Key Takeaways
- Strong headline growth, cost front-loading masked it: Revenue grew 16.7% YoY and PAT grew 18.9%, but EBITDA excluding other income rose only 8.2% as employee additions and the Savli plant ramp-up pulled forward costs ahead of revenue.
- LNG segment is scaling toward a step-change: The company is expanding serial production to 5,000-6,000 tanks/year and sees demand reaching 30,000-40,000 tanks in 3-5 years, with regulatory tailwinds now allowing LNG as a transport fuel and fueling stations next to petrol pumps.
- A ₹145 crore ITER order landed, but it is one-off: The Cryostat Thermal Shield win follows the VVTS project and spans nearly 2 years; ITER is interested in giving more orders, but this specific scope will not repeat.
- The U.S. tariff story is contained for now: Tariffs apply only on the steel component of cylinder cost, not on overheads or margins, and new DOT 39 approvals for A12, helium and R32 cylinders are opening additional volume of 5-6 lakh cylinders.
- What to watch next quarter: Whether the Savli plant stabilisation delivers the promised margin recovery, the pace of LNG station build-out now that regulatory barriers have eased, and any quantification of keg orders once Asahi and Carlsberg audits conclude.
LNG: The Volume Bet Is Becoming Concrete
- Production capacity is scaling fast: The company is augmenting its serial production line at Kalol to around 500-600 tanks a month, or 5,000-6,000 units a year, and is already reviewing an extra facility to meet anticipated demand of 30,000-40,000 fuel tanks in 3 to 5 years.
- Regulatory clearance unlocked the market: Statutory authorities have now permitted LNG as fuel for mobile pressure vessels in cryogenic applications, and a new PESO rule allows fueling stations next to petrol pumps, a change management calls a game-changer for station density.
- Demand is coming from multiple directions: The company supplied approximately 145 tanks to major OEMs this quarter, qualified with Blue Energy (the largest OEM) for substantial supply this year, and sees logistic companies initiating their own fueling stations at their premises.
- Corridor coverage is improving: At least one LNG fueling station now exists every 400 km along key corridors, and truck OEMs are innovating with dual 990-litre tank configurations for 2,000 km range, reducing dependency on station density.
- The transition-fuel thesis has an 8-10 year runway: Management sees hydrogen as commercially unviable for now and positions LNG as the winner for the next decade, with growth expected above 20% driven by OEMs, marine equipment and small-scale LNG terminals.
Deepak Acharya: "So LNG is going to be a winner for next 8 to 10 years in our opinion and that will be a transition fuel over a period of time."
Margins: Growth Is Expensive Right Now
- Costs are front-loaded relative to revenue: Despite gross margin expansion, EBITDA excluding other income grew only 8.2% because of employee additions, the Savli plant ramp-up (manpower onboard but not yet at 100% revenue), and a keg business that is increasing but still below internal expectations.
- Savli is the main drag with a clear path to improvement: The plant did approximately ₹200 crores last year and is targeting ₹300-350 crores this year; stabilisation is expected to take 6 months to 1 year, with profitability improving as more than 150 tanks currently under construction are completed.
- Competitive pressure caps margin expansion: Management is explicit that increasing EBITDA margin is not possible given worldwide competition, so the strategy is to hold fixed margins on new quotes and grow the customer base to increase absolute sales.
- Industrial Gas carries its own seasonal drag: Q1 is always slow because site work decelerates during the monsoon in India; projects are decided in this period and start moving from Q2 or Q3 onward.
Pavan Logar: "Increase in EBITDA is not possible considering the worldwide competition. Moreover we have to increase our customer base to increase the sales. That's why we are keeping the fixed margins in all the new quotes."
ITER & Cryo Scientific: A Large but Lumpy Order Book
- The ₹145 crore Cryostat Thermal Shield order is a one-off: The scope is similar to the Vacuum Vessel Thermal Shield panels but smaller in size, with about 10% of very large panels to be done at the ITER site using INOX's own manpower; the project spans nearly 2 years.
- ITER is interested in giving more orders: The VVTS project involved a failure from some other countries, so ITER is relying on India for refurbishment; management expects a few more orders in the next few quarters, though none will repeat the Cryostat Thermal Shield scope.
- Other fusion-adjacent opportunities are in play: The company is bidding for FAIR projects with only 1 or 2 competitors and is hopeful of winning, and sees a better chance at the third launch pad because it executed the second one, where cryogenic contribution is around 20%.
- On-site presence is already built: 25-30 personnel and a few engineers are already working at the ITER site for erection and commissioning of VVTS panels, creating continuity for the new scope.
