Key Takeaways
- Record revenue, resilient operations: Gross revenue hit an all-time quarterly high of ₹19,448 crores, driven by record Q2 sales volume and a deliberate mix shift toward flat products, even as heavy Odisha rains flooded mines and disrupted logistics.
- EBITDA up 34% YoY despite cost headwinds: Adjusted EBITDA rose to ₹2,504 crores, absorbing a $20–$25 per ton coking coal cost jump and a 13% QoQ spike in other expenses from monsoon-linked freight and maintenance.
- Energy substitution turned a crisis into a permanent advantage: A Hormuz conflict-driven shortage of natural gas and propane forced a switch to syngas from the coal gasification plant, which management now calls a permanent, lower-cost solution with no impact on production.
- Slurry pipeline goes live, unlocking structural freight savings: The 192-km Barbil-Angul pipeline is commissioned and begins continuous commercial operation within days, set to eliminate ~500 trucks daily and deliver an immediate ₹700 per ton freight saving.
- What to watch next quarter: Whether the promised Q3 record production materializes alongside the full slurry pipeline benefit, the trajectory of coking coal costs if geopolitical tensions persist, and the pace of the product mix shift toward the 65:35 flat-to-long target.
Production Ramp-Up & Volume Trajectory
- H1 sets the floor for a back-loaded year: H1 net steel production was 0.48 crore tons; management targets ~0.6 crore tons in H2, implying a quarterly run-rate of 0.3 crore tons (960,000 tons/month) and full-year gross steel production of ~1.1 crore tons.
- New Angul blast furnace climbing fast: The furnace has already reached ~10,000 tons/day, with a clear ramp path to 10,500 tons within a week, 11,000 tons in November, and 12,000 tons per day in December.
- All four blast furnaces performing well: The two Angul and two Raigarh furnaces are running smoothly, providing the base for the record production expected in both Q3 and Q4, with Q4 projected to surpass Q3.
- DRI and gasifier capacity coming mid-2027: A 2-million-ton DRI plant and three new coal gasifiers (105,000 NM³/hour total, over 95% indigenous) are targeted for commissioning by June 2027, though imported equipment shipping poses a delay risk for the DRI plant.
- New pellet plant to close the metallics gap: Installation completes by March, trials begin end-March/early April, and commercial production is expected by June next year, addressing the internal deficit created after blast furnace #2 absorbed all captive pellet output.
V.R. Sharma: "The company has done wonderfully well in last quarter. We have done a record sales in the history of this company in any quarter in the last so many years. That is INR 19,448 crores. So, I think we are now on a path to reach to INR 1 lakh crores per year of sales. This is what our aim is."
Cost Structure & Raw Material Security
- Coking coal the primary margin swing factor: Q2 saw a $20–$25 per ton increase, within the guided range; Q3 will absorb another confirmed $20 jump, and management flags a potential further $20 impact if superpowers do not relax sanctions on Iran and Russia.
- Coal gasification delivers a permanent cost edge: Syngas at ₹30/kg replaced propane at ₹100/kg, yielding a ₹70/kg advantage for downstream reheating furnaces, galvanizing, and color-coating lines; the burner and automation systems have been permanently modified to run on syngas.
- Captive coal covers half the need, with a clear path to more: Own mines met 50–55% of requirement in Q2 despite rain-driven stoppages; the target is 65–70% this year and potentially the entire requirement next year, subject to cost competitiveness versus external purchases.
- Captive iron ore provided security, not just savings: Kasia mine produced 22,000 tons/day and enabled continued production when OMC mines were waterlogged during the monsoon; management emphasizes raw material security over a narrow per-ton financial calculation.
- Slurry pipeline savings are structural and immediate: The ₹700 per ton freight saving begins from day one of commercial operation, with full volume of 20,000 tons/day flowing immediately and no additional expenses or surprises expected.
- Other expenses to normalize post-monsoon: The 13% QoQ jump was driven by freight (Middle East crisis, diesel), power and fuel, and higher monsoon-related O&M and spares consumption; management expects rationalization in Q3.
