Key Takeaways
- Seasonal Q2, margin reset: Revenue fell 10% QoQ and EBITDA margin compressed from 21.9% to 15.9%, driven by a concentrated maintenance shutdown across three kilns and lumpy marketing spends.
- The cost hit is one-off, not structural: Annual kiln maintenance, dealer conferences, and branding added ~₹100/ton to other expenses; management expects this to normalize as volumes recover.
- Expansion engine stays on track: Panna clinker line and grinding due by December 2025, Buxar grinding by Q4 FY26, and the large Jaisalmer integrated plant on schedule for Q2 FY28 commissioning.
- Pricing pressure persists, but floor may be near: October prices marginally below Q2, with southern and non-trade segments soft; white cement and putty margin pressure has "bottomed out."
- What to watch next quarter: Whether other expenses normalize by the promised ~₹100/ton, the pace of volume recovery toward the ~10% full-year guide, and any stabilization in cement pricing post-GST reduction.
Quarterly Performance: The Maintenance Overhang
- Revenue drop: 10% QoQ decline reflects the seasonal lean period, compounded by kiln shutdowns that pulled down cement sales even as clinker production hit its highest level.
- Margin compression mechanics: EBITDA margin fell 600 bps QoQ. The primary driver was other expenses, inflated by annual maintenance of three kilns, cement mill upkeep, dealer conferences, branding work, and foreign tours, all concentrated in Q2.
- Power and fuel distortion: Reported power and fuel cost rose because clinker stock build added ~₹30/ton, and waste heat recovery power generation was lost during kiln maintenance, costing ₹10–12 cr total (₹15 lakh/day/kiln).
- Lease distance spike: Higher lease distance reflects seeding the Bihar market ahead of the Buxar grinding unit commissioning in Q4; this should drop to 12–15 km once Buxar is operational.
- Regional mix: Major growth came from the south (low base due to prior-year plant maintenance) and central India (expansion investments); the north was flattish at ~5–6%. Management declined to share a quantified regional split.
Saraogi: "Again, whether announcements have been made, yes, mostly it will all come. There would be, you could have a period of lower capacity utilization and it will take time to settle down. So, it would be not only for us, it would be for the industry, whatever. So, at this point of time, yes, there would be intense competition. But we are definitely prepared for it."
Expansion Projects: Timeline and Spend
- Panna integrated plant: The 0.6 cr ton project is at an advanced stage; the clinker line and cement grinding are expected to complete by December 2025. A 0.1 cr grinding unit at Prayagraj was commissioned in October.
- Buxar grinding: The 0.3 cr greenfield grinding unit in Bihar is on track for Q4 FY26 (Jan–Feb 2026), which will reduce lease distance and open the Bihar market.
- Jaisalmer mega project: Orders placed for most plant and equipment; site work has started for the integrated 4-million-ton clinker and 3-million-ton grinding facility. Commissioning expected in Q2 FY28, with a go-to-market strategy already initiated.
- Spread grinding locations: Land for Punjab and Rajasthan grinding units (0.2 cr tons each) is being finalized; work targeted to start in Q4 this fiscal, with commissioning along with clinkerization in Q2 FY28.
- Nathdwara wall putty: The 6 lakh ton greenfield plant has started construction; commissioning expected by Q2 FY27.
- CapEx trajectory: FY26 spend guided at ₹2,700–2,800 cr; FY27 at over ₹3,500 cr (±₹200 cr). Jaisalmer alone will consume ₹700–800 cr in FY26–FY27, with total project cost at ₹4,800 cr and ~₹3,500 cr spent by FY27.
- Debt peak: Incremental borrowing for Jaisalmer is ~₹3,000 cr; net debt expected to increase by ~₹2,000 cr.
Subsidiaries: Toshali, Saifco, and UAE
- Toshali (merged this quarter): No operating profit so far; expected to reach break-even this fiscal. On the limestone mining lease, management stated the state government will not grant a lease without auction, with no further clarity.
- Saifco (brand relaunched in August): Current volume of 20,000 tons/month is below potential; debottlenecking is planned to achieve ~10% market share of the 0.4 cr ton regional market. Expected to be at zero profit this fiscal, turning profitable from next fiscal. A capacity expansion by 30% is possible, but a new higher-capacity line is on hold.
- UAE white cement: Profitability faces headwinds from Asian Paints moving to produce white cement in UAE for its own consumption. New product lines (dry mix, construction chemicals) are being developed as offsetting profit pools. Overall UAE profitability expected to be maintained; Q2 may be lower, but the first nine months should be comparable or better than last year.
- Africa: Wall putty sales are growing in the region.
Management: "This number is lower. This is why we entered. We have to see there is a lot of potential. There is some debottlenecking to be done at the plant, which we are planning how to do it and working on the timeline for that. Once we do that, so that we can do higher volume numbers and at least get what you are saying is right, get about 10% market share."
