Key Takeaways
- Revenue surged 76% YoY on copper volume growth and the initial contribution from value-added copper products, though EBITDA margin compressed to ~4% as the new product mix ramps up.
- The margin story is a mix shift, not a structural decline: copper EBITDA per tonne dipped to ₹31,000 on quarterly timing effects, while lead margins were squeezed by West Asia-driven raw material shortages; management expects value-added products to lift copper margins by ₹25 per tonne once stabilized.
- A fatal furnace incident and geopolitical disruption tested operations: a one-week shutdown at Gummidipoondi Unit-2 and material worth ₹20-30 crores stuck at Dubai port were both contained, with insurance recovery expected and no material production impact.
- The project pipeline is dense and near-dated: copper cathode, busbar, profiles, antimony, plastic recycling, and the Ahmedabad JV all target commissioning between Q2 and Q3 FY27, setting up a second-half volume and margin inflection.
- What to watch next quarter: whether copper anode production scales toward the 1,600-tonne target, the pace of value-added product stabilization, and any easing of West Asia supply chains that would unlock pent-up raw material flows.
Copper Value-Addition Rollout
- Anode production began, still stabilizing: both furnaces commissioned and ~600 tonnes of copper anodes sold in Q1; management targets 1,600 tonnes per month as operations settle, with a meaningful EBITDA contribution expected only from Q2 onward.
- Cathode facility imminent: the 750-tonne copper cathode plant is almost installed and will be commissioned in about a month, with immediate volumes expected once it starts; Phase-1 installed capacity will be 1,500 tonnes per month.
- Busbar and profiles to lift margins: copper profile and busbar production lines are being added and, when running at full swing, will add approximately 2% to existing copper margins on the volumes processed through value-added plants; overall copper EBITDA per tonne is expected to rise by roughly ₹25 after stabilization, though which quarter it stabilizes cannot be predicted now.
- Customer qualification underway: in-principle go-ahead received from many new customers, mostly from segments different from the existing client base, de-risking the offtake profile.
- The margin measurement caveat: management stresses that percentage EBITDA margin is not the right lens for this business; the relevant metric is EBITDA per tonne, and quarterly fluctuations are inherent because raw material procurement and finished product sales span a six-month cycle that requires reading results on a two-quarter combined basis.
Kamlesh Jain: "The problem is that in this business, you can't see one quarter of it or one quarter EBITDA margin... you have to always see two-quarter combined result, it will match."
Lead: Margin-Volume Trade-Off and Raw Material Stress
- West Asia crisis hit lead margins directly: the war disrupted raw material supplies, forcing the company to purchase expensive material locally and import at higher cost to meet production targets, compressing lead segment margins.
- Volume growth comes at a margin cost: management acknowledges that when increasing lead capacities, it must compromise a little on margin to secure more raw materials, accepting lower unit profitability for higher absolute profit and revenue.
- India sourcing rose substantially in response: in-house and local India sourcing increased as a direct consequence of the West Asia disruption, building a domestic supply network that management believes will become a structural advantage.
- Stuck material is insured, not lost: material worth ₹20-30 crores is held up in a vessel at Dubai port, fully insured against war risk; the insurance company will pay if the material is not received within a certain period, and no detention or damage is expected to come to the company.
Kamlesh Jain: "So, more the volume, higher the volume, little lower margin to get a better profits and the better revenue overall."
Project Pipeline and Capacity Build-Out
- Five projects targeting FY27 commissioning: copper cathode (Phase-1) in Q2; copper wire rod, copper busbar and profiles, antimony, and the plastic recycling facility all in Q3; the Ahmedabad JV is expected to stabilize during Q2.
- Lead capacity expansion near completion: the project is almost done and awaiting approval; it will add 15-20% to existing lead capacity once operational.
- Kuwait strategic investment delayed by geopolitics: machinery is ready for dispatch but shipment is impacted by the West Asia situation; subject to normalization of shipping conditions, contribution is expected from Q3 FY27 onward.
- Plastic recycling land secured: approximately six acres finalized for a dedicated plastic recycling facility, expected operational in Q3 FY27.
- Telecom infrastructure diversification approved: shareholders approved a new object clause to enter telecom infrastructure, specifically laying optical fiber cable incidental to existing copper cable removal contracts; management sees potential but has not quantified revenue or margin expectations.
- Total FY27 capex: approximately ₹87 crores, majority directed toward ongoing copper value-added projects, antimony, and plastic recycling facilities.
Regulatory Tailwinds and Raw Material Outlook
- Hazardous waste management rule creates a demand floor: the mandate for 5% recycled content starting FY28, rising to 10% in subsequent years, will increase demand for recycled material and push domestic scrap into organized recycling; management expects this to add both volumes and some margin.
- Battery waste rules already tightening supply: manufacturers are now mandated to ensure end-of-life batteries are recycled by registered recyclers, increasing domestic availability of recyclable scrap.
- West Asia crisis may become a blessing in disguise: once the situation settles, tons of material ready for recycling is expected to flow from Kuwait, Saudi Arabia, and other Middle East countries where metal has piled up for two years; alternate ports are opening in the region, and the local sourcing network developed during the crisis will persist.