V.R. Sharma: "We switched over to coal gas, that is, syngas for many of the reheating furnaces, galvanizing lines, color-coating lines, and there was no impact on our productivity, production and profitability."
Product Mix & Realization Strategy
- Deliberate shift from TMT to flats underway: TMT volume was cut from 220,000 tons/month to 120,000 tons/month, with the freed 100,000 tons redirected to flat products, that is for plates as well as for hot-rolled coils, capitalizing on weak construction-season TMT realizations.
- 65:35 flat-to-long is the steady-state target: Management aims to maintain this ratio, driven by better value addition in plates, where the company claims undisputed domestic leadership, supported by government defence spending, merchant shipbuilding, and windmill demand.
- HRC realizations strengthened late in Q2: Prices moved from ₹51,000 to ₹60,000 during the quarter, with the benefit concentrated in August and September, meaning the full impact will be felt in Q3.
- TMT prices recovered sharply but from a low base: Spot prices fell from ₹56,000 to ₹45,000 early in Q1 before recovering to around ₹60,000; construction steel and HRC prices are now nearly at parity, with Q3 and Q4 expected to be much better on festival and post-monsoon construction demand.
- Value-added mix optics require careful reading: The reported decline to 57% from 66% QoQ reflects the movement away from low-priced TMT to higher-priced other products; on a different comparison basis, management says the figure exceeds 65%.
- No vanilla products in the hot strip mill: The focus is on high and medium carbon steel and niche, highly remunerative products, deliberately avoiding commoditized grades.
V.R. Sharma: "We are not manufacturing vanilla products in hot strip mill. And either these are high carbon steel or medium carbon steel or something which is a niche markets, but very highly remunerative products that we are manufacturing."
Balance Sheet & Capital Allocation
- Consolidated net debt fell by ₹1,141 crores: Net debt-to-EBITDA improved from 1.71x to 1.51x, and the company states it is cash surplus, reinforcing the "earn and invest" philosophy.
- Annual growth capex pegged at ₹7,500–₹10,000 crores: Funded primarily through internal accruals, with a commitment to maintain net debt-to-EBITDA below 1.5x through the cycle.
- No new capacity until 100% utilization: Management explicitly reiterated it will not invest in fresh capacity until reaching 100% utilization of existing assets, at which point an internal review will be triggered.
- Remaining capex from the ₹47,000 crore plan is ~₹8,000–₹9,000 crores: This covers the DRI2 project, other items, and pending performance-linked payments, with FY27 capex guidance of ₹7,500–₹10,000 crores maintained.
- Consolidated performance lifted by subsidiaries: JSOL's ramp-up of major commissioned projects and Mozambique's better EBITDA on improved coal prices YoY contributed to the higher consolidated turnover and EBITDA, with the difference expected to increase in coming quarters.
Export Opportunity & Geopolitical Context
- Exports running at ~100,000 tons/month: The mix includes HRC, plates, rails, and structures, with management hopeful that EU quota relaxation and FTA negotiations will open a larger door.
- Europe's 28-million-ton steel deficit is the prize: Management believes India stands first in line to supply quality steel to Europe, though CBAM remains an unresolved issue that the government and EU Parliament are expected to address.
- Russia-Ukraine resolution could ease coking coal costs: If the war ends and Black Sea operations normalize, coking coal prices may decline in December and January, relieving a key cost pressure for the Indian steel industry.
- Hormuz conflict forced the syngas switch: The Iran-U.S. war-driven shortage of natural gas and propane became the catalyst for a permanent fuel substitution that management now calls a structural advantage, with the West Asia conflict impact contained at $4–$5 per ton.
