Key Takeaways
- Record quarter, broad-based strength: Revenue grew ~16% YoY to the highest ever, with EBITDA up 18% and PAT up 22.9%, driven by robust order inflows and a favourable business mix shift toward higher-margin LNG and Cryo Scientific segments.
- Gross margins jumped 500 bps in H1: The mix improvement is structural, not a one-off, as LNG and Cryo Scientific carry better margins than Industrial Gas, and management expects this trend to hold.
- The order book is building a multi-year growth story: Fusion Energy alone is expected to add INR500–600 crores over 5 years, while semiconductor, space launch, and LNG fuel tank opportunities are still in early innings.
- Kegs are at an inflection point: Major brewery approvals are imminent, with Heineken and AB InBev decisions expected within weeks; once those clear, other breweries typically follow without further scrutiny. The FY26 target of 100,000 kegs is on track.
- What to watch next quarter: Whether the Carlsberg/Asahi audit results (due late November/early December) unlock the next leg of keg orders, whether the promised large Cryo Scientific and LNG orders materialize, and the pace of LNG station build-out, which management admits is slower than expected.
The Mix Shift Driving Margins
- 500 bps gross margin improvement in H1 came from business mix change, not one-off cost cuts: LNG and Cryo Scientific segments carry structurally higher margins than Industrial Gas, and their share of revenue is rising.
- Consolidated EBITDA margin is guided in a 20%–24% range, and management declined to break out margins product-by-product, but confirmed that newer, high-specification areas like semiconductor equipment must carry healthy margins to sustain the overall business.
- Industrial Gas remains the volume backbone at 50%–60% of business coming from project jobs, but the growth vector is shifting toward the higher-margin Cryo Scientific and LNG segments, where order inflows are accelerating.
- Raw material sourcing is largely domestic (85%–90% from JSW, Jindal, AMNS), with only certain projects requiring non-Indian origin material from Japan or Korea, limiting import-related margin volatility.
Acharya: "These are the areas which are of recent thing. So if we don't maintain our margins in such type of projects, how can we manage the whole show."
Kegs: The Brewery Approval Cascade
- The approval logic is sequential and self-reinforcing: once Heineken and AB InBev approve, other breweries typically follow without further difficulty, per management's experience. Carlsberg and Asahi audits, originally planned for September/October, have moved to January, with sample test results expected by late November or early December.
- Orders are already flowing from the first wave: a 30,000-keg order from a German company is underway, with the first batch dispatched and the remainder scheduled post-customer trials in November. A nonstandard keg order from another German customer has also been received.
- Management has bid for over 0.05 crore kegs across major global breweries including Heineken, AB InBev, and Paulaner, and expects substantial orders within 15–20 days to a maximum of one month. The FY26 target of 100,000 kegs is on track, with an aspiration to do 100,000–150,000 this year.
- Breweries split orders across 2–3 vendors for reliability and logistics, so even if Inox prices are lower, they will not capture the entire requirement, a structural ceiling on share gain that tempers the upside.
Acharya: "once they normally, what I understood is the major breweries like Heineken and AB InBev approves, other breweries have very little to say and they approve the product without any difficulty"
Fusion, Space & Semiconductor: The Science-to-Revenue Pipeline
- Fusion Energy is now a credentialed, multi-year revenue stream: Inox has established itself as a good-quality supplier approved by the majority of Fusion Energy experimentation work, has obtained ESPN approval, and expects INR500–600 crores of additional business over the next five years, or roughly INR100–150 crores annually. Two major ITER refurbishment contracts were received this quarter, and a new heater project order is expected to be finalized in Q3 FY26.
- Space launch is transitioning from solid to liquid propellant globally, and Inox is targeting all of the 40-plus launch pad operators making that shift. A very large order from a U.S. space company was received this quarter, and management says this is not a one-off: two large 1,500-metric-cube cryogenic vessel orders from a leading U.S. aerospace company were also booked.
- Semiconductor is the widest-aperture opportunity but the hardest to size: Inox has supplied to Micron (U.S. and Dholera), Foxconn (Bangalore), Tata (Assam), and an Air Liquide/Dresden project in Europe, and carries the full product range (storage tanks, vaporizers, piping screens, hydrogen tanks). A 90KL liquid hydrogen storage tank order from a European semiconductor customer was secured this quarter. Management is "very bullish" but calls the total opportunity size "a big question" and says the 3–5-year revenue mix is too early to estimate.
- ISRO involvement spans the full launch lifecycle: Inox supplied the thermal vacuum chamber where the CMS03 satellite was tested, acoustic testing equipment in Bangalore, and all ground equipment for the cryogenic and gas system at Sriharikota. An RFQ is expected by December end, with a potential order by year-end if everything proceeds quickly.
