Key Takeaways
- Earnings crushed by realizations, not volumes: Adjusted EBITDA halved QoQ as net sales realization dropped ~13%, with a ~₹600 Cr inventory-led margin hit; domestic demand stayed robust and the full-year volume target is intact.
- Export duty forced a pivot: Exports fell 48% QoQ to just ~11% of sales, and management will stay opportunistic, selling wherever value is higher, with no fixed export ratio.
- A ₹1,664 Cr provision drove a reported loss: Prudent provisioning for accrued interest and FX gains on loans to JSPML pushed PAT to a loss of ₹473 Cr; underlying PAT was ₹935 Cr and working capital released ₹1,938 Cr.
- Captive coal is the margin story, but timing is soft: Management targets 50% thermal coal self-sufficiency on average, with mines expected operational by Q4 FY23, but declined to give mine-by-mine dates or volume ramps.
- What to watch next quarter: Whether October realizations stabilize as indicated, any progress on the subsidiary impairment review, and concrete steps toward the Q4 captive coal start-up.
The Realization Collapse
- NSR fell 13% QoQ: domestic down 9%, exports down ~21%, driven by falling international steel prices and the export duty overhang.
- Inventory liquidation amplified the pain: Opening inventory sold at lower margins created an estimated differential of ~₹600 Cr, or roughly ₹3,000 per tonne, a one-off drag that should not repeat at the same scale.
- October stabilizing at the bottom: Management noted realizations are stabilizing around Q2 levels, implying the steepest leg of the decline may be over.
- Price remains the uncontrollable variable: Domestic demand is strong enough to absorb all production, but realizations are a function of global markets and policy.
Jha: “Price is another matter which the roll-off dice that the God rolls we unfortunately do not have control over.”
Export Duty & Mix Shift
- Exports collapsed 48% QoQ: export share fell from 25% to ~11% as the export duty made domestic sales far more attractive.
- No fixed export target: Management will sell wherever maximum value is, domestic or export, and is prepared to pivot back if the duty is removed or international prices improve.
- Domestic demand absorbed the shift: The company liquidated most of its inventories and reported no difficulty selling produced quantities domestically.
- Near-term order book is healthy: Management sees no reason for concern on the demand side.
Costs: Coal Tailwind, But No Forecast
- SMS costs declined ~8% QoQ: driven by lower coking coal prices (~6%) and lower iron ore prices (~24%).
- Thermal coal cost moved negative by ₹600–₹700 per tonne of steel QoQ, providing a partial offset to the realization decline.
- Management refuses to forecast coal prices: coking coal and thermal coal prices are too volatile to call; the strategy is to keep inventories low and stay agile.
Jha: “Third quarter is, your guess is as good as mine, so rather than making any forward-looking statement, what I would say is keep our finger crossed that it does not go through the roof again.”
Captive Coal: The Margin Reset, Still Pending
- Five captive thermal coal mines are the core margin thesis: Utkal B1, B2, Utkal C, and Gare Palma IV/6 are expected to eventually make JSP completely self-sufficient on thermal coal, with surplus optionality to sell externally.
- Target: 50% self-sufficiency on average: Management hopes to meet at least half of thermal coal needs from own mines on an average basis during the year, at substantially lower cost than purchased coal.
- Q4 FY23 operational start, with caveats: Management is “fingers crossed” for Q4, but declined to give mine-by-mine start dates or volume ramp-ups, citing clearance and external risks.
- Ramp-up to 80–85% utilization by FY2025, per the only quantified timeline offered.
- Iron ore mines are already operational: the company has optionality to activate more own mining if OMC ore becomes more expensive, or to buy from OMC when that is cheaper than beneficiating own ore.
Jha: “First of all, with all fingers cross, all caveats, I do hope in this country when I say that this is the date where I can do something. I do hope everything falls in place. By that, Q4 of the current fiscal is what we are expecting our coal mines to be operational and start giving us results.”
Overseas Subsidiaries & Provisions
- A ₹1,664 Cr provision swung reported PAT to a loss: the provision covers accrued interest (₹765 Cr) and FX gain (₹898 Cr) on loans to JSPML, taken as a matter of prudence because subsidiaries like Australia are not delivering desired returns. Underlying PAT before adjustments was ₹935 Cr.
