- Soft quarter, heavy capex delivery: Adjusted EBITDA absorbed a ~INR250 crores shutdown hit while the company simultaneously commissioned its second blast furnace and BOF2 at Angul, more than doubling hot metal capacity.
- Value-added mix shielded realizations: Despite industry-wide price weakness, Jindal's per-tonne realization dropped only INR500 QoQ because the value-added share hit 73%, the highest ever.
- Captive iron ore is the margin lever now: Captive mine share of consumption jumped from 29% to 45% QoQ as Kasia and Roida-I ramped up, a structural cost shift that is still in early innings.
- Volume recovery bet rests on H2: Management held full-year volume guidance and needs ~60% of annual offtake in H2, pinning the case on five months of clean, post-monsoon construction demand.
- What to watch next quarter: Whether the promised November/December demand pickup materializes, the pace of Utkal B1 mine commissioning, and the trajectory of coal costs after the guided $3-5/tonne QoQ increase.
Angul Ramp-Up: The Quarter Jindal Became a 9 MTPA Steelmaker
- Two major units commissioned: The 0.46 MTPA Bhagavati Subhadrika Blast Furnace-II and the 0.3 MTPA Basic Oxygen Furnace-2 both came online at Angul, taking crude steel capacity from 6 MTPA to 9 MTPA in a single quarter.
- The shutdown that paid for it: A planned ~1-month DRI plant shutdown cost INR174 crores directly, with the total EBITDA impact reaching ~INR250 crores including external metallic purchases and opex, a non-recurring drag that masks the underlying run-rate.
- Next capacity milestone is close: Another 0.3 MTPA SMS is scheduled by fiscal year-end, which will lift steelmaking capacity from 12.6 to 15.6 MTPA and keep Jindal firmly on track for the stated 12 MTPA Angul goal within FY26.
- Utilization is the next problem to solve: Management acknowledged it is working on increasing utilization of current capacities and that output will rise as new units come online, implying a ramp-up curve rather than an instantaneous fill.
Gautam Malhotra: "No, we're fairly confident because the capacities came on very recently only."
Realization Resilience: How Mix Offset Price Weakness
- The INR500 shield: While the broader long-product sector suffered severe margin compression from seasonal weakness and Chinese price softness, Jindal's NSR fell only INR500 QoQ, a fraction of the industry drop.
- Three drivers of mix improvement: Value-added share reached 73% (highest ever), the downstream business ramped up, and the product mix shifted deliberately from long (56% to 51%) to flat (44% to 49%) because long products faced more price pressure than flats.
- Exports leaned value-added: Export volumes increased with a focus on value-added products, adding another layer of realization support beyond the domestic mix shift.
- Flats to dominate H2 incrementally: With the new blast furnace contributing from Q3/Q4, management guided that incremental volumes will be entirely flats, and the flat share is expected to reach 55-60% in H2.
- Auto is a slow-burn opportunity: Management cautioned that auto approvals (both plant and product) have long cycles, so the segment will take time; near-term focus is on yellow goods where entry is faster.
Captive Iron Ore: The Structural Cost Story Accelerates
- A 16-percentage-point jump in one quarter: Captive mine share of total iron ore consumption rose from 29% in Q1 to 45% in Q2, driven by better production from Kasia and the first incremental output from Roida-I.
- Tensa is effectively done: Production at Tensa was minimal in Q2 as the mine reached end-of-life, with only boundary-wall material still being extracted, making the Kasia/Roida ramp-up essential just to hold ground.
- Utkal B1 is the next catalyst: The mine is in the commissioning phase and management expects output "most probably by end of this quarter," though it declined to quantify volumes until it has entered the mine.
- International assets are a rounding error: The largest overseas mine (WCL) remains in care and maintenance, Mozambique and South Africa contribute minimally, and the Australian subsidiary is already impaired with only land value of $187 million carried on the books.
- Iron ore purchase costs remain sticky: While NMDC reduced prices, OMC auction prices continue to stay high despite soft steel prices, so the full benefit of captive ramp-up is partly offset by elevated market prices for the purchased portion.
Cost and Margin: Savings Promised, Coal Headwind Ahead
- Coal costs delivered as guided: Coking coal consumption cost fell $4 per tonne in Q2, broadly in line with the $5/tonne guidance, providing a tailwind in a quarter that needed it.
- Q3 coal cost to reverse: Management guided a $3-5/tonne sequential increase in coal consumption cost for Q3, a headwind that will land just as the company hopes demand returns.
- 2-3% cost savings committed immediately: Management stated it expects at least 2-3% of overall cost structure savings over Q2 "right now, immediately," though it declined to provide specific line-item numbers on the call.
- AI savings are experimental, not financial yet: The company is deploying IoT sensors, computer vision, and predictive AI models across operations, but management called it "too early to talk about cost savings from AI."
