Key Takeaways
- Volume-led revenue growth, but margin slipped: Net revenue rose 5% QoQ on higher sales volumes, yet adjusted EBITDA per tonne fell 2% as lower Tensa mine output pushed up costs.
- Angul blast furnace 2 is imminent: Commissioning begins this quarter, with hot metal flowing to customers within weeks and no certification delay, marking the start of a multi-quarter volume ramp.
- Capex envelope expands by ₹15,000 crores: A new 3-year program targets cost efficiency, value-added products and supply chain, lifting the total outlay to ₹23,000 crores on a cash flow basis.
- Balance sheet stays disciplined: Net debt to EBITDA touched 1.4x, which management calls the peak, with a commitment to stay under 1.5x across cycles.
- What to watch next quarter: Whether BF2 commissioning stays on schedule, the pace of the volume ramp toward a 0.2 crore tonne quarterly run rate, and the promised iron ore cost relief of ₹100–200 per tonne.
Volume Ramp & the Angul Expansion
- BF2 is the near-term catalyst: Commissioning is expected within Q4 FY25, and because hot metal can be delivered to customers immediately, the volume uplift begins straight away.
- Ramp-up trajectory: Management expects volumes to increase quarter-on-quarter through FY26, with full potential realized toward the end of FY26 and partly into early FY27.
- 0.2 crore tonne quarterly run rate: The company is hopeful of crossing this milestone in Q1 FY26, which would represent a step-change from current levels.
- HSM utilization was deliberately dialled down: In Q3, the hot strip mill ran below capacity because of the market correction in HRC prices and limited steel availability within the plant; the product mix was tweaked between longs and flats in response.
- BF2 utilization target: Management expects to reach 70–75% capacity utilization by the end of FY26, with the exit run rate at full ramp-up.
Malhan: "The day we start getting hot metal, it's getting added to the customer delivery straight away."
Realization & Product Mix
- Blended NSR fell on mix, not pricing power: Realization was dragged down because Angul moved into flats, where HRC prices corrected 9–10% QoQ, while longs (rebar) rose ~₹2,000 per tonne. The product mix shifted from 48% flats to 41% flats sequentially.
- Value-added sales grew 6% QoQ: This partially offset the mix headwind and signals demand for higher-margin products.
- Steel price outlook is cautiously optimistic: Management is hopeful that Q4 prices will improve over Q3 averages, citing infrastructure spending and government thrust, but remains mindful of Chinese import pressure.
- Domestic market backdrop: Production rose 6% QoQ while consumption grew only 4%; imports dropped 13% as order bookings slowed after the government launched an investigation into steel imports from Vietnam.
Costs: The Tensa Drag & Q4 Relief
- Tensa mines drove the EBITDA per tonne miss: Despite a 1% higher realization and lower coking coal costs, EBITDA per tonne fell QoQ because production from the captive Tensa mines was lower, per the approved mining plan.
- The impact was material but temporary: Management did not quantify the Tensa cost hit but stated that production will ramp up again in Q4 and costs will stabilize.
- Angul pellet plant is back on track: Utilization had dropped to 40% in Q2 and November–December due to technology issues; those are now fixed and utilization is running at roughly 90%.
- Coking coal tailwind continues: Prices fell $39 per tonne in Q3, in line with guidance, and management expects a further reduction of around $10 per tonne in Q4.
- Iron ore costs to ease: The company expects a ₹100–200 per tonne reduction in iron ore prices over Q4.
Capex: The New ₹15,000 Crore Layer
- What the new program covers: Cost efficiency, sustainability, increasing the share of value-added products, and improving the integrated supply chain, spread over the next 3 years.
- Total capex now ₹23,000 crores over 3 years: This is on a cash flow basis, excluding import GST credit, and will be firmed up as each year approaches. The ₹7,388 crores remaining from the earlier ₹31,000 crore program is for the current project; the rest is for enhancement projects.
- Key projects within the new envelope: A 200,000-tonne galvanizing line and a downstream color coating line of similar capacity; a 250,000-tonne Q&T capacity addition each at Angul and Raigarh; a pipe conveyor connecting coal mines to the works; and a transmission line for renewable energy grid connectivity in the Raigarh belt.