- Australia lost ₹69 Cr at the EBITDA level: operational EBITDA was USD 8 million, but FX translation losses on USD-denominated loans from JSPML turned the bottom line negative. Mozambique and South Africa remained operationally positive.
- All external subsidiary debt has been repaid: overseas subsidiary loans are fully repaid, and no external borrowings remain at the subsidiary level.
- Impairment review is underway: management is evaluating subsidiary performance and ability to generate desired returns, with valuation work still to be completed; no indication of potential impairment quantum was given.
- Australian coking coal mine ramp-up is slower than expected: issues with equipment, washeries, and mine planning are being addressed, and a constant improvement trend is visible, but underground mining carries inherent uncertainties.
- Overseas assets remain integral for raw material security, especially coking coal, given India’s lack of sufficient domestic reserves and high price volatility.
Capex, Capacity & the Growth Path
- ~₹18,000 Cr capex program is underway, with most investments in the 100% owned subsidiary Jindal Steel Odisha; management categorically ruled out any sale or spin-off of these assets, calling them integral to the integrated site.
- Only incremental volume growth before the new blast furnace: improvements will come from plugging operational losses and continuous improvement programs, but many of these gains are just enough to absorb market surprises.
- Capacity utilization aspiration is above 90%, but no specific timeline was committed; management noted the only constraint is “brain power” — training, maintenance timing, and intelligent operational choices.
- PLI application filed for upcoming HSM and CRM projects by the September 15 deadline.
- Green hydrogen readiness is a differentiator: DRI already uses syngas with 52–56% hydrogen; the company is experimenting with increasing the hydrogen percentage to 70–80% using gray hydrogen first, and will switch to green hydrogen only when commercially viable.
Jha: “I am not saying that, that would not happen, but what I am also saying is that what we do not want to factor in is that often many of these improvements are simply just about enough to deal with the surprises that the market throws on us.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY23 sales volume | 0.81–0.82 crore tonnes; no risk to target | FY23 |
| Captive coal mines operational | Mines to start giving results | Q4 FY23 (with caveats) |
| Captive coal ramp-up | 80–85% utilization | FY2025 |
| Thermal coal self-sufficiency | At least 50% from own mines on average | During the year (FY23) |
| Net debt-to-EBITDA ceiling | Conservative, less than 1.5x through cycles | Ongoing |
| Net debt target | Continue journey toward zero debt at JSP level | No date |
| Product mix bias | Toward value, not long or flat | Ongoing |
| Subsidiary impairment review | Valuation work to be completed; update promised | No date |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Sales volume | 0.2 crore tonnes, up ~16% QoQ; domestic sales up ~36% QoQ, exports down 48% QoQ |
| Production | 0.18 crore tonnes, down ~9% QoQ due to Raigarh shutdown in August and scheduled Angul shutdowns |
| Export share | ~11% of overall volumes vs 25% in Q1 FY23 |
| Net sales realization (NSR) | Lower by ~13% QoQ; domestic realizations declined 9%, exports declined ~21% |
| Adjusted EBITDA | ₹1,426 cr, down 50% QoQ; includes ~₹600 cr differential from opening inventory sold |
| PAT before exceptional items | ₹935 cr |
| PAT after exceptional items | Negative ₹473 cr (loss), after provisions of ₹1,664 cr for accrued interest and FX gain on JSPML loans |
| Exceptional provisions | ₹1,664 cr, comprising ₹765 cr accrued interest provision and ₹898 cr accrued FX gain provision on loans to JSPML |
| Gross debt | ₹10,611 cr (post prepayment in October); ₹13,717 cr at end of September |
| Net debt | ₹7,334 cr |
| Net debt to EBITDA | 0.66x |
| Working capital released | ₹1,938 cr |
| Sustenance capex | ₹298 cr |
| Overseas subsidiaries EBITDA | ₹93 cr overall; Australia negative EBITDA of ₹69 cr due to FX translation impact |
| Australia operational EBITDA | $8 million |
| Thermal coal cost movement | Down ₹600–₹700 per tonne of steel QoQ |
| Iron ore cost | ~₹3,000 per metric tonne |
| Coking coal cost | ~₹800 per metric tonne |
| FY23 volume guidance | 0.81–0.82 crore tonnes |
| India steel demand forecast (CY2023) | 12.1 crore tonnes, up from 11.3 crore tonnes in CY2022 |