Key Takeaways
- Volume hit, margin surge: Sales volume fell 10% QoQ as an early monsoon and post-Q4 inventory correction bit, yet adjusted EBITDA per tonne jumped 35% on higher ASP and lower input costs.
- Cost savings are real and sticking: Coking coal costs dropped $11/tonne, in line with guidance, and the non-coal savings of ~₹1,200/tonne from Q4 proved sustainable.
- The debt red line is sacrosanct: Net debt rose ₹2,443 crores on a working capital build, but management reiterated that 1.5x net debt/EBITDA is a hard ceiling it will not breach.
- Angul’s defining moment is imminent: Blast Furnace-2 is on track to deliver first hot metal in August 2025, with BOF-2 close behind, setting up the second half as a structural step-change.
- What to watch next quarter: Whether the inventory liquidation and construction demand revival flagged for August actually flow through to volumes, and the pace of the BF-2/BOF-2 ramp once hot metal starts.
Volume & Demand: The Q1 Air Pocket
- Monsoon hit early, demand tapered from June: The seasonal slowdown arrived ahead of schedule, compressing sales volume even as production stayed broadly stable at 0.21 crore tonnes, down only 1% QoQ.
- Inventory whiplash amplified the decline: An excessive drawdown in the seasonally strong Q4 FY25 forced a restocking cycle in Q1, adding ~₹2,400 crores of inventory that sat on the balance sheet rather than moving out the gate.
- August signals a turn: Management flagged early signs of revival from the construction side, with yellow goods and construction equipment showing very strong demand, pointing to good demand quarters ahead.
- Chinese imports have stopped being a threat: A ~$50 improvement in Chinese prices made imports unviable, and strict enforcement of the QC order and melt-and-pour norms choked off the low-quality inflow that had threatened domestic players.
- Domestic prices are down but a floor may be near: Steel prices are currently 5-7% lower than Q1 levels, though early indicators suggest a possible turnaround soon.
Bandyopadhyay: "As far as guidance towards the production and sales, for the balance of the year and for the full financial year, we remain on course, and we remain committed to those numbers."
Costs: The Margin Engine Firing
- Coking coal delivered exactly as promised: The $11/tonne QoQ reduction landed inside the guided $10-15/tonne band, and management expects a further $5/tonne decline in Q2 FY26.
- Non-coal savings held their ground: The ~₹1,200/tonne of other cost reductions achieved in Q4 proved sustainable in Q1, with Tensa mine contributing only 0.01 crore tonnes, meaning the result was purely operational.
- Raw material cost walk: After adjusting for a ₹1,200/tonne one-off and ₹336/tonne of captive consumption, the net reduction was ₹2,864/tonne, driven by coking coal (₹500/tonne), PCI (₹200/tonne), and scrap/other items (₹900-1,000/tonne).
- Thermal coal is nearly fully captive: 90-95% of thermal coal came from own mines in Q1, with only a small FSA from MCL mines; the Utkal B1 block is expected on track this quarter to close the gap.
- Iron ore costs were flattish QoQ, and the newly won Roida-I mine (EC capacity 0.3 crore tonnes, ~12.6 crore tonnes reserve) will compensate for declining volumes from the end-of-life Tensa mine.
The Angul Transformation: BF-2 and Beyond
- Blast Furnace-2 is weeks away: Commissioning activity began in Q4 FY25 with the lighting of three gas stoves, and first hot metal is expected in August 2025, inside Q2 FY26.
- BOF-2 follows immediately: Management described BOF-2 as at an advanced stage of commissioning and said it will start very close to BF-2, though it declined to give a specific quarter.
- Downstream capacity is stacking up behind the hot end: A 200,000-tonne continuous galvanizing line was commissioned at Angul, the first from Jindal Steel; a color coating line is due by end-Q3 FY26, with a second galvanizing line and second color coating line both expected in Q4 FY26.
- The pellet-to-DRI chain is strengthening: Existing pellet plant production rose over 50% YoY, and the ramp-up of own pellets at Angul enables a strong scale-up of DRI production; Pellet Plant-2 is coming in FY27.
- BF-3 is committed to Q4 FY26, while DRI-2 has been revised into FY27.
- The Shree Bhoomi Power Plant Unit-1 starts in the current quarter, adding captive power to support the expanded footprint.
Agrawal: "As we look ahead, financial year '26 is shaping up to be the defining chapter for Jindal Steel. With the commissioning of major facilities, Blast Furnace, BOF, SBPP and other facilities, Angul is on track to establish itself as one of the world's top single-site steel production hubs."
Product Mix & Pricing Resilience
- Value-added share jumped to 72% from the previous quarter, driven by high grades of HR coils from the new hot strip mill; management called this level sustainable.
- The mix shift is a margin shield: Value-added products carry far lower price elasticity than trade-grade steel, so the 5-7% domestic price decline hits revenue less than it would a commodity-heavy book.
- Auto ramp-up will take time: While the value-added percentage is sustainable, the auto-grade qualification and volume ramp is a quarter-on-quarter build, not an overnight switch.
