trips per element | 0.01 |
| Greenfield ISTS projects won (capex outlay) | ~₹1,000 cr for 2 projects |
| Battery storage capacity signed (BESPA) | 20 MW / 40 MWh in New Delhi |
| Legal entities pre-restructuring | 38, reduction underway |
| Residual contractual life – transmission | 26.5 years |
| Residual contractual life – solar | ~18 years |
| Refinancing concentration limit | Not more than 10–12% in any financial year |