Deepak Acharya: "Yes, you are correct, it's a one-off is kind of order because it is not going to happen again and again. But looking to our performance, ITER is very much interested to give more and more orders to us."
Industrial Gas & New Products: Steady Base, Niche Breakthroughs
- The segment grows steadily, not explosively: Management expects conventional growth of around 8-10% plus an additional 5-6% from new products, with overall IG growth improving over time but not matching the pace of LNG or Cryo Scientific.
- India's first ultra-high purity ammonia ISO containers were dispatched: Two units delivered to IAPL for the semiconductor and solar panel sector, with 10 more under construction and certified by DNV as IMO and ISO containers.
- CO2 battery storage is a small but strategic entry: The company developed and launched India's first CO2 battery storage application for long-duration energy storage and received an order from an Italian company for a project in India; if successful, bigger projects are expected to follow.
- U.S. disposable cylinder demand is holding despite tariffs: The U.S. contributes 10-12% of revenue, mostly from disposable cylinders where only one domestic manufacturer exists with limited capacity; management sees no decline in orders and the tariff applies only on the steel component, not on overheads or margins.
- New DOT 39 approvals expand the U.S. product range: Approvals for A12 cylinders, helium cylinders and R32 gas cylinders are expected to bring additional business of 5-6 lakh cylinders.
Deepak Acharya: "Tariff is a very tricky issue. Every day, it is changing. So it is very difficult to say what's going to happen."
Beverage Kegs: Approvals Are Coming, Volume Is Not Yet
- Heineken global approval is a hard-won credential: The audit was cleared on the first attempt, which management notes is very difficult to achieve, and post-approval engagement has begun with local players across South America, Australia and South Africa.
- Asahi and Carlsberg audits are the next catalysts: Both are scheduled for September/October, with management hoping for substantial orders in the next season; new distributors have also been appointed in the UK, Germany and the U.S.
- Current volumes are still below internal expectations: The business received an order of ₹6.4 crores in Q1 versus ₹2 crores in the previous quarter, and meaningful orders from a German company have come in for Q2, but the ramp-up is gradual.
- The 3-4 year vision is 3-4x the current size: Management declined to quantify near-term revenue contribution when asked about a 5-10% revenue scenario for FY26, citing the tender-based nature of the business.
Deepak Acharya: "I was told it is very difficult to get this audit cleared, but we are happy to inform you that INOX India has done it on the first go."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | Target turnover increase of about 18% to 20% this year; growth should be similar to last 3 years, even higher | FY26 |
| Savli plant stabilisation | Profitability to improve as unit stabilises; stabilisation will take around 6 months to 1 year | FY26-FY27 |
| LNG fuel tank production capacity | Augmenting serial production line to 5,000-6,000 units per year at Kalol; extra facility under consideration for 30,000-40,000 tank demand | 3-5 years |
| ITER Cryostat Thermal Shield | Project to span nearly 2 years; a few more orders expected from ITER | Next few quarters |
| Beverage keg approvals | Asahi and Carlsberg audits scheduled for September/October; substantial orders hoped for in next season | Q2-Q3 FY26 |
| Keg business scale | 3 to 4 times current size | 3-4 years |
| Highview Power follow-on orders | 4-5 projects in pipeline; discussions to start after first project delivery (end of January or February) | Beginning of next year |
| Mini LNG terminals | Discussions ongoing with majority of projects coming up; something should happen | Beginning of next year |
| SMR (Small Modular Reactors) | Working with government and foreign companies; very slow process | At least 3-4 years |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Revenue | ₹352 cr, +16.7% YoY |
| EBITDA | ₹89 cr, +19.4% YoY |
| Profit after tax | ₹61 cr, +18.9% YoY |
| Revenue growth guidance | 18% to 20% for FY26 |
| Order backlog | ₹1,457 cr, with 63% exports |
| Order backlog mix | 45% Industrial Gas, 32% LNG, 23% Cryo Scientific |
| Order inflow | ₹415 cr during Q1 |
| Order inflow mix | 44% Industrial Gas, 20% LNG, 35% Cryo Scientific |
| Revenue mix | 48% Industrial Gas, 29% LNG, 19% Cryo Scientific |
| LNG fuel tanks supplied | ~145 tanks to major OEMs during the quarter |
| LNG fuel tank capacity target | 500–600 tanks per month, or 5,000–6,000 units per year |
| Beverage keg orders | ₹6.4 cr in Q1, up from ₹2 cr in Q4 FY25 |
| Cryostat Thermal Shield order | ~₹145 cr, spanning nearly 2 years |
| Capex target | ~₹80 cr for FY26 |