Key Takeaways
- Record FY26, transient Q4 hit: Revenue grew 48% YoY and PAT grew 56%, but Q4 EBITDA margin compressed to ~3.5% from two external shocks: a copper formula reset and Iran-Israel shipping disruptions. Management calls both transient, not structural.
- Copper formula whipsaw explains the quarter: A 40% LME rally triggered a one-time Chinese buying surge in Q3, then a formula collapse in Q4. Management pegs the formula impact at ~INR18,000–INR18,500 per ton and has changed to a long-term hedging mechanism to prevent recurrence.
- Value-addition pivot is now live: Copper anode production commenced in March 2026, with cathode, wire rod and bus bar all commissioning through FY27. Management targets an additional INR25–INR45 per kg in EBITDA from these downstream products.
- Projects delayed, not derailed: Kuwait and Ahmedabad JV timelines slipped two-three months on West Asia shipping disruptions, but civil work is complete and machinery is ready to ship on 30 days' notice once routes normalize.
- What to watch next quarter: Whether the INR6,000 per ton war-linked cost impact actually unwinds as shipping routes bypass the Middle East, the pace of anode-to-cathode ramp-up, and operating cash flow turning positive from Q2 as guided.
The Q4 Margin Shock: What Happened
- Two external blows, one quarter: Q4 EBITDA margin fell to ~3.5% because (1) sale realization formulas as a percentage of LME copper prices declined during a sharp copper price spike, an industry-wide phenomenon, and (2) the Iran-Israel conflict disrupted shipping routes, inflating logistics, fuel, port discharge and war-risk charges.
- The formula mechanics: Copper rallied from ~$10,000 to ~$14,000 (40%) over four-five months. In Q3, Chinese buyers anticipating further rises bought at elevated formulas, creating a tailwind. Once LME peaked and their appetite ended, the formula dropped, compressing Q4 margins. Management says averaging both quarters normalizes the picture.
- War impact quantified: The geopolitical disruption hit copper EBITDA by ~INR6,000 per ton, while the higher LME and formula drop together hit by ~INR18,000–INR18,500 per ton. Containers were stuck at Dubai/Jebel Ali port, constraining raw material supply and causing volume declines across copper, lead and aluminium.
- Rare event, structural fix: Management characterizes this formula volatility as a once-in-five-years event, comparable to the COVID period. The fix is a long-term hedging formula mechanism designed so that formula price swings no longer affect sale prices.
Kamlesh Jain: "So in the future we will be working on a long-term hedging formula mechanism where the price of the formula which varies up and down won't affect our sale price. This is the correction we have done for the future."
Value-Addition Roadmap: From Ingot to Cathode
- Anode production live: Copper anode production commenced March 2026 at Jain Green Technologies unit three, with initial capacity of 800 metric tons per month. A second furnace adding another 800 mt/month is expected to commission during Q1 FY27, taking total anode capacity to 1,600 mt/month.
- Cathode and downstream timeline: Phase one cathode commissioning is targeted for Q2 FY27, phase two for Q3 FY27, scaling to 1,500 mt/month. Copper wire rod (600 mt/month) is expected by August 2026, and copper bus bar (1,500 mt/month) by September 2026.
- The margin uplift math: Management sees value-added products adding INR25–INR45 per kg in EBITDA at current copper prices, with a more conservative estimate at INR22–INR45 per kg. This has the potential to lift copper EBITDA margin from 2% to 4% on the copper produced.
- Ramp-up speed: Additional volumes from value addition are expected from Q1 FY27, whether selling anode or cathode, and management says the ramp-up will be "quite quick."
Mayank Pareek: "It has a potential... would be between additional per kg at the present price rate... would be between INR25 and INR45 per kg."
Joint Ventures & New Initiatives: Delayed but Intact
- Kuwait battery recycling: Civil construction is complete and machinery is ready at the supplier facility, but dispatches are delayed due to Iran-related shipping route disruptions. The supplier is ready to ship on 30 days' notice once routes normalize.