Demand, Pricing, and Competitive Dynamics
- Volume growth: First-half growth of 15% was on a lower base due to prior-year maintenance; full-year guidance maintained at ~10%, implying ~2 crore tons volume. Management expects the industry to end around 7–8% growth.
- Pricing pressure: Post-GST reduction, benefits were passed on to the market. October prices were marginally down versus Q2, with pressure concentrated in the southern region and non-trade segments. Management expects pressure to reduce going forward.
- Trade vs non-trade mix: Non-trade is about one-third of volume; strategy is to maintain a ~70:30 trade-to-non-trade ratio, though the trade percentage may marginally reduce if market growth comes from non-trade. Trade volumes grew well; non-trade also increased.
- Premium products: Marginal increase in Q2 sales; company is pushing premium products as demand rises, but cannot attribute the uptick specifically to the GST reduction.
- LC3 launch: The calcine clay product has been launched with marketing efforts underway; it represents a new product line over and above normal sales, though no volume numbers were shared.
- Industry capacity cycle: Management acknowledged that announced capacities will mostly come on stream, leading to a period of lower utilization and intense competition, but stated the company is prepared and plans to grow above market growth with its expansion.
Costs, Incentives, and Paint Business
- Other expenses normalization: Expected to reduce by ~₹100/ton going forward as volumes recover from the maintenance-heavy Q2.
- Cost savings program: FY26 exit run-rate targeted at ₹75–90/ton savings; balance ₹75–80/ton to be captured in FY27.
- Incentive trajectory: Run-rate is ~₹50 cr lower this fiscal; from FY27, incentives rise to ~₹300 cr including the Bihar subsidy. FY28 will see partial Jaisalmer incentives but some Nimbahera subsidies ending. GST reduction extends the incentive period for Jaisalmer and GST-based grinding units, without reducing the total amount.
- Paint business: Working toward ₹600 cr revenue and break-even for FY27. Gross margin improvement is targeted over last year, though management declined to share specific H1 or Q2 gross margin figures.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Panna clinker line and grinding completion | 0.6 cr ton integrated plant | December 2025 |
| Buxar grinding unit commissioning | 0.3 cr greenfield grinding in Bihar | Q4 FY26 (Jan–Feb 2026) |
| Nathdwara wall putty plant commissioning | 6 lakh ton greenfield plant | Q2 FY27 |
| Jaisalmer integrated plant commissioning | 0.4 crore ton clinker, 0.3 crore ton grinding | Q2 FY28 |
| Spread grinding locations (Punjab, Rajasthan) | 0.2 cr tons each; work start Q4 FY26 | Q2 FY28 commissioning |
| FY26 volume growth | ~10% growth, ~2 crore tons | FY26 |
| FY26 CapEx | ₹2,700–2,800 cr | FY26 |
| FY27 CapEx | Over ₹3,500 cr (±₹200 cr) | FY27 |
| Other expenses normalization | Reduce by ~₹100/ton from Q2 elevated level | Going forward |
| Cost savings exit run-rate | ₹75–90/ton | FY26 exit |
| Toshali break-even | No operating profit so far | This fiscal (FY26) |
| Saifco profitability | Currently at zero profit | From next fiscal (FY27) |
| Paint business revenue and break-even | ₹600 cr revenue, break-even | FY27 |
| UAE profitability | Maintain profitability, make reasonable profit | Full year |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Standalone revenue from operations | ₹2,859 cr, +19% YoY, -10% QoQ |
| Consolidated revenue from operations | ₹3,019 cr, +18% YoY, -10% QoQ |
| Standalone EBITDA | ₹440 cr vs ₹271 cr YoY, ₹673 cr QoQ |
| Standalone EBITDA margin | 15.9% vs 11.5% YoY, 21.9% QoQ |
| Consolidated EBITDA | ₹447 cr vs ₹284 cr YoY, ₹688 cr QoQ |
| Standalone profit before tax | ₹261 cr vs ₹60 cr YoY, ₹498 cr QoQ |
| Consolidated profit after tax | ₹159 cr vs ₹136 cr YoY, ₹324 cr QoQ |
| Earnings per share | ₹20.7 vs ₹16.2 YoY, ₹41.90 QoQ |
| EBITDA per ton | ₹902 vs ₹639 YoY, ₹1,229 QoQ |
| Net debt | ₹3,139 cr vs ₹2,551 cr as of Mar 31 |
| Net debt to EBITDA | 1.34x as of Sep 30 vs 1.3x as of Mar 31 |
| Volume growth guidance | ~10% for FY26, with ~2 crore tons volume target |
| Full-year CapEx guidance | ₹2,800–3,000 cr for FY26 |
| Paint revenue | ₹95 cr in Q2, ₹182 cr in H1; full-year guidance closer to ₹400 cr |
| Paint EBITDA loss | ₹14 cr in Q2 |
| Incentive quantum | ~₹70 cr in Q2 |
| Cost saving program | ₹75–90 per ton exit rate expected in FY26, out of ₹150–200 total target |
| Industry demand expectation | 7–8% for FY26 |