Key Takeaways
- EBITDA surged 52% QoQ on cost relief: A ~9% drop in steel production costs, led by lower coking and thermal coal prices, more than offset a 6% volume decline and 1% softer realizations.
- A massive, non-cash write-off reset overseas bets: A standalone provision of INR 7,253 crores against overseas investments, plus a consolidated goodwill charge of INR 378 crores, cleans up the balance sheet after a tough quarter for the Australian coal mine.
- The Australian mine is a near-term drag with a fix in sight: Operational EBITDA loss of $6 million this quarter, driven by low production and coal sold as thermal rather than coking coal; a washery investment is the planned remedy.[11-12]
- The capex engine is running at full throttle: The pellet plant is near commissioning, the hot strip mill is on track for Q2 FY24, and the Monnet Power acquisition adds a low-cost, carbon-reducing power source to the slate.
- What to watch next quarter: Whether the Australian mine’s washery plan gets a firm capex number, any progress on the elusive coal mine clearances, and if the export order book converts the post-duty-cut inquiry pipeline into volumes.
Quarterly Performance: The Cost-Driven Beat
- Volumes: Sales volume fell 6% QoQ, dragged by a 48% collapse in exports after the duty was withdrawn only in November, while domestic volume slipped 1% on rake availability issues that prioritized coal movement over steel.
- Production: Output rose 13% QoQ as all plants ran at optimum capacity after a prior-quarter shutdown, with the Angul plant setting a world record of 54 heats in a single day from one BOF.
- Realizations: NSR declined 1% QoQ on soft pricing, though management noted current realizations are now inching up 1–2%.
- Cost tailwind: SMS costs dropped 9% QoQ, powered by an ~18% fall in coking coal prices and a ~17% fall in thermal coal prices, while iron ore prices stayed flat.
- Working capital: A net reduction of INR 713 crores came from a deliberate focus on cash and inventory reduction, with finished goods inventory building by only ~35,000 tons after a near-total Q2 wipeout.
- Logistics pinch: Rake availability issues, driven by the government’s coal movement focus, continue to hamper raw material and finished goods movement; the company is compensating with road transport and buying its own wagons, but wagon procurement is delayed by a wheel shortage in India.
Ramaswamy: "As per our practice, we do not provide any forward guidance on numbers for the subsequent quarters."
Overseas Subsidiaries: The Write-Off and the Australian Problem
- The impairment: An independent valuation triggered a standalone provision of INR 7,253 crores against overseas investments, while at the consolidated level, goodwill and other assets of INR 378 crores were charged off as one-off exceptional items; a deferred tax asset of INR 1,900 crores was created in this quarter.
- Mozambique, South Africa, Australia: The main operating entities generated an operating EBITDA of ~$20 million, which shrank to just $4 million after FX adjustments.
- Australian mine losses: The operation posted an operational EBITDA loss of $6 million this quarter because production volumes remain far below intended capacity, NSR collapsed from $197/tonne last quarter to $69/tonne this quarter, and high ash content forced the coal to be sold as thermal coal rather than higher-value coking coal.
- The fix: Management is negotiating with parties that have washing capacity to sell as coking coal, and is evaluating a small washery capex investment; a clearer view is promised by next quarter, with proper mining and beneficiation expected after June.
- No more cash: Management stated there is no current plan to invest anything further in any overseas subsidiary.
- QoQ improvement: Losses were reduced by mining two phases more efficiently instead of three, cutting manpower and focusing on the right quality with lower ash.
Capex & Expansion: The Growth Slate Takes Shape
- Total capex plan: INR 24,000 crores, including the Monnet Power acquisition, with mining capex plans still being finalized and clearer numbers expected over the next quarter or so.
- Pellet plant (Angul): Very close to commissioning and under trial testing; capacity of 0.6 crore tonnes per annum, entirely for in-house consumption at Angul, which will release an equivalent volume of pellets from Barbil for external sales.
- Hot strip mill: Proceeding on a sound basis and will definitely be commissioned in Q2 FY24.
- Blast furnace and BOF: Both expected around the end of Q3 FY24.
- Slurry pipeline: Nearly half completed, but the remaining half is in tougher terrain where progress is slower than expected; completion expected by Q2–Q3 of the next financial year.
- Monnet Power acquisition: Management laid out a compelling strategic fit: contiguous land with a boundary wall next to the existing plant, a half-finished efficient power plant with a station heat rate of 2,400 vs. the existing 3,000, a 25% immediate reduction in power-related carbon footprint, shorter coal transport distance from adjacent mines, relocation of the washery to the site, and repurposing of existing 135 MW x 2 boilers for process steam to reduce future capital investment.
- Monnet Power cost and timeline: Total investment estimated at ~INR 1,500 crores, to be done in phases over a couple of years, with the goal of achieving the lowest cost of power as a pit-head plant.
Bimlendra Jha: "It made so much sense that even if we had any history of power plant or not, we could have acquired it, even if we had to dismantle that power plant."
Raw Material Strategy: The Hunt for Cost Independence
- Captive coal mines: Clearances are in process and all equipment and contractors are ready; the moment clearances come, coal can be extracted within four weeks, but the 20–30-step government process is moving slower than desired and management cannot guide on a timeline it does not control.[10-11]
- Captive coal cost advantage: Management stated unequivocally that own coal will be materially lower than the current landed cost.
- Full ramp-up: Expected within two years, with management confident in that outer limit.
- Thermal coal independence: The moment captive mines open, the company will be completely independent of thermal coal market prices.
- Coking coal price outlook: International prices are up QoQ but down YoY; the trajectory depends on China’s post-New Year demand, while India’s steel growth of 0.7 crore tons out of a global 1.7 crore ton increase may support robust domestic steel performance if raw material prices do not rise in tandem.