- Ahmedabad JV with C&Y Group: Factory premises have been finalized on lease and project implementation is underway in a ramp-up model. Processing of electric motor scrap and cable scrap is expected from September 2026, with machinery installation targeted by December 2026.
- Plastic recycling unit: A strategic decision has been taken to establish a dedicated plastic recycling unit on ~6 acres of land already finalized, with a capex of ~INR15 cr. The unit is targeted to be operational by Q3 FY27.
- Two-three month project slip: Management acknowledged that Kuwait and Ahmedabad projects were delayed by two-three months because of the West Asia crisis, but all projects are expected to be completed in a phased manner in the current year.
Volume & Normalized Earnings Outlook
- Normalized copper EBITDA: Management expects ~INR30,000–INR32,000 per ton on a steady-state basis for the existing business, excluding the exceptional Q3 tailwind and Q4 headwinds. On a yearly average in a normal scenario, copper EBITDA guidance is INR32,000–INR33,000 per ton.
- Volume growth expectations: Regular double-digit growth is expected in both lead and copper for FY27, assuming international disturbances do not overpower trends. Lead volume growth is pegged at 10–15%, while copper volume growth is a "good double-digit figure" with potential to go beyond 15%.
- Shipping disruption easing: The INR6,000 per ton war-linked impact has "considerably come down" and future shipments are being routed bypassing the Middle East port with zero problems. Q1 FY27 copper EBITDA will show improvement from this factor.
- Capacity utilization trajectory: Copper capacity utilization will go beyond 65% over the next two-three years as volumes grow.
Kamlesh Jain: "So, for forward guidance, I'm sure about excluding the exceptional tailwind of quarter three FY '26 and a confluence of one-time headwinds in quarter four FY '26, the management expects normalized EBITDA to stabilize at approximately INR32,000 to INR30,000 on a steady state basis."
Balance Sheet & Cash Flow
- Operating cash flow turned negative: Operating cash flow went to negative ~INR600 crores, driven by an increase in receivables and inventories. This was attributed to copper price increases and 26% volume growth, with internal accruals deployed back into current assets and no fresh bank borrowings in the last three-four months.
- Receivables disclosure change: The major change in receivables in the cash flow statement is due to an NFRA/Companies Act requirement to show discounted receivables separately, whereas they were previously netted off. Management says underlying cash flows are healthy, with receivable days at 15–18 days.
- Working capital target: Management has a policy to reduce stock, and stock content was already reduced from Q3 to Q4. The working capital cycle target is below 60 days, with positive operating cash flow expected from Q2 onwards.
- Return ratios strong: ROE of 30.4% and ROCE of 25.3% reflect capital efficiency and disciplined execution despite the scale-up. Working capital cycle stood at 66 days (inventory 62 days, debtors 18 days, creditors 14 days).
Hemant Jain: "Once that is achieved, hopefully we can see some positive working capital coming positive into the CFS from the Q2 onwards."
Pushback & Unanswered Questions
- Raw material stuck at Hormuz: An analyst asked what percentage of raw material is stuck at the Strait of Hormuz. Management declined to give a percentage on the call, saying "it's not that great percentage" and offered to email details separately.
- Formula disclosure: An analyst requested disclosure of the formula causing EBITDA volatility. Management declined to explain on the call, calling it "complicated," and offered to discuss separately.
- Energy vs shipping cost split: An analyst asked for a breakdown of the copper EBITDA per ton drop between higher energy/shipping costs and the formula change. Management provided the two headline impacts (INR6,000 war, INR18,000–INR18,500 formula) but did not separately quantify energy or shipping costs.
