Key Takeaways
- Catering and tourism drove the top line: Revenue growth was led by these two segments, while internet ticketing showed resilience and tourism swung back to a positive EBITDA margin of 3.6%.
- Catering margin jumped on premium trains: Segment EBIT margin rose to 17.2% from 14.6% QoQ, helped by new Vande Bharat trains with assured, higher-margin catering business, even as seasonal cancellations reduced expenditure.
- Seasonal QoQ dips are normal, not structural: Catering revenue fell 10% QoQ and Rail Neer volumes declined because Q2 is a lean travel period; management expects a festive-season rebound in H2.
- New mandates are incremental but unquantified: IRCTC won the FTR train catering mandate and launched a Zomato pilot at ₹40 per order, yet management declined to size either opportunity, calling both too early to call.
- What to watch next quarter: Whether the Zomato pilot shows enough volume to justify a Pan-India rollout, the pace of realization on the retrospective license fee, and any progress toward Tejas breakeven after concession withdrawals.
Segment Performance
- Catering revenue dipped seasonally: The 10% QoQ decline is a normal Q2 pattern (lean season vs. summer peak in Q1), compounded by train cancellations from infrastructure work on Indian Railways.
- Catering margin improved despite lower revenue: Margins moved from 14.6% to 17.2% because expenditure is directly linked to the number of trains served; more cancellations meant fewer trains served, which reduced costs proportionally. The addition of 11 pair of Vande Bharat premium prepaid trains, which carry assured catering business and better margins, also helped.
- Internet ticketing revenue jumped 13% sequentially: This was driven by the 120-day advance reservation period, meaning festive-season travel tickets were booked during Q2. The segment also demonstrated resilience after the conversion of reserved tourist tickets back to unreserved during the pre-pandemic period.
- Tourism swung to a positive EBITDA margin of 3.6%: This was a turnaround from a loss both QoQ and YoY, driven by strong revenue growth.
- Rail Neer volumes are demand-linked, not capacity-constrained: Production is running at 12 lakh liters per day against 16 lakh liters per day of capacity. The H1 revenue decline is seasonal (Q2 sees fewer passengers than Q1), not systemic, and a festive-season jump is expected in Q3.
- Tejas revenue fell and profitability remains elusive: Q2 revenue of ₹33.98 crore was down from ₹45.88 crore in Q1. Management confirmed the venture has not broken even and is now realigning expenditure contracts after the Ministry of Railways withdrew concessions.
Seema Kumar: "We are working towards it, because now whatever concessions are given by the Ministry of Railways, they have withdrawn all those concessions. Now, we are re aligning our expenditure contracts to make it a profitable venture."
New Mandates & Pilots
- FTR train catering mandate won: IRCTC will now manage catering in all coaches and trains booked on full tariff rate. Roughly 100 such trains ran last year, but management declined to size the incremental revenue opportunity, saying it will share details only by year-end or during later discussions.
- Zomato pilot launched at five stations: A six-month pilot MoU started in October, charging Zomato a lump sum of ₹40 per order (₹16 to railways). The model is volume-dependent rather than a percentage of order value, and management will assess earning patterns over the pilot period before deciding on a Pan-India rollout.
- Train-side vending pipeline: Roughly 200-odd contracts are in the pipeline for trains already running where IRCTC has yet to provide services.
Seema Kumar: "Actually, in the next quarter, picture will be clearer, how much volume Zomato is bringing to us and how much are the earning patterns. That is why pilot has been limited to five stations for a six month period to understand how this model will work which is dependent on the volumes rather than percentage value of each order."
License Fee & One-Time Gains
- Retrospective license fee revision complete: The exercise for pre-book meal trains (Shatabdi, Rajdhani, etc.), as per 2019 rates, is finished and bills have been raised. Some court cases are registered and realization is in process.
- One-time gain will be booked on realization: The retrospective benefit from 2019 will be registered as a one-time gain only when cash is received. Current-quarter revenues reflect only the prospective license fee.
Growth Drivers & Constraints
- Vande Bharat is a multi-year tailwind: Roughly 450 Vande Bharat trains are expected in coming years, and these premium prepaid trains carry assured catering business with better margins.