- The Raigarh plate mill has been re-geared to produce plates with furnace-normalized products, and the upcoming HTC facility will help retain and add to the value-added percentage.
Pradhan: "The elasticity of value-added prices on value added is much lesser compared to the non-value added or trade type of steel. So, you are absolutely right. The impact will not be as high as it is on the trade level prices."
Balance Sheet: Debt, Working Capital & the Red Line
- Net debt rose ₹2,443 crores sequentially, driven primarily by a working capital build of ~₹2,900 crores as EBITDA earnings converted into inventory.
- The rest of the cash outflow went to CAPEX (₹2,226 crores), loan repayments (~₹700 crores), and interest (~₹500 crores).
- The 1.5x net debt/EBITDA ceiling is non-negotiable: Management called it sacrosanct, a red line that will not be breached, and said the ratio is already below that level halfway through Q2.
- The deleveraging path is organic: Inventory liquidation in Q2 will improve the cash position, and BF-2 and BOF-2 will start contributing, so the situation will automatically improve in Q3.
- Management declined to provide a net debt bridge or a split of acceptances, revenue, and CAPEX on the call, asking analysts to take those offline.
Chandak: "1.5x is sacrosanct to us, it is a red line we will not breach. I reiterate, we will not breach."
Mines & Raw Material Security
- Roida-I is the new iron ore anchor: Won in Odisha with EC capacity of 0.3 crore tonnes per annum and estimated reserves of ~12.6 crore tonnes; extraction has already started, with a plan to extract ~0.16 crore tonnes in FY26.
- Tensa is winding down: The mine is toward the end of its life and contributed only 0.01 crore tonnes in Q1; management told analysts not to model a 0.3 crore tonne run rate for FY26.
- Saradhapur Jalatap coal block was won with a geological reserve of ~320 crore tonnes, partially explored; full exploration and announcement of extractable reserves and annual EC limits will come over the next couple of years.
- Utkal B1 is on track for Q2, with coal expected at the start of Q3; Utkal B2 is on the cards but no timeline was given.
- Management declined to share the delivered cost delta for captive vs linkage/e-auction coal, saying only that it is 3-4%, and also declined to split iron ore sourcing between captive and external.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Production and sales volume | 0.85 to 0.9 crore tonnes for the full year | FY26 |
| Coking coal cost | Lower by ~$5/tonne vs Q1 | Q2 FY26 |
| Blast Furnace-2 first hot metal | Commissioning underway, first hot metal expected | August 2025 (Q2 FY26) |
| BOF-2 commissioning | Advanced stage, very close to BF-2 | Implicitly Q2 FY26 |
| Blast Furnace-3 completion | Committed to complete | Q4 FY26 |
| Net debt to EBITDA ceiling | Cap at 1.5x, described as a red line | Ongoing, not to be breached |
| Roida-I iron ore extraction | ~0.16 crore tonnes | FY26 |
| Color coating line commissioning | End of Q3 FY26 | Q3 FY26 |
| Galvanizing line #2 and color coating line #2 | Both expected | Q4 FY26 |
| Shree Bhoomi Power Plant Unit-1 | Starting | Current quarter (Q2 FY26) |
| Utkal B1 coal | On track, coal expected at start of Q3 | Q2 FY26 (block readiness), Q3 FY26 (coal) |
| DRI-2 | Revised timeline | FY27 |
| Pellet Plant-2 | Coming up | FY27 |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Consolidated gross revenue | ₹14,336 cr, down 8% QoQ on lower volumes partially offset by higher ASP |
| Consolidated adjusted EBITDA | ₹2,984 cr |
| Adjusted EBITDA per tonne | ₹15,680, up 35% QoQ |
| Consolidated PAT | ₹1,496 cr, 36% higher than adjusted PAT QoQ |
| Production | 0.21 crore tonnes, down 1% QoQ |
| Sales volume | 0.19 crore tonnes, down 10% QoQ on inventory replenishment after Q4 drawdown and early monsoon |
| Blended capacity utilization | 87%, down from 88% in Q4; Raigarh at 95%, Angul at 83-84% |
| Value-added sales share | 72%, up from previous quarter; 44% flats, 56% longs |
| Consolidated net debt | ₹14,400 cr, up ₹2,443 cr QoQ on working capital build-up |
| Net debt to EBITDA | 1.49x, management reiterates 1.5x as a red line that will not be breached |
| Total CAPEX (Q1) | ₹2,226 cr; cumulative ₹28,150 cr spent of ₹47,043 cr announced CAPEX |
| Coking coal consumption cost (Q1) | $11 per tonne reduction QoQ, in line with guidance |
| Coking coal consumption cost (Q2 guidance) | $5 per tonne lower QoQ expected |
| Domestic steel prices (Q2 to date) | 5% to 7% lower compared to Q1 |
| Roida-I mine planned extraction (FY26) | 0.16 crore tonnes; EC capacity 0.3 crore tonnes per annum, estimated reserve ~12.6 crore tonnes |