Key Takeaways
- Volume-led quarter, margin squeeze: Sales volume grew 7% QoQ on export strength, but adjusted consolidated EBITDA fell 2% QoQ as higher iron ore costs and inventory write-downs of ~₹250 crores ate into improved realizations.
- Australia cleanup appears final: A further ₹245 crores impairment was taken at the Australian subsidiary level, and management believes the combined provisions across entities now represent a full and final position on the Wollongong asset.
- Pellet plant near, coal blocks advancing: The first 0.6 crore ton pellet plant is under commissioning with commercialization expected within weeks, while Utkal-C and Gare Palma coal blocks are at advanced clearance stages.
- Capital allocation reset imminent: The entire project slate and 3-year CAPEX program is under review with potential configuration changes; a finalized policy is promised within weeks.
- What to watch next quarter: Whether the 1-2% realization softening firms or deepens, the pace of pellet plant ramp-up, and the concrete CAPEX and capital allocation plan when it lands.
Volume & Realization Dynamics
- Export surge drove the quarter: Export share jumped to 11% of volumes from 5% last quarter, while domestic volume grew only 1% QoQ. Management framed exports as a relationship-maintenance tool and a demand-supply pressure release valve, not the business mainstay.
- Production hit by unplanned DRI shutdown: Production fell 2% QoQ because the DRI plant in Angul went offline in January due to heat exchanger issues. The plant has since been repaired and is working well.
- Realization gains offset by cost jump: Realization improved 3% QoQ across both domestic and export channels, but SMS cost rose 2% QoQ. The driver was OMC iron ore prices climbing from ₹3,550 per ton to ~₹5,700 per ton, with the gap versus NMDC prices opening up sharply from November 2022.
- Near-term softening flagged: Management noted a 1-2% softening in realizations already visible in the current quarter and said they will watch how it plays out.
- Inventory overhang in the system: Management acknowledged inventory buildup across major steel players, with March inventory still not washed out and some players sitting on high inventories and taking varied pricing actions.
Jha: "November '22 the prices of iron ore fines from NMDC were 2,760 and Odisha was 3,550. So, this gap has really opened up."
Cost Structure & One-Time Charges
- Inventory write-downs of ~₹250 crores: The Q4 EBITDA includes write-downs and write-offs on finished goods and raw materials assessed as having impaired realizability: old gran-shots, iron ore fines, slag, and Panther Shorts. Some iron ore fines had become physically unextractable, effectively part of the ground.
- No high-cost inventory carried into Q1: Management stated there has been some respite and the company is not carrying high-cost inventory into the new quarter.
- Impairment on Australian asset: The ₹245 crores provision this quarter was taken by the Australian subsidiary based on its standalone realizability assessment. This sits alongside the prior quarter's ₹7,700 crores impairment provision, which was taken in JSP India's books against its investment in JSP Mauritius. Both relate to the same underlying Wollongong asset but reside in different entities' books. Management believes the combined provisions are now final.
- Depreciation run rate steady for now: The current quarterly depreciation run rate of roughly ₹600 crores is a fair assumption for the next few quarters, though it will change as the capital expansion program comes online and assets get capitalized.
Australia: Wollongong Asset Turnaround
- Asset has underperformed: Management acknowledged the Australia business has not delivered the value it was supposed to deliver.
- Operational actions underway: Shift-level changes have been made, mining faces that were not giving returns have been stopped, issues with Multibolters are being resolved, and an FGX is being installed. These are described as small CAPEX items.
- Bottoming-out call: Management stated the asset "has probably seen its bottom" and expressed confidence that within a couple of quarters positive reports should be visible, though they declined to quantify expected returns.
- Cash burn undisclosed: When asked for the FY23 cash burn on the Australian asset, management deferred, saying they would share exact details after the call.
Jha: "We are quite confident that within a couple of quarters we should be seeing positive reports from that side. That is where we are as of now. We are not able to say with certainty to you that this is the amount of money that we'll make or anything like that but it has probably seen its bottom."
Expansion Pipeline & Coal Security
- First pellet plant imminent: The 0.6 crore ton pellet plant is under commissioning with successful trials completed; full-fledged commercialization is expected within weeks.
- Second pellet plant tied to blast furnace: The second 0.6 crore ton pellet plant will be commissioned almost concurrently with the second blast furnace, towards the end of the financial year.
- Hot strip mill and blast furnace timeline: The hot strip mill is expected in Q3 of the current financial year; the blast furnace towards year-end.
- Utkal-C coal block near the finish line: Most clearances are in place at the mining license stage, with one last clearance awaited. A mining plan of ~0.35 crore tons for the year has been submitted.
- Gare Palma also advancing: Mining lease permission has been received for 0.35-0.4 crore tons per annum, and the block is in a very advanced stage.
- Slurry pipeline delayed: The slurry pipeline is now expected towards the end of the current year due to elections and other issues.
- Optimum utilization tied to downstream: Management stated optimum capacity utilization of the 0.96 crore tons upstream capacity should come when the hot strip mill and slab caster open, since metallics will eventually become the constraint again due to pull from downstream units.
Jha: "Hopefully we have improved as management. That is all I can say."