Bimlendra Jha: "Technically speaking, everything can finish in four weeks timeframe. But it doesn't. So what guidance do I give you on something that I don't control."
Demand & Exports: A Domestic Anchor with Export Optionality
- Domestic demand: India’s steel demand grew 12% in the first nine months, driven by infrastructure and construction, which is JSP’s entire portfolio focus; management expects demand this quarter to be good.
- Export recovery: Exports were weak for two quarters because the duty withdrawal in November 2022 came after the quarter was already booked out; inquiries have since picked up and the order book has moved from miniscule to decent levels, with decisions made on a highest-value basis comparing domestic alternatives.
- Sales confidence: Barring rake issues, management expects to sell everything produced, but declined to give volume guidance for Q4 or FY24, and would not confirm an analyst’s assumption that JSP would grow at 7–8% if the industry grows at 6–7%.
Bimlendra Jha: "India, we see walking toward different drumbeat compared to rest of the world, which might open up a similar kind of a possibility that happened in the past where the raw material prices, if they don't pickup as much as what happens on the steel demand side, then you can look at robust performance by steel players in India."
Balance Sheet & Capital Allocation: Debt Capacity with Discipline
- Capital structure shift: The company is moving toward zero net debt at the HoldCo level, with entities like JSO doing borrowing and investment on a 100%-owned subsidiary model.
- Debt ceiling: Maximum debt target is 1.5x EBITDA, so as EBITDA grows, debt capacity grows, but management emphasized that capacity does not mean it will be used; headroom is kept for ambitious plans and acquisition opportunities.
- Refinancing and short-term loans: The company concluded refinancing of loans worth INR 1,728 crores and took short-term loans of ~INR 410 crores for the acquired power assets.
- Inorganic appetite: The company is on the lookout for good assets like NMDC or RNL and will evaluate them as and when they come.
- Decarbonisation: The stated ambition is to eventually become a net-zero emission company; the Monnet Power acquisition is positioned as part of that journey, not contradictory to future renewable investments, with a parallel ambition to tie up 1 GW of renewable power and existing CGP-based DRI already using hydrogen as a reductant via syngas.
Bimlendra Jha: "Having an ability to invest is more important thing than actually investing all the time."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Hot strip mill commissioning | Will definitely be commissioned | Q2 FY24 |
| Blast furnace and BOF commissioning | Both to come up | End of Q3 FY24 |
| Slurry pipeline completion | Expected definitely | Q2–Q3 next financial year |
| Australian mine improvement | Proper mining and coal beneficiation yielding better gains after washery investment | After June |
| Australian washery capex clarity | Clearer view on capex investment | Next quarter |
| Captive coal mine full ramp-up | Full ramp-up within two years | Within two years |
| Monnet Power total investment | ~INR 1,500 crores, done in phases | Over a couple of years |
| Mining capex plan clarity | Clearer numbers on mining capex | Over the next quarter or so |
| Write-off provision evaluation | Further evaluation before firming up position | One or two more quarters |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Standalone adjusted EBITDA | ₹2,163 cr, 52% higher QoQ |
| Consolidated EBITDA | ₹2,296 cr, 51% higher QoQ |
| EBITDA per metric ton | ₹11,183, improved QoQ |
| Consolidated profit after tax (before exceptional items) | ₹897 cr |
| Consolidated profit after tax (reported) | ₹518 cr, 137% higher QoQ |
| Standalone profit after tax (excluding one-offs) | ₹836 cr |
| Standalone net loss (reported) | ₹4,512 cr, driven by ₹7,253 cr provision against overseas investments |
| Sales volume | 0.19 crore tons, 6% decline QoQ; domestic volume down 1%, exports down 48% |
| Production volume | 0.21 crore tons, 13% increase QoQ |
| Net sales realization (NSR) | Declined 1% QoQ; current realizations inching up 1–2% |
| SMS costs | Declined 9% QoQ, driven by lower coking coal (down ~18%) and thermal coal (down ~17%); iron ore flat |
| Overall steel production cost | Reduced ~9% QoQ, driven by raw material mix |
| Export share of total volumes | 5%, down from 11% in Q2 FY23 |
| Gross debt | ₹10,983 cr |
| Net debt (standalone) | ₹7,478 cr |
| Consolidated net debt | ₹7,090 cr, 0.66x EBITDA |
| Cash flow from operations | ₹2,164 cr |
| Closing cash balance | ₹3,505 cr |
| Total capex during the quarter | ₹1,965 cr, comprising ₹939 cr in Jindal Steel Odisha, ₹642 cr in JSP, ₹410 cr in Monnet Power |
| Provision against overseas investments (standalone) | ₹7,253 cr |
| Deferred tax assets created (related to provision) | ₹1,900 cr |
| Australian coal subsidiary NSR | $69/tonne, down from $197/tonne in Q2 FY23 |
| Australian coal subsidiary operational EBITDA | Loss of $6 million [11–12] |
| Overseas operating entities EBITDA (Mozambique, South Africa, Australia) | ~$20 million operating EBITDA; $4 million after FX adjustments |
| Finished goods inventory build-up | ~35,000 tons |
| Angul plant world record | 54 heats in a day during October |
| Monnet Power total investment estimate | ~₹1,500 cr, to be done in phases over a couple of years |
| Total capex plan (including Monnet) | ₹24,000 cr |
| Maximum debt target | 1.5x EBITDA |
| Renewable power tie-up ambition | 1 GW |
| Steel demand growth (first nine months of FY23) | 12% increase, mostly from infrastructure and construction |