- Internet ticketing growth is tied to railway capacity: Growth depends entirely on new train additions by Indian Railways, over which IRCTC has no visibility or control. Management declined to provide the quantum increase in ticket inventory, calling it a matter for detailed discussion.
- Tourist category contribution is now negligible: The Board withdrew the mandate given during COVID, reducing this category to very little in internet ticketing.
- UPI transaction share reached 38-39%: UPI adoption continues to rise, with 4.53 crore UPI tickets in the quarter, up 2% QoQ and 7% YoY.
- No competitive product on free cancellation yet: Management acknowledged market trends but said nothing has been fructified or thought of right now regarding a free cancellation or trip guarantee product.
Seema Kumar: "If you see UPI transition share, I think one more caller had asked earlier. It is increased continuously. If you see transaction share has grown to 38-39%, UPI transaction."
Capacity Expansion
- Kota Rail Neer plant commissioned: The plant came online on 19th October, within Q2 FY24.
- Two more plants expected in Q3: The Bhubaneswar and NTPC-Simhadri Rail Neer plants are likely to be commissioned in Q3 of this year.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| H2 performance | Second half of FY24 expected to be better than first half, driven by festive seasons and efforts in Tourism and special trains | H2 FY24 |
| Zomato pilot evaluation | Picture on volumes and earning patterns will be clearer; decision on Pan-India expansion follows pilot success | Next quarter (Q3 FY24) |
| FTR opportunity sizing | Details on number of trains run and size of the pie to be shared via mail | By year-end or during course of discussion |
| Bhubaneswar & NTPC-Simhadri Rail Neer plants | Likely to be commissioned | Q3 FY24 |
| Tejas profitability | Working to make it a profitable venture by realigning expenditure contracts after concession withdrawals | No timeline given |
| Train-side vending contracts | Roughly 200-odd contracts in the pipeline for trains already running | No timeline given |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Revenue | ₹995.3 cr, +23.5% YoY and almost flat QoQ |
| EBITDA | ₹366.6 cr, new high |
| Net profit | ₹294.67 cr, +30.36% YoY; highest ever quarterly profit |
| Consolidated EBITDA margin | 36.8%, vs 37.8% YoY and 34.2% QoQ |
| Interim dividend | ₹2.5 per share, 125% of paid-up share capital of ₹160 cr |
| Cash and bank balances | ₹2,026 cr |
| Net worth | ₹2,846 cr |
| Catering revenue | ₹431.5 cr, +29% YoY and -10% QoQ; run rate 9% above best quarter of FY23 |
| Catering EBITDA margin | 17.2%, vs 14.6% QoQ and 10.6% YoY |
| Internet Ticketing revenue | ₹327.5 cr, +9% YoY and +13% QoQ |
| Internet Ticketing EBITDA margin | 83.7%, vs 82.7% QoQ and 84.2% YoY |
| Convenience fee revenue | ₹220.98 cr, +10% YoY and +11% QoQ |
| Tickets booked | 11.64 cr, vs 10.69 cr in Q2 FY23 |
| UPI transaction share | 38–39% of tickets booked |
| Tourism and State Teertha revenue | ₹161.4 cr, +63% YoY and +13% QoQ |
| Tourism and State Teertha EBITDA margin | 3.6%, vs loss both QoQ and YoY |
| Rail Neer revenue | ₹78 cr, +4% YoY and -19% QoQ |
| Rail Neer EBITDA margin | 12.9%, vs 7.5% YoY and 13.2% QoQ |
| Rail Neer production | ~12 lakh litres per day, capacity 16 lakh litres per day |
| Mobile catering revenue | ₹371.16 cr, +26.7% YoY |
| Static catering revenue | ₹55.90 cr, +65% YoY |
| Total train pairs served | 1,284 pairs, up from 891 pre-COVID |
| Vande Bharat trains served | 34 pairs, up from 12 earlier in the year |
| Tejas revenue | ₹33.98 cr, vs ₹45.88 cr in Q1 FY24 |