- Other manufacturing costs decline: An analyst asked about the reason for the decline in other manufacturing costs (from INR70 crores in December 2025 to INR23.88 crores). Management initially could not answer, later attributed it to a change in maintaining fair value of hedges with positive M2M, and offered a detailed breakup by email.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Copper anode capacity expansion | Second furnace adding 800 mt/month, total to 1,600 mt/month | Q1 FY27 |
| Copper cathode phase one | Commissioning of phase one cathode capacity | Q2 FY27 |
| Copper cathode phase two | Commissioning of phase two, scaling to 1,500 mt/month | Q3 FY27 |
| Copper wire rod commissioning | Capacity 600 mt/month | August 2026 |
| Copper bus bar commissioning | Capacity 1,500 mt/month | September 2026 |
| Ahmedabad JV scrap processing | Electric motor and cable scrap processing start | September 2026 |
| Ahmedabad JV machinery installation | Machinery installation completed | December 2026 |
| Plastic recycling unit operational | Dedicated unit on ~6 acres, capex ~INR15 cr | Q3 FY27 |
| Kuwait venture machinery shipment | Supplier ready to ship on 30 days' notice once shipping routes normalize | Conditional on route normalization |
| Normalized copper EBITDA per ton | ~INR30,000–INR32,000 steady state; INR32,000–INR33,000 yearly average in normal scenario | FY27 |
| Lead volume growth | 10% to 15% | FY27 |
| Copper volume growth | Good double-digit, potential to go beyond 15% | FY27 |
| Working capital cycle | Below 60 days | No date |
| Operating cash flow | Turn positive | From Q2 FY27 onwards |
| All projects completion | Kuwait, Ahmedabad, copper value-addition completed in phased manner | Current year (FY27) |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue | ₹3,105 cr, +76% YoY |
| EBITDA margin | 3.5%, impacted by temporary formula compression and geopolitical logistics costs |
| EBITDA per ton (copper) | ~₹14,000, down from ~₹42,000 in Q3 FY26 due to one-time headwinds |
| Normalized EBITDA per ton guidance (copper) | ₹30,000–₹32,000, on a steady-state basis excluding one-time factors |
| PAT margin (FY26 full year) | 3.6%, vs 3.5% in FY25 |
| Volume growth (FY26 full year) | ~26.5% |
| Copper segment revenue share (FY26) | ~55% of total revenue |
| Lead segment revenue share (FY26) | ~40% of total revenue |
| Aluminium segment revenue share (FY26) | ~5% of total revenue |
| Export revenue share (FY26) | 62% of total revenue |
| Domestic revenue share (FY26) | 38% of total revenue |
| Return on equity (as at March 2026) | ~30.4% |
| Return on capital employed (as at March 2026) | ~25.3% |
| Inventory days (as at March 2026) | ~62 days |
| Debtor days (as at March 2026) | ~18 days |
| Creditor days (as at March 2026) | ~14 days |
| Working capital cycle (as at March 2026) | ~66 days |
| Copper capacity utilization (FY26) | ~65% of total installed capacity |
| Lead capacity utilization (FY26) | 97%–100% of total installed capacity |
| Aluminium capacity utilization (FY26) | ~35% of total installed capacity |
| Copper anode capacity (initial) | 800 metric tons per month, commissioned March 2026 |
| Copper anode capacity (post phase 2) | 1,600 metric tons per month, expected Q1 FY27 |
| Copper cathode capacity (post phase 2) | 1,500 metric tons per month, expected Q3 FY27 |
| Copper wire rod capacity | 600 metric tons per month, expected commissioning August 2026 |
| Copper bus bar capacity | 1,500 metric tons per month, expected commissioning September 2026 |
| Plastic recycling unit capex | ~₹15 cr, expected operational Q3 FY27 |
| Antimony project capex | ~₹20 cr |
| Ahmedabad JV project capex | ~₹30 cr |
| Kuwait project capex | ~₹30 cr |
| Total capex planned for FY27 | ₹115–₹120 cr |
| IPO proceeds utilized for debt repayment | ~₹375 cr out of ~₹500 cr primary issue |
| IPO expenses utilized | ~₹16.4 cr |
| War-related EBITDA per ton impact (copper) | ~₹6,000 per ton |
| Formula-related EBITDA per ton impact (copper) | ~₹18,000–₹18,500 per ton |
| 1% formula change impact on EBITDA | ₹13 per kg |
| Lead volume (FY26) | ~1.85 lakh tons |
| Copper volume (FY26) | ~54,000 tons |