Key Takeaways
- Volume up, realizations down: Sales volume rose 11% QoQ on higher exports, but NSR fell 5% QoQ in both export and domestic markets, driving a 10% QoQ EBITDA decline.
- One-off RINL supply distorts headline numbers: Material supplied to RINL under an MoU inflated both revenue and cost per tonne; the clean steel NSR declined 5% QoQ and the ₹12,500 EBITDA per tonne is the underlying business number.
- Australian mine impairment hits PAT: A ₹360 crores non-cash impairment on the idled Australian mine, plus the lower EBITDA, pushed PAT down 52% QoQ to ₹933 crores.
- Capex discipline with growth ambition: FY25 capex guided at ₹7,500–10,000 crores, with the philosophy to spend what is earned while keeping debt in check; ~₹15,000 crores of project capex remains over the next two years.
- What to watch next quarter: Whether the ₹1,000 per tonne price hike taken since April sticks, the pace of the pellet plant and HSM ramp-up, and progress on the slurry pipeline and coal block permissions.
Volume & Realization Dynamics
- Export surge drove volumes: Export share jumped to 11% from 3% QoQ, driving the 11% volume growth; management did not disclose the split between domestic and export volumes.
- NSR under pressure everywhere: The 5% QoQ decline in clean steel NSR affected both export and domestic markets equally; a slight uptick of 1% was seen in Q1 FY25.
- RINL supply is a one-off: The apparent uptick in overall revenue and cost per tonne is due to material supplied to RINL under an MoU, booked as sales. This is not incrementally recurring every year and should be adjusted out to see the clean business.
- Price hikes already in motion: About ₹1,000 per tonne of price hikes have been taken since April 1, with further upside seen in May and June, though subject to market behavior and Chinese price movements.
- HSM conversion to capture margin: Semis sold in FY24 (0.14 crore tonnes) will be converted to HR coil through the HSM in FY25, which is expected to increase EBITDA per tonne as economies of scale play out. Rounds, a premium niche product fetching decent EBITDA, may continue depending on market conditions.
Chandak: "So you can take this as a one-off and then adjust it because this is not going to be incrementally recurring every year."
Cost & Margin Levers
- SMS costs held flat despite coal rise: Coking coal prices increased $21 QoQ, but SMS costs remained flat due to higher operational efficiency.
- Coking coal tailwind ahead: Management expects a $30–$40 reduction in coking coal prices in Q1 FY25, which would flow through to costs.
- Cost per tonne optically higher: The reported cost per tonne rose sequentially due to the RINL supply being booked on both sides; the ₹12,500 EBITDA per tonne is the clean business number.
- Value engineering as a margin lever: Management emphasized value engineering and value-added grade additions to the product basket as a margin driver beyond pure volume growth.
- Power cost advantage building: The upcoming ACPP-2 plant has a significantly lower heat rate than existing boilers and, as a pit head coal plant, will help reduce power costs. Surplus power may be sold or self-consumed depending on market conditions closer to commissioning.
Sabyasachi B.: "It's not only through volume, but also through value engineering and value-added grade addition into our basket."
Project Execution & Ramp-Up
- HSM already at 0.3 crore tonne run rate: The hot strip mill has hit the run rate for 0.3 crore tonnes; the target is 0.3–0.35 crore tonnes this year and 0.6 crore tonnes next year.
- Pellet plant ramping fast: Output rose from ~4,500+ tpd in Q4 to ~8,300+ tpd in April and 9,000–10,000 tpd in May.
- Slurry pipeline near completion: A small patch of permissions remains under negotiation; barring that, the project is on track. Electrical work, always the last phase, will follow civil work completion.
- Coal blocks within the year: Utkal B1 and B2 coal blocks are at an advanced stage, though no specific quarter or month guidance was given since matters are partly outside company control.
- Gare Palma IV/6 and Utkal C EC upgrades: Environmental clearance capacity being upgraded to 0.5 crore tonnes per annum each, expanding raw material security.
- Blast furnace and BOF2 on track: Commercial production depends on ramp-up and testing parameters; management sees no major hinderances.
Sabyasachi B.: "Other than anything which is beyond our control, meaning with administration or authorities anything that is pending, other than whatever is within our control, we are extremely confident of delivering it on time."
Australian Mine & Non-Core Assets
- Mine under care and maintenance: The Australian mine is not operating due to certain issues; management plans to operate it on a single-shaft basis after obtaining permissions, with production to start sooner once those are secured.