- India sourcing expected to increase month-on-month: the domestic procurement base built during the disruption is structural, not temporary.
Kamlesh Jain: "This will actually become a blessing in disguise and in the longer run where more metal is expected because we develop a huge network of local now, and then we are expecting more metal."
Risk Management and Operational Resilience
- 100% hedge model maintained, no speculation: management flatly denied any deviation from full hedging, stating it is a tool to protect business margin in a high-volume, lower-margin model, not a cost factor; broker limits are approximately more than $30 million and most of the time no cash is blocked for mark-to-market variation margin.
- Unit-2 furnace incident contained: the 14th July accident at Gummidipoondi resulted in one fatality and injuries; operations resumed 27th July after regulatory approval; the one-week closure is not expected to materially impact production and will be covered within the current year run; an insurance claim is under settlement with expectation of substantial recovery of the full extent of the damage.
- Lead furnace maintenance shutdown also taken: a one-week closure at the SIPCOT facility occurred, but sufficient spare capacity and ongoing expansion mean no material production impact in the longer run.
Kamlesh Jain: "Hedging is not a cost factor. Hedging is a tool to survive in this business of fluctuation... this kind of higher volumes and the lower margin business model, we have to protect our margin."
Margin Trajectory and Volume Outlook
- Copper EBITDA per tonne dipped to ₹31,000 in Q1: versus a FY26 annual average of ₹36,000; management attributes this to the six-month contract-to-dispatch cycle and hedging impact recognized at quarter close, insisting the two-quarter combined result will match the average.
- Value-added products are the margin lever: as copper cathode, busbar, and profiles projects progress from commissioning to higher utilization, product mix is expected to progressively improve and support the margin profile; management expects copper EBITDA margin to improve this year.
- Lead margin pressure to be offset: the fall in lead margin is expected to be compensated by copper value-added products and extraction of tin and antimony from lead, with management hoping for a better overall margin this year.
- Volume growth confirmed but unquantified: management states volumes will definitely increase in FY27, particularly in the later part of the year as new projects come online, but calls putting a percentage number to it slightly premature.
- Inventory build expected: supply chain conditions are improving and inventory levels are expected to build up over coming quarters, enabling smooth ramp-up of production.
Mayank Pareek: "Both. Because higher volumes, because the local scrap comes into recycling with this. With this regulation, the local scrap comes into organized recycling. So, that adds to the volume. And definitely, if there is a demand of recycled product, higher demand of recycled product, it adds to some margins."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Copper cathode Phase-1 commissioning | 750-tonne capacity to start; immediate volumes expected | Within ~1 month (Q2 FY27) |
| Copper wire rod commissioning | Project on track | Q3 FY27 |
| Copper busbar and profiles commissioning | Project on track | Q3 FY27 |
| Antimony project commissioning | On schedule | Q3 FY27 |
| Plastic recycling facility operational | ~6 acres land finalized | Q3 FY27 |
| Ahmedabad JV stabilization | Trial production commenced; operations to stabilize | Q2 FY27 |
| Kuwait investment contribution | Machinery ready; subject to shipping normalization | Q3 FY27 onward |
| Lead capacity expansion | 15-20% addition; approval pending | Undated (project almost done) |
| Copper anode production ramp-up | Target 1,600 tonnes in current quarter | Q2 FY27 |
| Copper EBITDA per tonne increase | Expected to rise by ~₹25 after value-added products stabilize | Post-stabilization (no date) |
| Unit-2 incident production impact | One-week closure not material; covered in current year run | FY27 |
| FY27 capex | ~₹87 crores, majority to copper value-added, antimony, plastic recycling | FY27 |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue | ₹2,724 cr, +76% YoY |
| EBITDA | ₹109 cr, +22% YoY |
| EBITDA margin | 4.0%, vs 5.8% in Q1 FY26 and 3.5% in Q4 FY26; +48 bps QoQ |
| PAT | ₹69 cr, +23% YoY |
| PAT margin | 2.5%, vs 3.6% in Q1 FY26 |
| PAT from continuing operations | ₹69 cr, vs ₹56 cr in Q1 FY26 |
| Copper and copper products revenue share | 67%, vs 55% in FY26 |
| Lead and lead alloy ingots revenue share | 29% |
| Aluminum and aluminum alloys revenue share | 3% |
| Copper anode sold since commissioning | ~600 tonnes (anode production in the quarter) |
| Copper EBITDA per tonne | ₹31,000 (per an analyst's math), vs ~₹40,000 in Q1 FY26 (per an analyst's math); last year annual average was ~₹36,000 per tonne |
| Return on equity | 22.8%, as on June '26 |
| Return on capital employed | 21.4%, as on June '26 |
| Inventory days | ~55 days, as on June '26 |
| Debtor days | ~19 days, as on June '26 |
| Working capital cycle | ~60 days, as on June '26 |
| FY27 capex outlay expected | ~₹87 cr |
| Raw material stuck at Dubai port | ₹20–30 cr, fully insured |