V.R. Sharma: "There's a steel deficit of about 28 million tons in Europe. And I think India stands the first chance to supply the right and good quality of steel to Europe."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Full-year net steel production | ~1.1 crore tons (0.48 Cr tons H1 + 0.6 Cr tons H2) | FY27 |
| Quarterly production run-rate | 0.3 Cr tons/quarter (960,000 tons/month) | H2 FY27 |
| Record quarterly production | Surpass all prior quarters | Q3 FY27 (ending Dec 2026) |
| Q4 production | Surpass Q3 records | Q4 FY27 |
| New Angul BF ramp-up | 10,500 tons/day → 11,000 → 12,000 | Within 7 days / Nov / Dec 2026 |
| Product mix | 65% flat (incl. plates), 35% long | Steady-state target |
| Slurry pipeline commercial start | Continuous non-stop operation, ₹700/ton saving | Within 2–3 days of Oct 24, 2026 |
| Slurry pipeline truck reduction | ~500 of 700+ daily trucks eliminated | Immediate from commercial start |
| Captive coal share | 65–70% of total requirement | FY27 |
| Captive coal share | Entire requirement from own mines (subject to costing) | Next year (FY28) |
| Roida mine right-of-way | Obtain clearance, full operation thereafter | By December end or January |
| Kasia mine ramp-up | 22,000 → 30,000 tons/day (capable of 50,000) | Ongoing |
| Coking coal cost impact (confirmed) | $20 per ton increase | Q3 FY27 |
| Potential further coking coal impact | Another $20 per ton | If geopolitical situation prolongs |
| Other expenses | Normalize from elevated Q2 levels | Q3 FY27 |
| New pellet plant | Installation complete, trials, commercial production | March / end-March / June 2027 |
| DRI plant (2 MTPA) | Commissioning | June 2027 (possible shipping delay) |
| Coal gasifiers (3 new, 105,000 NM³/hr) | Commissioning | June 2027 |
| Utkal B2 coal mine | Receive clearances, come on stream | FY27 |
| Annual growth capex | ₹7,500–₹10,000 crores | FY27 and ongoing |
| Net debt-to-EBITDA | Maintain below 1.5x | Through the cycle |
| New capacity investment | None until 100% utilization reached | Ongoing philosophy |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Gross revenue | ₹19,448 cr, up 44% YoY, highest ever quarterly |
| Net revenue | ₹16,704 cr, up 43% YoY, record |
| Steel sales volume | 0.24 crore tons, record Q2, up 27% YoY |
| Adjusted EBITDA | ₹2,504 cr, up 34% YoY |
| Adjusted EBITDA per ton | ₹10,529, up 5% YoY |
| Profit after tax | ₹771 cr, vs ₹844 cr in Q1 FY27 |
| Net debt | ₹14,786 cr, down ₹1,141 cr QoQ from ₹15,927 cr |
| Net debt-to-EBITDA | 1.51x, improved from 1.71x QoQ |
| Cash and cash equivalents | ₹7,237 cr |
| Capex (Q2) | ₹1,228 cr; H1FY27: ₹3,187 cr |
| Domestic sales share | ~92% of total volume |
| Flat products share | ~60%, targeting 65% including plates |
| Value-added product mix | 57% (66% in Q1 FY27); over 65% when adjusted for TMT shift |
| Plate production | >220,000 tons per month across both locations |
| Monthly exports | ~100,000 tons (HRC, plates, rails, structures) |
| Coking coal cost impact | $20 to $25 per ton increase |
| West Asia conflict cost impact | $4 to $5 per ton (same as Q1) |
| Slurry pipeline freight saving | ₹700 per ton on 20,000 tons per day, commercial start imminent |
| Captive coal share | 50%–55% of requirement; targeting 65%–70% |
| Kasia iron ore production | 22,000 tons per day, ramping to 30,000 tons per day |
| TMT production | 120,000 tons per month, down from 220,000 tons per month earlier |
| HRC spot price (end-Q2) | ~₹60,000, range in Q2: ₹51,000 to ₹60,000 |
| TMT spot price (end-Q2) | ~₹60,000, range in Q2: ₹52,000 to ₹59,000 |
| Pellet production | ~33,000 tons per day (Barbil ~18,000–20,000, Angul ~14,000), all consumed in-house |
| H1FY27 net steel production | 0.48 crore tons |
| H2FY27 net steel target | 0.6 crore tons (0.3 crore tons per quarter) |
| Full-year gross steel target | ~1.1 crore tons |
| Annual capex guidance | ₹7,500 cr to ₹10,000 cr; remaining from ₹47,000 cr plan: ₹8,000–9,000 cr |