- Impairment is non-cash and annual: The ₹360 crores impairment relates to intangible assets carried on the subsidiary's books and arose from annual impairment testing, not a sudden deterioration.
- Subsidiary swung to loss: The Australian subsidiary reported a ₹69 crores loss in Q4 versus a ₹91 crores profit in the previous quarter, reflecting the swing from Q2 to Q3 and Q3 to Q4 rather than a direct absolute comparison.
- Power assets stay intact: No plans to dismantle any power units; decisions on selling or self-consuming surplus power from Monnet will be made after the first unit is commissioned.
Agrawal: "So this is for the intangible assets, they are carrying in their books. So right now, the Australian mines, we have taken under care and maintenance due to certain issues there. So we are not operating that mines."
Raw Material Security
- Iron ore from multiple sources: The mix includes captive mines (Tensa, Kasia) operating within EC limits, long-term agreements with NMDC and OMC, and spot market purchases.
- RINL billet supply continuing: Discussions are ongoing for higher availability; the current MoU is continuing and management expects the required quantity will be obtained. A port strike is a temporary phenomenon and supply should resume once resolved and the plant is commissioned.
- Coal mine cost savings undisclosed: Management declined to quantify cost savings from captive coal mines, calling it information not generally shared.
- Coking coal and iron ore consumption costs undisclosed: Management declined to share these numbers.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Capex spend | ₹7,500–10,000 crores, may accelerate if EBITDA higher; subject to disciplined balance sheet | FY25 |
| Remaining project capex | ~₹15,000 crores to be spent | Next 2 years |
| Maintenance capex | ~₹2,500 crores annualized | Ongoing |
| HSM volume | 0.3–0.35 crore tonnes | FY25 |
| HSM volume | 0.6 crore tonnes | FY26 |
| Coking coal price reduction | $30–$40 decline expected | Q1 FY25 |
| Price hikes taken | ~₹1,000 per tonne since April 1; further upside seen in May and June, subject to market and Chinese prices | Q1 FY25 |
| Australian mine restart | Single-shaft operation to begin after obtaining permissions | No date (permissions pending) |
| Utkal B1 and B2 coal blocks | Within the year; advanced position | FY25 |
| Slurry pipeline | Small patch of permissions under negotiation; otherwise on track | Barring that patch, on track |
Key Metrics
| Metric | Q4 FY24 |
|---|---|
| Sales volume | 0.2 crore tonnes, +11% QoQ; export share 11% vs 3% in Q3 |
| Steel NSR | -5% QoQ, lower in both export and domestic markets |
| Adjusted EBITDA | ₹2,512 cr, -10% QoQ on lower realization, partly offset by higher volume |
| PAT | ₹933 cr, -52% QoQ; includes ₹360 cr impairment provision on Australian mine |
| Adjusted EBITDA (FY24) | ₹10,231 cr, +5% YoY on lower cost and higher product mix |
| PAT (FY24) | ₹5,943 cr, +86% YoY |
| Consolidated net debt | ₹11,203 cr, vs ₹9,115 cr in Q3; increase to support capex |
| Dividend | ₹2 per share recommended for FY24 |
| Capex guidance | ₹7,500 cr to ₹10,000 cr per annum, subject to EBITDA generation and balance sheet discipline |
| Remaining capex to spend | ~₹15,000 cr over next 2 years, out of ~₹31,000 cr total plan |
| Maintenance capex | ~₹2,500 cr annualized |
| Coking coal cost expectation | $30 to $40 lower in Q1 FY25 on a consumption basis |
| Steel price increase (Q1 FY25 to date) | ~₹1,000 per tonne; further upside expected in May–June |
| HSM run rate | 0.3 crore tonnes achieved; target 0.3–0.35 crore tonnes this year, 0.6 crore tonnes next year |
| Pellet plant throughput | ~4,500+ tonnes/day in Q4; 8,300+ in April; 9,000–10,000 in May |
| Captive coal throughput (Q4) | Gare Palma IV/6: ~0.1 crore tonnes; Utkal C: ~0.09 crore tonnes |
| Semis sold (FY24) | 0.14 crore tonnes, including rounds; to be largely converted to HSM going forward |
| Australian mine impairment | ₹360 cr non-cash impairment taken on intangible assets |