- Capex funded internally: A large portion of capex, if not all, is being funded from internal accruals, and management reiterated its commitment to cap net debt-to-EBITDA at 1.5x.
Gautam Malhotra: "We do expect that at least 2% to 3% of savings would come over Q2 right now, immediately."
Demand and Volume: The H2 Bet
- Q2 was a seasonally disrupted quarter: Production fell 5% QoQ and sales volume 2% QoQ as an extended monsoon and planned shutdowns compressed activity; the entire long-product sector saw subdued profitability for the same reasons.
- The H2 math is back-end loaded: Management held full-year volume guidance and stated it is looking at almost 60% of annualized volume offtake in H2, a steep ramp that depends on the demand thesis playing out.
- Five months of clean demand is the thesis: With the monsoon over and October festivals bunched together, management sees a clear November-through-March construction season that is "seasonally very strong," though Q3 pricing visibility remains limited.
- Next year's volume guidance deferred: Management will only provide FY27 volume guidance in the Q4 earnings call, leaving the market to model the ramp-up curve from newly commissioned capacity without official numbers.
- Steel prices expected to stabilize, not surge: The outlook is for prices to improve post-festival season as construction demand returns, but management stopped short of calling a sharp recovery, noting "it is a little too early to talk about how Q3 really shapes up."
S.K. Pradhan: "We are expecting the demand to pick up from here on, from November, December onwards, because the monsoon itself was very long. And the good part is that all the festivals were bunched together in the month of October. So now we have 5 months of clean demand period, which is seasonally very strong period."
Balance Sheet and Working Capital
- Net debt fell despite the capex cycle: Net debt decreased by INR244 crores sequentially, attributed to efficient working capital management even as major projects were being commissioned.
- Acceptances jumped on coal procurement cycle: Revenue acceptances rose from ~INR3,000 crores to ~INR5,000 crores because the new facility required working capital for coking coal LCs, which have a 45-60 day procurement cycle.
- Acceptances sit outside net debt: Management clarified that the INR4,982 crores of revenue acceptances is not included in the reported net debt figure of INR14,156 crores, a disclosure investors need to factor into leverage calculations.
- New project threshold is 18-20% ROCE: Any new projects must clear an 18-20% ROCE hurdle, a guardrail management cited as it continues to deploy growth capex.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Angul capacity target | Reach 1.2 MTPA at Angul | Within FY26 |
| Steelmaking capacity | Achieve 15.6 MTPA (add 0.3 MTPA SMS) | By end of FY26 |
| Full-year volume guidance | Hold FY26 volume guidance; ~60% of annualized offtake in H2 | FY26 |
| Net debt-to-EBITDA cap | Cap at 1.5x | Ongoing |
| Q3 coal consumption cost | Increase by $3-5/tonne sequentially | Q3 FY26 |
| Cost structure savings | At least 2-3% savings over Q2 cost structure | Immediately |
| Utkal B1 mine commissioning | First output from mine | Most probably by end of Q3 FY26 |
| DRI and BOF3 commissioning | Projects commissioned | Q4 FY26 |
| Slurry pipeline completion | Complete as per guidance | On track (no revised date given) |
| New project ROCE threshold | 18-20% ROCE hurdle for any new projects | Ongoing |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Consolidated gross revenue | ₹13,505 cr, down 6% QoQ |
| Consolidated adjusted EBITDA | ₹1,875 cr |
| Adjusted EBITDA per tonne | ₹10,010 per ton |
| PAT | ₹635 cr |
| Sales volume | 0.19 crore tonnes, down 2% QoQ |
| Production | 0.2 crore tonnes, down 5% QoQ |
| Value-added sales share | 73% of total sales, highest ever |
| Flat product share | 49% of sales, up from 44% QoQ |
| Long product share | 51% of sales, down from 56% QoQ |
| Consolidated net debt | ₹14,156 cr, down ₹244 cr QoQ |
| Net debt-to-EBITDA | 1.48x |
| Capex during the quarter | ₹2,699 cr |
| Total capex spent till 30 Sep 2025 | ₹30,849 cr out of ₹47,043 cr announced |
| Steelmaking capacity by end of FY26 | 1.56 crore tonnes, up from 1.26 crore tonnes currently |
| Captive iron ore share in total consumption | 45%, up from 29% in Q1 |
| Coking coal cost reduction | $4 per tonne QoQ |
| Q3FY26 expected coal cost change | $3 to $5 per tonne increase sequentially |
| Domestic steel prices vs Q2 | 2% to 3% lower currently |
| Planned shutdown impact (non-recurring) | ₹174 cr in EBITDA; overall impact ~₹250 cr |
| Revenue acceptances | ₹4,982 cr, not included in net debt |