- Port project is outside the ₹31,000 crore envelope: It is a 51:49 JV with a group company and was not included in the earlier capex.
- ROCE discipline: Every project is evaluated for high-teens ROCE, and management states that capital allocation monitoring is in place.
- No comprehensive capacity list provided: When asked for a full breakdown of tangible units or products for the ₹15,000 crores, management gave examples but did not supply a complete schedule.
Gupta: "We maintain high teens ROCE for every project evaluation. So all of these projects have gone through that evaluation or will go through an evaluation because this is a futuristic outlook."
Raw Material Security & Mines
- Utkal B1 mine on track: Approvals have been secured and the mine is expected to start by the end of Q4 FY25.
- Utkal C coal production: The environmental clearance target of 0.34 crore tonnes is expected to be achieved in Q4, with close to 100,000 tonnes of production anticipated.
- Captive sufficiency ambition remains open-ended: When asked about increasing the percentage of captive iron ore and coking coal, management said it is "under discussion" and "a matter of time and opportunity," declining to give a specific target.
- Mill 2 in the coal loading complex: Expected to start imminently, described as "a couple of hours basis."
Balance Sheet & Capital Allocation
- Net debt to EBITDA peaked this quarter: The ratio touched 1.40x, which management says will be the peak, with a commitment to maintain it under 1.5x across cycles.
- Higher net debt is project-linked: The increase reflects payouts related to the Angul expansion as projects move toward commissioning.
- No absolute debt exit number given: When asked for an expected exit run rate for debt in the current year, management reiterated the 1.5x ceiling without quantifying an absolute figure.
- Next leg of crude capacity expansion is still forming: Plans for capacity beyond 16 MTPA are under discussion; details on the next blast furnace are almost finalized and will be shared "very soon."
Gupta: "We had the lowest capex per tonne in the industry, and we have built it the fastest, we started it in 2022, and we are in 2025, and we are saying we are getting ready for commissioning."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Blast furnace 2 commissioning | Commissioning to commence; hot metal delivered to customers within weeks | Q4 FY25 |
| Quarterly volume run rate | Cross 0.2 crore tonnes | Hopeful in Q1 FY26 |
| BF2 capacity utilization | Reach 70–75% utilization | By end of FY26 |
| BF2 full ramp-up | Exit FY26 at full ramp-up rate | FY26 exit |
| Coking coal cost reduction | ~$10 per tonne decline | Q4 FY25 |
| Iron ore cost reduction | ₹100–200 per tonne decline | Q4 FY25 |
| Net debt to EBITDA | Maintain under 1.5x; 1.40x is the peak | Across cycles |
| Utkal B1 mine start | Approvals secured; delivery on track | End of Q4 FY25 |
| Utkal C coal production | Achieve 0.34 crore tonne EC target | Q4 FY25 |
| CRM complex | Commissioning | Q1 FY26 |
| Slurry pipeline | Committed to delivery | Q1 FY26 |
| New capex program | ₹23,000 crores on cash flow basis over 3 years | FY26–FY28 |
| ROCE on new projects | High teens for each project | Ongoing |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Net revenue | ₹11,771 cr, up 5% QoQ |
| Adjusted EBITDA (consolidated) | ₹2,133 cr, flattish QoQ |
| Adjusted EBITDA per tonne | ₹11,209, down 2% QoQ on higher iron ore costs |
| Profit after tax | ₹909 cr, up 6% QoQ on forex gain |
| Net debt to EBITDA | 1.4x |
| Consolidated net debt | ₹13,551 cr, up from ₹12,464 cr in Q2 |
| Capex (quarter) | ₹2,857 cr |
| Cumulative capex under current expansion | ₹23,612 cr |
| Production | 0.2 cr tonnes, up 3% YoY |
| Sales volume | 0.19 cr tonnes, up 5% YoY, led by surge in exports |
| ASP (NSR) | ₹60,931 per tonne, up 1% QoQ from ₹60,150 |
| Long product share | 59% of sales, vs 52% in Q2 |
| Flat product share | 41% of sales, vs 48% in Q2 |
| Coking coal cost change | Down $39 per tonne QoQ |
| Iron ore cost change | Up ₹96 per tonne QoQ |
| Pellet plant utilization (Angul) | ~90% |
| External metallics purchase (9M FY25) | Practically zero |