Acharya: "we have established our name as a good quality supplier, and we are now approved by majority of the Fusion Energy experimentation work. And we have got the ESPN approval also."
LNG: Diverging Speed Across Sub-Segments
- LNG fuel tanks are the structural growth story: management expects this segment to reach at least 25%–30% of revenue over the next 3–5 years, supported by capacity expansion to scale production up by 10x, favourable regulatory changes, and rising domestic and export demand. Inox caters to almost all Indian OEM manufacturers (Blue Energy, Tata Motors, Ashok Leyland, Volvo), and post-GST cut, automobile inquiries have picked up well with Tata pushing hard for LNG trucks.
- LNG stations are the disappointment: adoption is "not picking up that fast to our expectation," per management. Private players like Ultragas and Green Line are putting up roughly 100 stations in due course, and at least 10–15 more are expected by year-end, but the pace is slower than hoped. Two satellite LNG power station projects from small island nations near the Bahamas were secured this quarter, and those will require IMO tanks for servicing small stations.
- Southeast Asian LNG projects are in the bidding pipeline for Indonesia, Philippines, and Andaman & Nicobar, with management hopeful that at least one will materialize by the end of Q3.
- Two-tank configurations are better for revenue than a single large tank: drivers prefer two 450-litre tanks (900 km total range) for operational awareness of empty-tank status, and OEMs are not yet ready for bigger single-tank installations due to chassis design constraints.
Acharya: "LNG station somehow is not picking up that fast to our expectation"
Order Book & Execution Visibility
- Record order backlog supports H2 revenue of roughly INR800–900 crores over the next two quarters, with approximately 60% of the current backlog scheduled for completion in H2 and the balance carried forward. Large projects typically execute over 12–18 months from the Kandla facility.
- Monthly order inflow is running at INR150–160 crores, which if sustained would put the backlog in the INR1,500–1,600 crore range. Management is confident of achieving full-year targets for both order book and revenue, noting that H1 is seasonally only 43%–45% of the annual total, with Q3 and Q4 typically much stronger.
- Large orders expected in Cryo Scientific and LNG were originally anticipated in Q2 but slipped; management now expects them by end of November. The Highview project is on track for January first-week delivery, with all tanks tested and final painting underway, and inquiries for future Highview projects are already under evaluation.
- Contract pricing protects against input cost swings on large orders: small orders are fixed-price, but big orders stretching a year or more carry a price escalation formula built in.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Kegs volume target | Achieve 100,000 kegs for FY26 | FY26 |
| Kegs order conversion | Substantial orders from Heineken, AB InBev, Paulaner | Within 15–20 days to max 1 month from call date |
| Carlsberg/Asahi sample results | Test results expected | End of November or first week of December |
| Large Cryo Scientific/LNG orders | Orders that slipped from Q2 to materialize | End of November |
| Next ITER order | New heater project assignment finalized | Q3 FY26 |
| Fusion business | INR500–600 crores additional business, ~INR100–150 crores annually | Over next 5 years |
| LNG fuel tank revenue share | At least 25%–30% of revenue | Over next 3–5 years |
| H2 revenue | INR800–900 crores | Next 2 quarters (Q3 and Q4 FY26) |
| ISRO order | RFQ expected; order possible if process moves fast | RFQ by December end; order by year-end |
| Southeast Asian LNG projects | At least one project to materialize | By end of Q3 FY26 |
| Highview delivery | All tanks delivered | January first week, possibly earlier |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Total income | ₹371 cr, +16% YoY |
| EBITDA | ₹92 cr, +18% YoY |
| PAT | ₹62 cr, +22.9% YoY |
| H1 FY26 total income | ₹723 cr, highest ever H1 revenue |
| H1 FY26 EBITDA | ₹180 cr, highest ever half-year EBITDA |
| H1 FY26 PAT | ₹122 cr, +20.9% YoY, highest ever |
| Order backlog | ₹1,485 cr, up from ₹1,457 cr in Q1 FY26; 63% exports, 37% domestic |
| Order backlog composition | 45% Industrial Gas, 31% LNG, 23% Cryo Scientific |
| Revenue mix | 57% Industrial Gas, 25% LNG, 13% Cryo Scientific |
| Total fund availability | ₹221 cr as of Q2 FY26 |
| Monthly order intake run-rate | ₹150–160 cr |
| Disposable Cylinder H1 production | ~0.05 cr cylinders, internal target 0.2–0.25 cr for FY26 |
| IMO tanks under construction | 90–95 tanks |
| Semiconductor order book | 8–10% of total revenue |