Capital Allocation & Balance Sheet
- Full project slate under review: Management is evaluating the entire slate of projects, looking at making changes to configuration, and expects to finalize over the next few weeks. The capital allocation policy including the 3-year CAPEX program is also under finalization.
- Net debt to EBITDA ceiling of 1.5x: Policy is to remain below 1.5x net debt to EBITDA through the cycle. Management explicitly stated they would not like to violate this even in a down cycle.
- Zero net debt ambition for JSP: JSP is well on its way toward zero net debt. Most future debt will potentially reside in JSO, the new wholly owned subsidiary, where ₹15,700 crores of debt has been sanctioned but nothing drawn down yet. Drawdowns will begin as EC approvals come through.
- Growth ambition with discipline: Management aims to be the largest steel producer at a single location in Odisha and will constantly evaluate investment and acquisition opportunities, while keeping gunpowder dry and remaining disciplined about the 1.5x debt tolerance.
- Dividend declared: The board recommended a dividend of ₹2 per share for the financial year.
Jha: "Even in the down cycle I wouldn't like to violate 1.5x, I did say that and I'm sticking my neck out of it saying that yes, we'll do it."
Demand Environment & Market Positioning
- India demand trajectory positive: Management cited World Steel Association consensus projections of 0.8 crore tons of demand addition this calendar year and 1.6 crore tons over less than 18 months. Positives were noted in construction, auto, yellow goods, and white goods.
- Near-term subdued: Demand may be a little subdued in the immediate term due to March pressure and inventory overhang in the system.
- Export strategy is flexible and relational: Exports serve two purposes: maintaining long-term customer relationships (some broken when government policy shifted, causing supply chains to move away) and acting as a pressure release valve for domestic demand-supply imbalances.
- Supplier quality emphasized for new capacities: Management stressed they have chosen top-tier suppliers for the expansion: SMS for the hot strip mill, Danieli for the caster, and Metso for the pellet plant.
Jha: "Arijit have you met a marketing guy who ever says that prices I can get much more? They always tell you that competition is not pricing…"
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Pellet plant commercialization | First 0.6 crore ton plant full-fledged operations | Within weeks |
| Capital allocation policy release | 3-year CAPEX program and project slate finalized | Over the next few weeks |
| Utkal-C coal block opening | Mining license stage; one last clearance awaited | "Anytime" |
| Hot strip mill commissioning | Expected in Q3 | Q3 FY24 |
| Blast furnace commissioning | Second blast furnace | Towards end of FY24 |
| Second pellet plant commissioning | Concurrent with second blast furnace | Towards end of FY24 |
| Slurry pipeline completion | Delayed by elections and other issues | Towards end of current year |
| Net debt to EBITDA ceiling | Below 1.5x through the cycle, including down cycles | Ongoing |
| Australia asset turnaround | Positive reports expected | Within a couple of quarters |
Key Metrics
| Metric | Q4 FY23 |
|---|---|
| Sales volume | 0.2 crore tons, +7% QoQ |
| Production volume | 0.2 crore tons, -2% QoQ |
| Realization | +3% QoQ, with current softening of 1-2% |
| Export share | 11% of volume, up from 5% in Q3 |
| SMS cost | +2% QoQ, driven by higher iron ore and pellet prices |
| Consolidated adjusted EBITDA | ₹2,240 cr, -2% QoQ |
| Standalone India adjusted EBITDA | ₹2,178 cr |
| Overseas subsidiaries adjusted EBITDA | ₹63 cr (Australia, Mozambique, South Africa) |
| Consolidated PAT | ₹466 cr, -10% QoQ |
| Exceptional items | ₹153 cr, expenses on old projects written off |
| Inventory write-downs and write-offs | ~₹250 cr, included in EBITDA |
| Standalone gross debt (Mar 31) | ₹11,874 cr |
| Standalone net debt (Mar 31) | ₹7,090 cr |
| Gross debt (April, post prepayment) | ₹8,984 cr, after prepaying ₹1,895 cr in April |
| Net debt to EBITDA | ~0.7x |
| Dividend | ₹2 per share |
| Full year FY23 volume | 0.77 crore tons, +1% YoY |
| Full year FY23 production | 0.79 crore tons, -2% YoY |
| Full year FY23 consolidated adjusted EBITDA | ₹9,700 cr |
| Full year FY23 PAT | ₹3,193 cr, after exceptional items of ₹1,369 cr |
| Full year FY23 standalone operating cash flow | ₹6,351 cr |
| Full year FY23 CAPEX | ~₹5,800 cr (JSP and JSO) |
| Australia subsidiary impairment (depreciation) | ₹250 cr |
| Utkal-C coal block mining plan | ~0.35 crore tons submitted for FY24 |
| Gare Palma mining lease permission | 0.35-0.4 crore tons per annum range |
| Crude steel capacity | 0.96 crore tons |
| Pellet plant capacity under commissioning | 0.6 crore tons (first), another 0.6 crore tons to follow |
| JSO sanctioned debt | ₹15,700 cr, undrawn as of Q4 |
| Depreciation quarterly run rate | ~₹600 cr |